Groundwork of Fort Lauderdale, FLCall (844) 665-0162
A Groundwork company - serving Fort Lauderdale, FL
Garage Conversion ADU in Kendall, FL | Groundwork Construction Co. of South Florida

Garage Conversion ADU in Kendall - Same-Day Service, Done Right the First Time

Professional garage conversion adu services in Kendall, FL. Licensed & insured. Same-day and after-hours emergency service available.

144+
Cities Served
Fast
Emergency Response
Licensed & Insured Fast Response Free Estimates All Brands Satisfaction Guarantee

What Does a Garage Conversion ADU Cost in Kendall, FL?

A garage conversion ADU in Kendall typically runs $30,000-$80,000 and takes 8-14 weeks from permit pull to final inspection. You’re keeping the existing slab and walls but adding a kitchenette, full bath, separate HVAC, and a legal egress window or door. Call (844) 665-0162 and we’ll walk your specific garage and give you a written estimate with line-item pricing.

Call (844) 665-0162

Most Kendall homeowners we meet in neighborhoods near Dadeland or around Snapper Creek are sitting on 400-600 square feet of underused concrete-block garage space built in the 1970s or 1980s. The question isn’t whether the structure can become living space - it usually can. The question is what the existing slab, roof tie-downs, and electrical service can handle without expensive surprises.

We converted a two-car garage near Southwest 88th Street last spring where the slab had settled unevenly after years of parking heavy trucks. The homeowner didn’t know until we pulled the old door track and found a 2-inch dip across the center bay. We brought in a specialized mud-jacking crew - one of the realities of working over Miami Limestone where subsurface voids form - leveled the slab, then built the ADU. That project landed near the top of our range. A dry, level garage with 200-amp service already in place, like one we did off Kendall Drive, hit the mid-$40s.

This page is part of a full Home Additions & ADU in Kendall project. If you’re still weighing whether to convert the garage, build new, or add a room, our Home Additions & ADU crew can compare all three paths during one site visit.

How We Convert a Garage to an ADU - Start to Finish

We break every garage conversion ADU into five stages. Each has a clear deliverable and a decision point where you either move forward or adjust scope.

Stage 1: Site assessment and feasibility (3-5 days)

We measure every dimension, test the slab for level and load capacity, map existing electrical and plumbing locations, and photograph roof-to-wall connections. You’ll get a written feasibility memo with two or three layout options. This is when you decide: studio layout or one-bedroom? Kitchenette against the back wall or the side? We also flag early if your main electrical panel needs upgrading - common in 1970s Kendall homes with 100-amp service.

Stage 2: Design, engineering, and permit documents (3-5 weeks)

Our architect produces stamped plans showing the new kitchenette, bath layout, HVAC routing, and egress. For Kendall specifically, every window, door, and roofing product specified must carry a current Miami-Dade NOA for High Velocity Hurricane Zone use. We maintain standing relationships with HVHZ-approved suppliers - we don’t source from big-box stores where NOA paperwork is often missing or expired. You’ll approve every product spec before submission.

Stage 3: Demolition and rough construction (2-3 weeks)

The garage door comes out. We frame in the new wall, install the egress window or door, run new electrical and plumbing rough-in, and set the mini-split HVAC lines. If your garage shares a roofline with the main house, we inspect the existing tie-down hardware - pre-1993 homes in Kendall often have non-compliant clips or missing straps from hasty post-Andrew repairs. We replace anything that won’t pass Miami-Dade inspection.

Stage 4: Mechanical, insulation, and finishes (3-5 weeks)

Insulation goes in (we typically use closed-cell spray foam for the thermal barrier and air sealing), drywall, flooring, cabinets, countertops, fixtures, and appliances. This is where material choices drive your final number most directly. A basic LVP floor and stock cabinetry versus engineered hardwood and custom KraftMaid boxes can swing $8,000-$15,000.

Stage 5: Inspections and final walkthrough (1-2 weeks)

Miami-Dade requires rough electrical, rough plumbing, insulation, and final inspections. We schedule them sequentially and attend each one. Final walkthrough with you: we test every outlet, run the shower, dial in the mini-split, and hand over your certificate of occupancy and warranty packet.

The Choices That Shape Your Garage Conversion ADU

Every decision below moves your number and your living experience. We lay out the honest trade-offs so you’re choosing, not guessing.

  • Foundation repair vs. overlay: If your slab has settled or cracked over Miami Limestone, mud-jacking or polyurethane injection runs $2,500-$6,000 but gives you a level floor for decades. An overlay with self-leveling compound costs less upfront but can telegraph cracks through finished flooring later.
  • Kitchenette scope: Wet bar with mini-fridge and microwave ($3,000-$5,000) versus full cooktop, oven, dishwasher, and garbage disposal ($8,000-$14,000). The latter requires 240V service and grease-trap compliance in some Kendall unincorporated zones.
  • Bath configuration: Wet room with curbless shower and wall-hung toilet saves square footage and feels modern. Traditional tub-shower combo with vanity is more familiar for rental tenants and easier to maintain.
  • HVAC approach: Ductless mini-split is standard for garage ADUs - $3,500-$7,000 installed depending on BTU load. Extending your main house ductwork rarely works; garage spaces need dedicated dehumidification, and Kendall’s summer humidity will overwhelm a shared system.
  • Egress path: Code requires two exits for sleeping areas. We typically install a legal egress window ($2,500-$4,500 with well and ladder) and use the former garage door opening as the primary entry. Some homeowners add a small covered porch or stoop.
  • Exterior matching: New wall where the garage door sat must match existing stucco texture and paint. We send samples to the lab for color match and use the same aggregate size in the stucco coat. Mismatched patches are the telltale sign of a cheap conversion.

Many homeowners pair the interior finish with Cabinets & Countertops in Kendall selections from our full kitchen and bath showroom. Others extend the project to Backsplash, Tile & Flooring in Kendall continuity between the main house and new ADU.

What Garage Conversion ADU Costs in Kendall, FL

$30,000-$80,000 is the realistic range for a legal, permitted garage conversion ADU in Kendall. Here’s what pushes you to either end.

Cost Driver Low-End Scenario High-End Scenario
Garage size and condition 400 sq ft, dry, level slab, 200-amp service 600+ sq ft, settled slab, 100-amp panel upgrade needed
Kitchen and bath scope Wet bar, curbless shower, basic fixtures Full kitchen, tub-shower, premium appliances
Structural work Door-to-wall infill only Roof tie-down replacement, wall reinforcement
Material grade LVP flooring, stock cabinets, quartz-look laminate counters Engineered hardwood, custom cabinetry, Cambria or Silestone quartz
Permit and engineering Standard plan set, no variances Engineering for non-standard conditions, multiple re-submittals

What’s included in our written estimate: all labor, materials, permits, inspections, and project management. What’s typically separate: main electrical panel upgrade (if needed), well and septic modifications (rare in Kendall but possible on older parcels), and any required tree removal or setback variances. We flag these during feasibility so there are no surprise invoices.

Call (844) 665-0162 for an exact quote - estimates are free, and we’ll itemize every line so you know where your money goes.

What Kendall Homes Specifically Do to This Job

Kendall was ground-zero for Hurricane Andrew’s 1992 landfall, and that history lives in the walls of every pre-1993 garage we enter. The home you’re converting likely sits in Miami-Dade County’s High Velocity Hurricane Zone - the strictest wind-load jurisdiction in the continental U.S. Every structural component, from the roofing fasteners to the window glazing in your new egress opening, must carry a Miami-Dade Notice of Acceptance (NOA) for HVHZ use. Inspectors here will reject unlisted products on the spot. This isn’t Broward County. A contractor who sources from big-box stores and assumes “impact-rated” is enough will cost you weeks of re-submittals.

The housing stock tells its own story. West of the Florida Turnpike, we regularly work on 1970s concrete-block homes where the garage slab was poured as a non-structural element - thinner, unreinforced, sometimes sloped toward a center drain that no longer functions. Eastern Kendall near Dadeland has more post-Andrew construction, but even those homes may have garages built to older code standards since the garage wasn’t considered living space at the time.

Then there’s the rock. Western Kendall overlies the Miami Limestone formation, and solid oolitic limestone sits 6-18 inches below grade on many parcels. If your garage conversion requires any excavation - extending plumbing, adding a grease trap, or correcting drainage - the equipment rental and labor multiplier is real. We price this into our bids upfront, not as a change order.

The wet season shapes scheduling too. June through October, afternoon thunderstorms roll through reliably. We don’t pour exterior concrete aprons or stucco patches during those windows. Experienced Kendall crews build that contingency into the calendar.

Serving Kendall, FL - Our Local Coverage Area

We’re based in the Kendall area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

Frequently Asked - Garage Conversion ADU in Kendall

Ready to Convert Your Kendall Garage?

Call (844) 665-0162 to schedule a free on-site estimate. We’ll walk your garage, check your slab and electrical, and return a written proposal with real numbers and a realistic timeline. No deposit required to get started - just a conversation about what’s possible with the space you already own.

Written by Raymond Estevez, Owner at Groundwork Construction Co., serving Kendall since our founding.

Why Kendall Chooses Groundwork Construction Co. of South Florida

We set the standard for garage conversion adu in Kendall.

30-60 Min Response

Fast dispatch across Kendall. Same-day and after-hours emergency service available.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Kendall

Getting your garage conversion adu handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your garage conversion adu needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Kendall - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local garage conversion adu pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    A background-checked tech heads outLicensed & insured, typically within 1-hour.
  4. 4
    You approve before work beginsNothing starts until you say go.

What Kendall Customers Say

Trusted by homeowners across Kendall and surrounding areas.

★★★★★

"Called late on a Friday and they had someone at my door within the hour. Professional, clean work, and the price was exactly what they quoted."

Jason M. · Kendall
★★★★★

"Best in Kendall. Diagnosed the problem immediately and fixed it in under an hour. Two other companies couldn't even get me an appointment that week."

Amanda K. · Kendall Area
★★★★★

"Very impressed with the upfront pricing and professionalism. No hidden fees, no upselling - just honest work done right. My go-to company from now on."

Robert L. · Near Kendall
★★★★★

"Had an after-hours emergency and they answered right away and sent someone fast. Exactly what you want in a crisis."

Lisa P. · Kendall

Ready for Garage Conversion ADU in Kendall?

Call now for a free estimate - or request one below. Licensed, insured, and here with fast after-hours help in Kendall.

(844) 665-0162

Request a Free Estimate in Kendall

Tell us about your garage conversion adu needs - we'll respond within the hour.

When you send us your details, you agree to our Privacy Policy and authorize us to contact you through phone, text, or email concerning your request, including by the partner businesses that may perform the service.

Prefer to text? Send a Text
Areas We Serve
SunriseWilton ManorsMelrose ParkNorth Andrews GardensOakland ParkLauderhillDaniaDania BeachLauderdale LakesLauderdale-by-the-SeaBroadview ParkPlantationFort LauderdaleDavieWest Hollywood All Service Areas →
Call Now Free Estimate