Full Bathroom Remodeling in West Hollywood, FL: Scope, Timeline, and What to Budget
Full bathroom remodeling in West Hollywood strips a bathroom to the studs and rebuilds it with new layout, fixtures, finishes, and systems. Most projects we run in the 33021 area take 3 to 5 weeks from permit approval to final inspection, depending on whether plumbing moves and how Broward County schedules inspections. For a complete gut renovation, homeowners in this market typically invest between $9,000 and $28,000. Call (844) 665-0162 to walk through your space and get a written estimate with line-item pricing.
How Our Full Bathroom Remodeling Crew Works Through a West Hollywood Job
We’ve refined this into five clear stages after years of working the CBS homes that fill West Hollywood’s neighborhoods. Each stage has a decision point where your choices directly affect the next phase.
Stage 1: Demo and discovery (2-3 days). We remove everything down to the concrete block walls. In West Hollywood’s 1950s and 1960s stock, this is where we find the surprises: terrazzo floors that crack when disturbed, galvanized supply lines still in service, or electrical panels too small to support modern GFCI requirements. You’ll decide here whether to preserve original terrazzo or cover it, and whether the existing panel can handle heated floors or a tankless water heater.
Stage 2: Rough-in and structural (3-5 days). Plumbing gets repositioned if you’re moving the toilet, shower, or vanity location. Electrical runs for dedicated circuits, exhaust fans, and lighting zones. If we’re cutting into CBS walls for recessed medicine cabinets or widening doorways, we install hurricane-rated blocking per Broward County’s High-Velocity Hurricane Zone requirements. You’ll confirm fixture locations and select your exhaust fan CFM rating based on bathroom volume.
Stage 3: Wall and floor prep (2-4 days). Concrete block gets floated smooth for tile or boarded for moisture-resistant drywall. Floors are leveled; sloped shower pans are poured or waterproof membrane systems installed. You’ll choose between traditional mud-set pan construction and newer bonded waterproofing systems like Schluter-Kerdi. The mud-set costs less upfront but adds a day; bonded systems cost more but eliminate the 28-day cure wait.
Stage 4: Finish installation (5-10 days). Tile setters work wall to floor, then plumbers set rough valves and finish fixtures, then electricians install lighting, fans, and switches. Cabinetry and countertops follow. You’ll have already selected grout colors, fixture finishes, and hardware by this point. Any change here costs days, not hours.
Stage 5: Inspection and punch (1-2 days). Broward County inspects plumbing, electrical, and final build. Because West Hollywood is unincorporated, we coordinate directly with the County Building Division office near Fort Lauderdale, not a city hall. Their inspection windows differ from Hollywood’s municipal schedule, and we build that into our timeline. You’ll walk the finished space with our project lead and sign off on the punch list.
The Material and Configuration Choices That Shape Your Bathroom
Full bathroom remodeling in West Hollywood means deciding between real options with real trade-offs. Here’s what we most often discuss with homeowners:
- Shower waterproofing: Traditional hot-mop or mud pan with vinyl liner runs $800-$1,500 less than bonded sheet membrane systems, but carries a 2%-3% failure rate over 10 years in our humid climate. We recommend bonded systems for second-story bathrooms or any job where a leak would damage finished space below.
- Vanity cabinetry: Stock semi-custom lines from KraftMaid or Wellborn run $1,200-$3,500 installed. Fully custom builds start around $4,500. The difference is drawer construction, soft-close hardware standard vs. upgrade, and finish durability. For West Hollywood’s humidity, we spec plywood box construction over particleboard regardless of tier.
- Countertops: Cultured marble costs least at $40-$70 per square foot installed, but scratches and stains. Engineered quartz from Silestone or Caesarstone runs $75-$140 installed and handles daily use without sealing. Natural stone like Carrara marble sits between in price but demands annual sealing in South Florida’s hard water.
- Fixtures and faucets: Builder-grade chrome from big-box brands costs $150-$400 per fixture. Kohler and Moen mid-tier lines in brushed nickel or matte black run $350-$800 and carry 10-year to lifetime finishes that resist our aggressive water chemistry. You’ll feel the difference in cartridge smoothness and drain closure quality.
- Tile selection: Ceramic wall tile at $3-$8 per square foot works for backsplashes and vertical surfaces. Porcelain at $5-$12 handles floor traffic and resists moisture absorption below 0.5%. Natural stone at $8-$20 demands more maintenance but delivers texture variation no factory process replicates.
What Full Bathroom Remodeling Costs in West Hollywood, FL
| Project Component | Typical Range |
|---|---|
| Full bathroom remodeling (complete gut) | $9,000 - $28,000 |
| Plumbing relocation (toilet/shower/vanity) | $1,500 - $4,500 |
| Electrical panel upgrade (if required) | $1,200 - $3,000 |
| Shower waterproofing system upgrade | $800 - $2,000 |
| Permit and inspection fees (Broward County) | $400 - $900 |
Five variables push any full bathroom remodeling project toward the low or high end of that $9,000-$28,000 range:
Bathroom size and fixture count. A 5×8 hall bath with one vanity, toilet, and tub-shower combo sits at the lower end. A master bath with double vanity, freestanding tub, separate shower, and water closet pushes toward $25,000-plus before luxury finishes.
Existing condition of systems. Original 1950s galvanized plumbing, ungrounded electrical, or concrete block that needs extensive floating adds $2,000-$6,000 in remediation before finish work begins.
Plumbing and structural relocation. Keeping fixtures in their existing locations saves $1,500-$4,500. Moving a toilet more than a few feet means cutting concrete slab, rerouting drain lines, and often adjusting vent stacks through the roof.
Material grade and brand selections. A full Kohler fixture package with Silestone counters and porcelain tile runs $4,000-$7,000 more in materials than builder-grade alternatives across a typical bathroom.
Permit scope and compliance triggers. Broward County’s hurricane-hardening reviews can require impact-rated window replacement if the bathroom has an exterior window, or structural connector upgrades if walls are opened. These aren’t optional add-ons; they’re code-mandated costs that out-of-area contractors sometimes miss in initial quotes.
Our written estimates itemize labor, materials, permit fees, and contingency. They do not include temporary bathroom arrangements, post-construction cleaning beyond basic debris removal, or decorative items like mirrors and towel bars you source yourself.
Why West Hollywood’s Homes and Rules Change How We Approach This Job
The 33021 ZIP is built almost entirely of concrete block homes from the 1950s and 1960s South Florida boom, many with original terrazzo floors, jalousie windows, and flat roofs. When we bid full bathroom remodeling in West Hollywood, we’re not just pricing finishes. We’re planning for what those decades-old systems demand.
Because West Hollywood sits in unincorporated Broward County, every permit routes through the County Building Division rather than a municipal department. Their inspection scheduling, fee structures, and jobsite notice board requirements differ from Hollywood’s city hall process just blocks east. Contractors unfamiliar with this workflow add days to projects through missed inspection windows or incorrect paperwork. We’ve learned their portal system and inspection routes, and we build realistic timelines around their actual availability, not idealized assumptions.
The housing stock itself drives specific challenges. Original electrical panels in these CBS homes are often 100-amp service with no room for bathroom-dedicated circuits. Concrete block walls require metal stud furring or extensive floating before tile or drywall can go up. And because Broward County enforces High-Velocity Hurricane Zone standards, any wall opening we create for recessed storage, plumbing access, or structural modification triggers compliance review for proper fastening and wind-load transfer.
We’ve also learned to anticipate the humidity damage. Bathrooms in these older homes often show corroded exhaust fan housings, rusted wall studs behind tubs, and failed caulk lines that let moisture into block cavities. We address it during demo rather than discovering it after finishes are ordered.
Homeowners in West Hollywood often pair extensive interior work with exterior system updates. If your project scope is expanding, you might also consider Roof Repair in West Hollywood or Roof Replacement & Installation in West Hollywood to address the flat or low-slope assemblies common in this area.
Serving West Hollywood, FL - Our Local Coverage Area
We’re based in the West Hollywood area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
Frequently Asked - Full Bathroom Remodeling in West Hollywood
Most projects run 3 to 5 weeks from permit approval to final sign-off. Broward County’s inspection schedule for unincorporated areas like West Hollywood typically adds 3 to 5 business days compared to incorporated cities, so we pad our timeline realistically. Call (844) 665-0162 and we’ll check current inspection availability for your project window.
Yes. Because West Hollywood is unincorporated Broward County, permits route through the County Building Division, not a city hall. Any gut renovation involving plumbing, electrical, or structural modification requires permits, and most 1950s-1960s homes trigger additional hurricane-hardening compliance review. We handle the application, plans, and inspection scheduling as part of our project management.
Absolutely, and it typically saves $1,500-$4,500 and shaves a week off the timeline. Keeping the toilet, vanity, and shower in their existing locations avoids concrete slab cutting and drain rerouting. We still gut to the studs, upgrade systems, and install new finishes. Many West Hollywood homeowners choose this path when the existing layout functions well but the materials and systems are worn out.
A straightforward 5×8 gut with fixtures in place, ceramic tile, stock vanity, and no system surprises runs near $9,000-$12,000. A master bath with relocated plumbing, double vanity, separate tub and shower, porcelain or natural stone, and electrical panel upgrades pushes toward $22,000-$28,000. The specific number depends on what we find during demo and what materials you select. We provide exact quotes after on-site evaluation, and estimates are free.
We warranty our workmanship for one year on installation and assembly. Manufacturer warranties cover the products themselves, Kohler and Moen fixtures carry 10-year to lifetime limited warranties, and Silestone and Caesarstone countertops include 25-year residential warranties. We register all manufacturer warranties in your name and provide documentation at project closeout.
Get Your Free Estimate for Full Bathroom Remodeling in West Hollywood
Call (844) 665-0162 to schedule a free on-site estimate. Raymond Estevez or a senior project lead will walk your bathroom, assess existing conditions, discuss layout and material options, and return a written line-item estimate within 48 hours. No deposit required to start the conversation. We serve West Hollywood and surrounding Broward County communities from our Fort Lauderdale base.
For homeowners considering a broader renovation scope, full bathroom remodeling is often part of a larger Bathroom Remodeling in West Hollywood project or integrated with whole-home updates through our Bathroom Remodeling division. One contractor handles every phase.
Written by Raymond Estevez, Owner at Groundwork Construction Co., serving West Hollywood and South Florida homeowners since our founding.