How Much Does Full Bathroom Remodeling Cost in The Crossings, and How Long Does It Take?
Full bathroom remodeling in The Crossings typically runs $9,000-$28,000 for a complete gut-and-rebuild, with most projects taking 3 to 5 weeks from permit approval to final inspection. A same-size refresh using existing plumbing locations lands near the lower end; expanding into a closet, relocating a toilet or shower drain, or upgrading from pre-HVHZ assemblies pushes costs higher. Call (844) 665-0162 and we’ll walk your specific space, usually same week.
We’re Groundwork Construction Co., and we handle Bathroom Remodeling in The Crossings as part of our full-scope residential work across Miami-Dade. Our crew has stripped and rebuilt bathrooms in the original 1980s CBS homes off SW 120th Street and in the later phases near SW 137th Avenue enough times to know where the surprises hide.
The Real Process: What Happens Week by Week
A full bathroom remodel isn’t a single event. It’s five distinct phases, and knowing the sequence helps you time your decisions.
Week 1: Demo and discovery. We remove everything down to studs and slab, then assess what’s actually behind the walls. In The Crossings, this is where we find the unexpected: original galvanized supply lines in homes built before 1985, cast-iron drains with belly sag, or electrical fed through ungrounded Romex. We document it all, photograph the conditions, and present options before any rebuild starts. This phase takes 2-3 days.
Week 1-2: Rough-in and inspection. Plumbing gets relocated if you’ve chosen to move the toilet, shower, or vanity location. Electrical is rewired for GFCI circuits, exhaust fans, and any added lighting. Miami-Dade requires a rough plumbing inspection and a rough electrical inspection before we close walls. Scheduling inspectors adds 2-4 business days depending on their backlog. You’ll need to have chosen your vanity width, toilet rough-in distance, and shower valve type by this point, or we can’t set the plumbing correctly.
Week 2-3: Wall and floor prep. Cement board or equivalent wet-area substrate goes up. Floors get leveled, which in The Crossings often means grinding down high spots in the slab where decades of tile layers have stacked up. If you’re doing a curbless shower, we slope the slab now. This phase takes 3-4 days.
Week 3-4: Tile, fixtures, and finishes. Tile setters work floor to ceiling, then grout. The vanity gets installed, plumbing fixtures connected, toilet set, and electrical trim completed. Paint follows. This is the visible progress week, and it takes 5-7 days depending on tile complexity and drying times.
Week 4-5: Final inspection and punch list. Miami-Dade does a final plumbing and building inspection. We run every fixture, check for leaks, test exhaust fan CFM, and walk the space with you. Typical punch list items: caulk touch-ups, a grout haze spot, adjusting a door swing. Then we’re out.
Our Bathroom Remodeling crew coordinates every trade internally. You don’t hire a separate plumber, electrician, and tile setter. One contractor, every phase.
The Material Decisions That Shape Your Bathroom
Full bathroom remodeling in The Crossings means choosing between real options with real trade-offs. Here’s what we see homeowners weighing most often:
- Porcelain tile vs. ceramic vs. natural stone: Porcelain absorbs less than 0.5% water, making it nearly impervious in shower floors and steam-prone spaces. Ceramic costs 20-30% less but is more porous. Natural stone (marble, travertine) looks unmistakable but demands sealing every 12-18 months in South Florida’s humidity. For The Crossings homes with original exhaust fans that move 50 CFM or less, we’d steer you toward porcelain.
- Acrylic shower surround vs. tiled wet room: Acrylic installs in a day, costs less, and has no grout to maintain. A fully tiled shower with a linear drain and frameless glass runs 3-4x the price but adds square footage visually and lets you pitch the floor to a single drain. If you’re aging-in-place or resale-minded, the wet room wins.
- Standard vanity vs. floating vs. custom built-in: A 36-inch KraftMaid or Wellborn stock vanity with quartz top lands around $1,200-$2,500 installed. Floating vanities need wall blocking and conceal less plumbing but read as more spacious in The Crossings’ typically modest 5×8 original bathrooms. Custom built-ins maximize odd corners, common in the community’s split-bedroom floor plans.
- Quartz countertop vs. solid surface: Cambria, Silestone, or Caesarstone quartz resists staining and needs no sealing, which matters when hard water from Miami-Dade’s aquifer leaves mineral deposits. Solid surface (Corian-type) repairs more easily if scratched but lacks the depth of pattern. Both outperform laminate in resale value.
- Standard toilet vs. comfort height vs. wall-hung: Comfort height (17-19 inches) suits aging homeowners and is now code-adjacent for accessibility. Wall-hung toilets hide the tank in the wall, saving 9 inches of depth, but require steel carrier framing and a thicker wall assembly. In The Crossings’ CBS construction, that means cutting into block and adding furring, not just swapping a flange.
You choose the brand and grade. We handle the build. Built to spec, not to convenience.
What Full Bathroom Remodeling Costs in The Crossings, FL
| Project Scope | Price Range |
|---|---|
| Full bathroom remodel, existing layout, mid-grade materials | $9,000-$15,000 |
| Full bathroom remodel, relocated plumbing, upgraded finishes | $15,000-$22,000 |
| Full bathroom remodel with expansion, structural modification, or luxury materials | $22,000-$28,000 |
Five variables move you up or down this range. Square footage is obvious: a 40-square-foot hall bath vs. a 120-square-foot master with separate water closet. Plumbing relocation adds $800-$2,500 per fixture move in slab-on-grade homes because we cut concrete, not just reroute joist bays. Existing condition: galvanized supply replacement, cast-iron drain replacement, or electrical service upgrades are discovery items, not optional upgrades. Material grade: a $3/sf ceramic vs. a $14/sf large-format porcelain, or a $400 vanity vs. a $2,800 floating custom unit. Permit scope: Miami-Dade’s HVHZ requirements trigger additional product approvals and inspection sequences that simpler jurisdictions skip.
A written estimate from Groundwork itemizes labor, materials, permits, and a contingency line for concealed conditions. It does not include your decorative mirrors, towel bars, or paint color samples. Those are yours to select, though we’ll spec the sheen and type.
Why The Crossings Changes What We Bid
The Crossings sits in ZIP 33186, a 1980s planned community built before Hurricane Andrew rewrote Miami-Dade’s building code. Most homes here are CBS construction, single-story or two-story, with original flat or low-slope roofs and jalousie windows that predate the High-Velocity Hurricane Zone’s impact-resistance mandates. That history matters for your bathroom remodel in specific ways.
First, the slab. The Crossings is built on the Miami Rock Ridge, and crews regularly hit oolitic limestone within inches of the surface. If your remodel involves moving a toilet drain or adding a tub, we may need to jackhammer rather than trench. We price this possibility into every bid for The Crossings, not as a surprise change order.
Second, the water table. Southwestern Miami-Dale’s wet season runs June through October, and standing water sits 18-24 inches below grade in many areas. Any below-slab work gets scheduled for drier months when possible, and we spec moisture barriers and drain matting more aggressively than in higher-ground communities like The Crossings‘ neighbors to the east.
Third, permits. Miami-Dade’s NOA product-approval requirements are the strictest wind-load standards in the continental U.S. Windows and exterior doors replaced during a remodel need HVHZ-rated products, but interior bathroom windows, if they exist, and exhaust vent terminations must also meet specific penetration-sealing details. We handle the NOA submittals; most homeowners don’t know to ask.
Fourth, the housing stock itself. Original bathrooms in The Crossings are typically 5×8 feet with a tub-shower combo, a single vanity, and a toilet squeezed against the wall. Expanding into an adjacent closet or bedroom corner, common in our full remodels here, means understanding the original load paths and whether that wall is shear-rated. We’ve done enough of these to know which phase-built sections have truss roofs that free up interior walls and which don’t.
Homeowners in The Crossings often pair major interior work with exterior envelope upgrades. If your roof is original or your windows are still jalousie, you may want to explore Roof Repair in The Crossings or Roof Replacement & Installation in The Crossings as part of a coordinated project. From driveway to roofline, we can sequence it under one contract.
Serving The Crossings, FL - Our Local Coverage Area
We’re based in the The Crossings area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
Frequently Asked - Full Bathroom Remodeling in The Crossings
Most full bathroom remodeling projects in The Crossings take 3 to 5 weeks from permit approval to final inspection. The variable is usually Miami-Dade’s inspection scheduling, not our crew speed. Call (844) 665-0162 and we’ll check current permit turnaround times.
Yes. Miami-Dade requires permits for plumbing, electrical, and structural work in all bathroom remodels, and The Crossings falls under the county’s direct jurisdiction. We pull permits as part of our standard process and coordinate all inspections. The permit cost is itemized in your estimate.
Yes, and it’s the most common way to control costs. Keeping the toilet, vanity, and shower in their original locations avoids concrete cutting in The Crossings’ slab-on-grade construction. We call this a “wet-side refresh” and it typically saves $2,000-$5,000 versus relocating fixtures.
$9,000 is the practical floor for a true full remodel in The Crossings using mid-grade materials and existing plumbing locations. Below that, you’re looking at partial updates, not a gut-and-rebuild. Call (844) 665-0162 for an exact quote - estimates are free.
Groundwork warranties our workmanship for one year on all full bathroom remodeling projects. Manufacturer warranties on fixtures, tile, and cabinetry run longer and transfer to you directly. We register all product warranties and leave you with the documentation.
Get Your Free On-Site Estimate for Full Bathroom Remodeling in The Crossings
We’ll walk your space, check existing conditions, and deliver a written estimate with itemized pricing. No deposit to schedule the visit. Call (844) 665-0162 or request a time online. Raymond Estevez and our team serve The Crossings and surrounding Miami-Dade communities with full-scope residential construction - one contractor, every phase.
Written by Raymond Estevez, Owner at Groundwork Construction Co., serving The Crossings since our South Florida founding.