Full Bathroom Remodeling in Palm Beach Gardens: Scope, Timeline, and Cost
Full bathroom remodeling in Palm Beach Gardens strips a bathroom to the studs and rebuilds it with new plumbing, electrical, waterproofing, fixtures, and finishes, typically spanning 3 to 5 weeks from permit approval to final inspection. Most projects we handle in ZIP codes 33410 and 33418 fall between $9,000 and $28,000 depending on whether you’re updating a 1970s guest bath in PGA National or reconfiguring a 2000s-era master suite in Mirasol. Call (844) 665-0162 and we’ll walk your specific space and give you a written estimate with line-item pricing.
The difference between a partial refresh and a full remodel is structural access. When we gut a bathroom, we can relocate drains, upgrade electrical to 20-amp GFCI circuits, sister damaged framing, and install proper cement-board or foam-tile backer systems instead of gluing over old drywall. For homes in Palm Beach Gardens built during the 1970s through 1990s CBS construction wave, this matters more than it would in newer stock. Those original bathrooms often have galvanized supply lines, ungrounded outlets, and substrate damage from decades of Florida humidity cycling through single-pane windows.
How Our Full Bathroom Remodeling Process Works
We’ve refined our Bathroom Remodeling sequence across hundreds of South Florida bathrooms. Here’s what actually happens, and when you need to make decisions.
Stage 1: Site measure and pre-construction documentation (3-5 days)
We photograph existing conditions, verify slab elevation for drain slope if you’re relocating fixtures, and test water pressure. You’ll decide your layout preference now: keep fixtures in place to save $2,000-$4,500 in plumbing rerouting, or move the toilet, shower, or vanity to improve flow. We also flag any HOA Architectural Review Board requirements at this stage, which in BallenIsles or PGA National can add 2-4 weeks to your calendar before we ever pull a city permit.
Stage 2: Permits and material lock (1-3 weeks)
We submit to Palm Beach Gardens Building Division for plumbing, electrical, and general construction permits. Simultaneously, you finalize selections: vanity cabinet line, countertop material, tile size and pattern, shower valve and trim, toilet rough-in specs, and exhaust fan CFM rating. This is when Kohler or Moen fixture finishes get locked. Change orders after this point cost you time and money, so we run a second confirmation meeting before ordering.
Stage 3: Demolition and rough-in (5-8 days)
We remove everything to the studs, haul debris, and expose framing for inspection. Our plumber replaces old supply lines with PEX or copper and sets new drain positions. Electrician runs dedicated 20-amp circuits, exhaust fan wiring, and any lighting plan changes. A city inspector visits for rough-in approval before we close walls. In older Palm Beach Gardens homes, we often find termite damage or corroded cast-iron drains here; we photograph everything and quote repairs before proceeding.
Stage 4: Waterproofing, tile, and fixture set (7-12 days)
Cement board or foam backer goes up with full waterproof membrane in wet areas. Floor tile installs first, then wall tile, then grout. We set the vanity, connect plumbing fixtures, and install the toilet. Paint follows. This is where material quality shows: a Silestone or Caesarstone vanity top tolerates Florida’s humidity better than laminate, and large-format tile with minimal grout joints resists mold growth in shower enclosures.
Stage 5: Final inspection and punch list (2-3 days)
City inspector verifies code compliance, we test all fixtures under pressure, and you walk the space with our project lead. We document warranty registration for fixtures and leave you with care instructions for your specific materials.
The Material and Configuration Choices You’ll Face
Full bathroom remodeling forces decisions that partial updates let you postpone. Here’s where your money goes and what each choice actually means for daily use.
- Vanity cabinet: Stock box cabinets run $400-$900; semi-custom lines with soft-close drawers and plywood boxes run $1,200-$3,500. For Palm Beach Gardens homes with tight bathroom dimensions, we often recommend 21-inch depth instead of standard 24-inch to improve walkway clearance without sacrificing counter space.
- Countertop surface: Cultured marble is cheapest at $200-$600 installed but scratches and stains. Engineered quartz from Silestone or Caesarstone runs $1,200-$3,000 for a typical single vanity, resists etching, and carries 15-year residential warranties. Natural stone like marble demands sealing every 6-12 months in Florida’s humidity.
- Shower enclosure: Prefab fiberglass surrounds install in a day for $800-$1,500 but look institutional and crack over time. Custom tile with proper waterproofing runs $2,500-$7,500 and lasts decades if maintained. Frameless glass adds $1,200-$2,800 and demands precise tile layout planning.
- Tile format and pattern: 12×24 porcelain on floors with 1/8-inch grout joints is our standard recommendation for durability and cleaning ease. Mosaics on shower floors improve slip resistance but multiply grout maintenance. Herringbone or vertical stack patterns add labor cost (15-25%) but transform visual scale in smaller Palm Beach Gardens bathrooms.
- Fixture grade: Builder-grade chrome faucets from big-box stores cost $80-$150 and carry 5-year warranties. Moen or Kohler mid-tier lines in brushed nickel or matte black run $250-$600, use ceramic disc cartridges, and warranty finishes against corrosion. For coastal Palm Beach Gardens, we steer clients away from oil-rubbed bronze, which shows salt-air degradation within 3-4 years.
- Exhaust and ventilation: Code minimum is 50 CFM, but we spec 80-110 CFM for bathrooms over 100 square feet or those without windows. Humidity-sensing switches add $85-$150 and automatically extend runtime, which protects your investment in premium finishes.
What Full Bathroom Remodeling Costs in Palm Beach Gardens, FL
| Project Element | Typical Range |
|---|---|
| Full bathroom remodeling, Palm Beach Gardens | $9,000 - $28,000 |
| Keep existing layout, mid-grade materials | $9,000 - $15,000 |
| Relocate plumbing, premium finishes | $18,000 - $28,000 |
| Structural repair (termite, rot, slab) | $1,500 - $6,000+ |
Five variables push your number up or down:
Square footage and fixture count. A 5×8 hall bath with tub-shower combo, single vanity, and toilet runs toward the lower end. A master suite with dual vanities, freestanding tub, separate shower, and water closet pushes $22,000-$28,000 before you select a single finish.
Plumbing relocation. Moving a toilet drain across a slab requires cutting concrete, rerouting 3-inch waste line, and re-pouring with proper slope. Each relocated fixture adds $800-$2,500. Keeping your “wet wall” intact saves substantial money.
Material grade and brand tier. A Moen Align collection faucet costs 3x a builder-basic Chateau. Silestone quartz runs 40% above laminate. These are real choices, not upsells; we quote multiple tiers so you control the number.
Existing condition surprises. Homes in original PGA National or older 33410 neighborhoods often conceal galvanized drains, ungrounded wiring, or moisture-damaged framing behind seemingly sound tile. We build $1,500-$3,000 contingency into every estimate for this reason.
Permit scope and HOA processing. City permits for full bathroom remodeling in Palm Beach Gardens run $400-$900 depending on valuation. HOA Architectural Review Board submission in gated communities adds 2-4 weeks and sometimes requires specific material pre-approval, which can restrict your options or require resubmission fees.
Our written estimates include demolition, disposal, permits, rough and finish plumbing, electrical, waterproofing, tile installation, fixture setting, paint, and final cleaning. They do not include your decorative mirrors, towel bars, or window treatments, which many homeowners prefer to select independently.
What Palm Beach Gardens Homes Specifically Do to This Job
The construction reality here is split, and your bathroom project lands differently depending on which side you’re on.
In the eastern 33410 corridor, the 1970s-1990s CBS homes of PGA National and surrounding golf communities present predictable patterns. Original bathrooms have 30-inch vanities with cultured marble tops, fiberglass tub-shower combos with failing surrounds, and aluminum-frame windows that leak conditioned air. The concrete block construction means we can’t easily run new plumbing through walls; we often surface-mount or chase channels, which adds labor. These homes also frequently need electrical service upgrades from 100-amp to 200-amp panels if you’re adding heated floors or tankless water heaters as part of your remodel.
West in 33418, Mirasol and newer luxury builds from the 2000s-2010s have better bones but different challenges. Larger master suites with his-and-hers vanities, freestanding tubs, and walk-in showers demand more complex waterproofing and sometimes structural reinforcement for stone or quartz tops exceeding 200 pounds. The shallow water table managed by South Florida Water Management District canals doesn’t directly affect second-story bathrooms, but any ground-floor work near exterior walls requires awareness of slab moisture conditions.
The HOA factor is unavoidable in Palm Beach Gardens. Communities like BallenIsles and Mirasol maintain independent Architectural Review Boards with enforcement authority that exceeds city code. We’ve seen out-of-area contractors pull valid city permits, complete beautiful work, and face mandatory tear-out orders because they skipped ARB pre-approval. Our process includes ARB submission before permit application, with material samples and finish schedules that match each community’s specific design guidelines. This adds time upfront and prevents catastrophe later.
Florida Building Code wind-load requirements also affect bathroom windows and any exterior-facing exhaust penetrations. Impact-rated options from our window and door partners may be required or advisable depending on your home’s exposure and insurance carrier demands.
Homeowners undertaking full bathroom remodeling in Palm Beach Gardens often coordinate with our broader exterior work. If you’re already replacing windows for code compliance or updating a roof after storm damage, bundling interior and exterior projects through one contractor eliminates scheduling conflicts and material-mismatch risks. Many clients pair their bathroom project with Roof Repair in Palm Beach Gardens or schedule Roof Replacement & Installation in Palm Beach Gardens to align permitting and minimize disruption.
Serving Palm Beach Gardens, FL - Our Local Coverage Area
We’re based in the Palm Beach Gardens area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
Frequently Asked - Full Bathroom Remodeling in Palm Beach Gardens
Most full bathroom remodeling projects in Palm Beach Gardens take 3 to 5 weeks of active construction, plus 2 to 4 weeks for HOA Architectural Review Board approval if you’re in a deed-restricted community like PGA National or BallenIsles, and 1 to 2 weeks for city permit issuance. Call (844) 665-0162 and we’ll map your specific timeline after seeing your space and confirming your HOA requirements.
Yes, city permits are required for plumbing, electrical, and structural work in any full bathroom remodeling project in Palm Beach Gardens, and permits must be pulled after HOA Architectural Review Board approval in gated communities. We handle all submissions, but the sequential approval process means your project timeline extends beyond what an ungated property would require.
Absolutely, and keeping your existing “wet wall” and fixture locations typically saves $2,000-$4,500 in plumbing rerouting and slab work, landing your project in the $9,000-$15,000 range instead of $18,000+. We still gut to studs, upgrade electrical, and install new waterproofing and finishes, so the result is functionally new even without relocation.
Projects reaching $22,000-$28,000 typically involve master suites over 120 square feet, dual vanities with Silestone or Caesarstone tops, freestanding tubs, separate curbless showers with linear drains, plumbing relocation, and premium Moen or Kohler fixture collections. Call (844) 665-0162 for an exact quote; estimates are free and itemized by category.
Our workmanship warranty covers installation quality for one year, while manufacturer warranties protect your fixtures and materials, Kohler and Moen faucets carry lifetime limited warranties on finish and function, and Silestone and Caesarstone countertops include 15-year residential coverage. We register all warranties and provide documentation at project closeout.
Get Your Free Estimate for Full Bathroom Remodeling in Palm Beach Gardens
We’ll walk your space, confirm your HOA requirements if applicable, and deliver a written estimate with line-item pricing for your full bathroom remodeling project in Palm Beach Gardens. No deposit required to schedule. Call (844) 665-0162 or request a callback through our site. Raymond Estevez or a senior project lead will handle your consultation personally.
Written by Raymond Estevez, Owner at Groundwork Construction Co., serving Palm Beach Gardens and South Florida.