Full Kitchen Remodeling in Hobe Sound: What It Costs, How Long It Takes, and Where to Start
A full kitchen remodeling in Hobe Sound strips the room to studs and rebuilds it with new layout, cabinetry, countertops, flooring, lighting, and appliances. Most projects we run in the 33455 ZIP take 6 to 10 weeks from permit approval to final inspection, depending on whether we’re moving walls or plumbing. In Hobe Sound, full kitchen remodeling typically runs $14,000 to $45,000. Call (844) 665-0162 and we’ll walk your space with you, no charge.
How We Approach a Full Kitchen Remodeling Project in Hobe Sound
We’ve learned that homeowners stay sane when they know what’s happening next. Here’s the actual sequence we follow on a full kitchen remodeling job in Hobe Sound, with the decisions you’ll need to make at each point.
Stage 1: Site measure and scope lock (3-5 days)
We visit your home, photograph everything, and confirm what stays and what goes. You’ll decide whether we’re keeping the existing footprint or relocating the sink, range, or island. This is when we flag any Martin County permitting triggers, like electrical service upgrades or structural wall modifications. We also check for the hurricane strapping and tie-down gaps common in 1960s-1980s ranch stock on the mainland side of Hobe Sound. You get a fixed-scope proposal with line-item pricing before we move forward.
Stage 2: Design and material selection (2-4 weeks)
This is where the calendar stretches or compresses based on your decisiveness. You’ll choose cabinet line and finish, countertop material and edge profile, flooring type, backsplash tile, lighting package, and appliance specifications. We bring samples to your home so you can see how KraftMaid or Wellborn cabinetry reads against your actual wall color and natural light. For countertops, we quote Cambria, Silestone, and Caesarstone options across different price tiers so you’re choosing, not being steered. Appliance lead times vary; we coordinate delivery to hit the installation window.
Stage 3: Permits and pre-construction (2-4 weeks)
Martin County Building Department reviews full kitchen remodeling permits for electrical, plumbing, and structural work. If your home sits near the Hobe Sound National Wildlife Refuge boundary or the Loxahatchee River corridor, we verify that no environmental buffer or flood-zone elevation triggers apply. Older homes in Hobe Sound often need electrical panel upgrades to handle modern appliance loads, which adds a separate permit cycle. We handle all submittals and schedule inspections so you don’t chase the county.
Stage 4: Demolition and build-out (4-6 weeks)
We strip to studs, address any water damage or termite evidence (common in the older ranch stock off Bridge Road and Gomez Avenue), rough in plumbing and electrical, install drywall, lay flooring, hang cabinets, set countertops, and finish with backsplash, lighting, and trim. If we’re opening to an adjacent space or adding an island with a sink, the plumbing relocation happens here. We run a mid-point walkthrough so you see the bones before finishes go in.
Stage 5: Final inspection and closeout (3-5 days)
Martin County inspects electrical, plumbing, and final build compliance. We do our own punch list walk with you, then turn over care guides for your specific materials and appliance warranties. Our Kitchen Remodeling crew stays available for any adjustment in the first 30 days.
The Material and Layout Decisions That Shape Your Kitchen
Full kitchen remodeling means choosing every surface and system. These are the trade-offs we walk homeowners through most often in Hobe Sound:
- Stock vs. semi-custom vs. custom cabinets: Stock cabinets (KraftMaid’s standard lines) run lower cost and deliver faster, but you’re locked into standard sizes. Semi-custom gives you width and height flexibility with a 6-8 week lead time. Full custom costs significantly more and stretches the calendar, but fits odd spaces or specific aesthetic targets. Most Hobe Sound projects we do land in semi-custom.
- Quartz vs. granite vs. solid surface countertops: Engineered quartz (Cambria, Silestone, Caesarstone) resists staining and needs no sealing, which matters in kitchens that see heavy use. Granite offers natural variation but requires annual maintenance. Solid surface like Corian scratches more easily but allows integrated sinks. For coastal Hobe Sound homes with rental or seasonal use, quartz wins on durability.
- Hardwood vs. tile vs. luxury vinyl plank flooring: Real hardwood warps in Florida humidity unless the home’s HVAC runs consistently. Porcelain tile handles moisture and salt air near the water but feels hard underfoot. LVP gives a wood look with better moisture tolerance and easier installation, though it won’t outlast tile in a 20-year horizon.
- Recessed, pendant, or under-cabinet lighting mix: We design to task zones, not just general illumination. Under-cabinet LED strips eliminate shadow on prep surfaces. Pendant spacing over islands is measured to your ceiling height and island length.
- Appliance fuel and ventilation: Switching from electric to gas requires a licensed plumber and Martin County gas inspection. Ventilation hoods need ducting to exterior, which may mean roof or wall penetration depending on your kitchen’s location in the house.
Our Kitchen Remodeling in Hobe Sound page covers how these choices fit into broader project planning if you’re also considering adjacent spaces.
What Full Kitchen Remodeling Costs in Hobe Sound, FL
| Component | Typical Range |
|---|---|
| Full kitchen remodeling (total project) | $14,000 - $45,000 |
| Cabinetry and installation | $4,000 - $13,000 |
| Countertops (fabricated and installed) | $2,000 - $6,500 |
| Backsplash | $800 - $2,500 |
| Kitchen island (if adding or expanding) | $3,000 - $10,000 |
Five factors push any Hobe Sound project toward the low or high end of that $14,000-$45,000 range:
- Kitchen size: A compact galley in a 1960s ranch runs toward the lower end. A sprawling kitchen in a newer custom build off Jupiter Island with multiple islands and appliance walls pushes toward the top.
- Structural and plumbing relocation: Keeping your sink, range, and dishwasher in existing locations saves thousands. Moving any of them means new supply lines, drains, venting, and often floor repair.
- Electrical service condition: Homes built before 1980 in Hobe Sound frequently need panel upgrades or additional circuits to handle modern appliance loads, especially if you’re adding a double oven or induction cooktop.
- Material grade: Entry-level stock cabinets and laminate counters keep costs down. Premium semi-custom cabinetry, quartz or stone countertops, and professional-grade appliances multiply the budget quickly.
- Permit scope and inspection cycles: Martin County’s thorough review process adds time but not necessarily cost, unless environmental or flood-zone triggers require engineered drawings or additional approvals.
A written estimate from Groundwork Construction Co. includes demolition, disposal, all materials, labor, permits, and inspections. It does not include appliances (you purchase separately or we source at your direction), temporary kitchen setup, or repairs to unexpected damage found after demolition begins. We flag likely unknowns based on your home’s age and condition during the initial walkthrough.
What Hobe Sound Homes Specifically Do to a Kitchen Remodel
Hobe Sound’s split personality, mainland ranch versus barrier island luxury, creates two distinct remodeling realities we plan for from the first phone call.
The mainland side, ZIP 33455, holds thousands of mid-century Florida ranches built between the 1960s and 1980s. These kitchens are typically small by current standards, with inadequate electrical service, no ground-fault protection, and original aluminum or cloth-wrapped wiring we’ve encountered off Bridge Road and Gomez Avenue. When we pull a permit for full kitchen remodeling in one of these homes, Martin County almost always requires us to bring the entire electrical service up to current code, not just the kitchen circuit. That adds cost but also eliminates fire hazards.
The barrier island corridor toward Jupiter Island brings a different challenge: wind-load and impact-rated requirements. Homes here, even interior remodels, often need documentation that envelope penetrations (like new windows or exterior venting for range hoods) meet Miami-Dade or Florida Product Approval standards. Salt-air corrosion within a mile of the Atlantic also means we spec stainless or coated fasteners and hardware that inland contractors might skip.
Then there’s the Martin County regulatory layer that contractors from Broward or Palm Beach routinely underestimate. The county’s Development Review Committee enforces environmental buffers tied to gopher tortoise habitat and the Hobe Sound National Wildlife Refuge. While a kitchen remodel inside an existing footprint rarely triggers these rules, any ground-disturbing work, like adding square footage or modifying foundations for an expanded kitchen, can require biological surveys and setback verification. We’ve seen out-of-county contractors hit stop-work orders on jobs that seemed straightforward. We check this before we price, not after we start.
FEMA flood zones, mostly AE and VE across Hobe Sound’s coastal areas, mean elevation and flood-vent compliance for any work below base flood elevation. If your kitchen sits on a slab near the Intracoastal Waterway or Loxahatchee River, we verify that our work doesn’t compromise your home’s flood rating.
Serving Hobe Sound, FL - Our Local Coverage Area
We’re based in the Hobe Sound area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
Frequently Asked - Full Kitchen Remodeling in Hobe Sound
Most full kitchen remodeling projects in Hobe Sound take 6 to 10 weeks from permit approval to final inspection, with 2 to 4 weeks added upfront for design and material selection. Homes needing electrical service upgrades or structural modifications run toward the longer end. Call (844) 665-0162 and we can estimate your specific timeline after seeing the space.
Yes, Martin County requires permits for any electrical, plumbing, or structural work in a full kitchen remodeling project, which covers nearly every job we do. We prepare and submit all permit applications, schedule inspections, and ensure compliance with coastal construction and flood-zone requirements where they apply. The permit process typically adds 2 to 4 weeks before demolition can begin.
Yes, a replacement-style full kitchen remodeling keeps your existing layout and updates every visible surface and appliance, which saves significant cost and time. This works well when your current kitchen functions adequately but finishes are dated or worn. We still strip to studs, upgrade electrical and plumbing within the existing locations, and install all new materials.
The lowest-cost full kitchen remodeling in Hobe Sound keeps the existing footprint, uses stock cabinetry and laminate or entry-level quartz countertops, and retains current appliance locations. Even at this tier, we don’t skip permit compliance or code-required electrical upgrades on older homes. For an exact number on your space, call (844) 665-0162 for a free written estimate.
Our workmanship warranty covers installation labor and carpentry, while material warranties come directly from manufacturers like KraftMaid, Cambria, or your appliance brand. We register all manufacturer warranties in your name and provide documentation at project closeout. Specific warranty terms vary by product line; we disclose these during material selection so you’re choosing with full information.
Get a Free On-Site Estimate for Full Kitchen Remodeling in Hobe Sound
We’ll walk your kitchen, talk through what’s working and what isn’t, and give you a written estimate with line-item pricing and a realistic timeline. No pressure, no deposit required to get the number. Call (844) 665-0162 or reach out through our Hobe Sound service page. Many homeowners here pair a full kitchen remodeling with Full Bathroom Remodeling in Hobe Sound or Walk-In Showers & Shower Remodeling in Hobe Sound to coordinate trades and minimize disruption.
Written by Raymond Estevez, Owner at Groundwork Construction Co., serving Hobe Sound and South Florida.