A Groundwork company - serving Fort Lauderdale, FL
Full Kitchen Remodeling in Miami Lakes, FL | Groundwork Construction Co. of South Florida

Full Kitchen Remodeling in Miami Lakes - Written Fixed Price, Finish Date in the Contract

Free in-home design consult and a written, line-item quote before demo starts. The price we sign is the price you pay, with a finish date in the contract. Licensed, insured, permits handled.

Call to schedule your free estimate

23+
Years in Business
144+
Cities Served
Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

What Full Kitchen Remodeling in Miami Lakes Actually Involves

Full kitchen remodeling in Miami Lakes means stripping the space to studs, replacing every surface, fixture, and system, and rebuilding to current Miami-Dade code, typically over 6-10 weeks and running $14,000-$45,000 depending on size and structural changes. You’ll keep the same footprint or reconfigure it, but every cabinet, countertop, appliance connection, and finish is new. Call (844) 665-0162 for a free on-site estimate and written breakdown.

Call (844) 665-0162

How We Approach a Full Kitchen Remodel Start to Finish

We break every full kitchen remodeling project into five distinct phases. Homeowners know exactly where we are, what decisions are due, and how long until they’re cooking again.

Phase 1: Demolition and discovery (days 1-3). We remove cabinets, countertops, flooring, appliances, and drywall down to studs. This is where we map the real condition of your 1960s-1980s Miami Lakes framing, electrical, and plumbing. If your home is one of the era’s typical CBS builds with original tie-beam construction, we often find undersized headers, ungrounded circuits, or galvanized supply lines that need addressing before anything new goes in. You’ll decide here whether to relocate walls or keep the existing layout.

Phase 2: Structural and MEP rough-in (week 1-2). Any wall removals get engineered headers. Electricians pull new 20-amp circuits for appliances and add GFCI protection throughout. Plumbers relocate or replace supply and drain lines. In Miami Lakes, any slab penetration for plumbing reroutes demands a structural engineer’s GPR scan first, post-tensioned cables from the original 1970s-1980s construction era run through many of these slabs, and severing one is a $10,000+ mistake. This phase takes longer here than in Broward County projects because Miami-Dade inspectors require NOA-compliant materials and methods at every rough-in checkpoint.

Phase 3: Drywall, prep, and flooring (week 2-3). New drywall goes up, joints are taped and finished, and your flooring substrate gets leveled. If you’re extending tile into adjacent living areas, we address the height transitions now. You’ll finalize paint colors and backsplash tile selection during this window, lead times on specialty orders run 2-4 weeks in South Florida, so late decisions push the finish schedule.

Phase 4: Cabinet and countertop installation (week 3-5). Cabinets go in first, leveled and secured to studs. We template countertops only after cabinets are set, engineered quartz like Cambria, Silestone, or Caesarstone needs 7-10 days from template to fabrication. You’ll do a walkthrough with us before templating to confirm overhangs, edge profiles, and sink cutout placement. This is the phase where “full” versus “partial” remodeling really shows, everything is built to spec, not scribed around old irregularities.

Phase 5: Finish trades and final inspection (week 5-6+, or longer for complex layouts). Backsplash tile, plumbing fixtures, lighting, appliances, and hardware. Miami-Dade requires a final inspection for any kitchen with relocated plumbing or electrical, and we schedule only when every item is complete and operable. You’ll do a punch walk with Raymond Estevez or our project lead, we don’t hand off to a separate warranty department.

The Material and Configuration Choices You’ll Face

Full kitchen remodeling in Miami Lakes forces honest trade-offs. Here’s what actually moves the needle on how your kitchen performs and what you pay:

  • Cabinet construction: Stock boxes with particleboard shelves run $4,000-$7,000 installed. Semi-custom with plywood boxes, soft-close hardware, and finished interiors from KraftMaid or Wellborn hit $8,000-$13,000. Full custom millwork exceeds that but is rarely necessary unless you’re matching historic trim in a specific Graham Companies phase build.
  • Countertop material: Laminate survives at $2,000-$3,500 but scratches and delaminates in South Florida humidity. Engineered quartz at $3,500-$6,500 resists staining and needs no sealing. Natural stone like granite runs similar to mid-quartz but demands annual sealing, a maintenance burden many Miami Lakes homeowners skip until it’s too late.
  • Appliance tier: Builder-grade packages at $3,000-$5,000 last 8-12 years. Professional-grade columns or integrated panels at $10,000-$20,000+ require precise cabinet specs ordered months ahead. We coordinate appliance specs before cabinet order, never after.
  • Layout changes: Keeping plumbing and gas in place saves $2,000-$5,000. Moving a sink to an island or relocating a cooktop to an exterior wall means new supply lines, venting, and often structural headers, figure $3,000-$8,000 per major relocation.
  • Lighting and electrical: Code now requires abundant receptacles and dedicated circuits. Adding under-cabinet LED, pendant drops, or a statement fixture over an island is straightforward during full remodeling but expensive to retrofit later. Budget $800-$2,500 for lighting upgrades beyond baseline.

What Full Kitchen Remodeling Costs in Miami Lakes, FL

Project Scope Price Range
Full kitchen remodeling (typical Miami Lakes home, 150-250 sq ft) $14,000-$45,000
Small kitchen remodel (compact footprint, minimal layout change) $9,000-$20,000
Cabinet installation (full replacement) $4,000-$13,000
Countertop installation $2,000-$6,500
Kitchen island installation (new or expanded) $3,000-$10,000
Backsplash installation $800-$2,500

Five factors push your job to the low or high end of that $14,000-$45,000 range. First, kitchen size: a 120-square-foot galley in a 1970s Miami Lakes ranch versus a 300-square-foot open kitchen in a later phase build are different animals entirely. Second, existing condition: original 1960s electrical and galvanized plumbing demands full replacement, adding $3,000-$7,000 before cosmetic work begins. Third, structural changes: removing walls for open-concept flow requires engineered beams and often tie-beam reinforcement in these aging CBS structures. Fourth, material grade: the jump from stock cabinets and laminate counters to semi-custom and quartz is roughly $8,000-$12,000 on a typical kitchen. Fifth, permit and inspection scope: Miami-Dade’s HVHZ compliance adds material costs and inspection scheduling time that Broward contractors don’t always account for.

A written estimate from us includes demolition, disposal, all rough and finish carpentry, electrical and plumbing to code, cabinets, countertops, backsplash, flooring, paint, and final cleanup. It does not include appliances, decorative lighting fixtures you purchase separately, or permit fees paid directly to Miami-Dade County.

Why Miami Lakes Homes Make This Job Different

The master-planned community that Graham Companies built here in the late 1960s through the 1980s created a remarkably uniform housing stock, and that uniformity creates predictable complications for full kitchen remodeling. Your home is almost certainly concrete block stucco construction with a flat or low-slope roof, original tie-beam framing, and possibly a post-tensioned slab if it’s from the 1970s or early 1980s commercial-residential crossover era near Main Street or the east side of town.

We’ve worked on homes throughout the original phases near Miami Lakes Drive and the later sections closer to Country Club of Miami. The pattern is consistent: original kitchens with 30-inch door openings, inadequate header support above pass-throughs, and electrical panels that can’t handle modern appliance loads without service upgrades. Before we hang a single cabinet, we often need to reinforce tie-beams, re-nail roof decking for HVHZ compliance, and upgrade opening protection, work that doesn’t show in the finished kitchen but is non-negotiable for passing Miami-Dade inspection.

The water table sits 1-2 feet below grade across much of Miami Lakes, those man-made lakes aren’t just scenery. Any plumbing reroute that requires slab cutting means dewatering, engineered shoring, and GPR scanning for post-tensioned cables. Contractors who treat this like inland Dade County work learn expensive lessons. We’ve also found that homeowners in the town’s older sections near Royal Oaks or Lake Suzanne often face HOA architectural review requirements that add 2-3 weeks to project start dates, something we build into schedules from day one.

This is why a Kitchen Remodeling in Miami Lakes project, especially a full gut renovation, demands a contractor who knows the specific inspection checkpoints and failure modes of this community’s concentrated building era. Our Kitchen Remodeling crew works exclusively with Miami-Dade NOA-approved materials, even when that means longer lead times than Broward-sourced alternatives. We cover Miami Lakes and surrounding communities including Hialeah, Hialeah Gardens, Country Club, and Palm Springs North.

Homeowners pursuing a whole-home renovation often pair this work with Full Bathroom Remodeling in Miami Lakes or Walk-In Showers & Shower Remodeling in Miami Lakes to maintain consistent finishes and avoid repeated mobilization costs.

Serving Miami Lakes, FL - Our Local Coverage Area

We’re based in the Miami Lakes area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

Frequently Asked - Full Kitchen Remodeling in Miami Lakes

Start Your Full Kitchen Remodel in Miami Lakes

Call (844) 665-0162 to schedule a free on-site estimate for full kitchen remodeling in Miami Lakes. Raymond Estevez or a senior project lead will walk your space, identify the specific conditions your home’s construction era creates, and deliver a written scope and price breakdown within 48 hours. No pressure, no deposit required to receive the estimate.

Written by Raymond Estevez, Owner at Groundwork Construction Co., serving Miami Lakes and South Florida.

Why Miami Lakes Chooses Groundwork Construction Co. of South Florida

We set the standard for full kitchen remodeling in Miami Lakes.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Miami Lakes

Getting your full kitchen remodeling handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your full kitchen remodeling needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Miami Lakes - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local full kitchen remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Miami Lakes Customers Say

Trusted by homeowners across Miami Lakes and surrounding areas.

★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo · Verified customer
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan · Verified customer
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett · Verified customer

Ready for Full Kitchen Remodeling in Miami Lakes?

Call now for a free estimate - or request one below. Licensed, insured, and here with fast after-hours help in Miami Lakes.

(844) 665-0162

Request a Free Estimate in Miami Lakes

Tell us about your full kitchen remodeling needs - we'll respond within the hour.

When you send us your details, you agree to our Privacy Policy and authorize us to contact you through phone, text, or email concerning your request, including by the partner businesses that may perform the service.

Prefer to text? Send a Text
Areas We Serve
Call Now - 24/7 Dispatch