Full Kitchen Remodeling in Pembroke Pines: What It Costs and How Long It Takes
Full kitchen remodeling in Pembroke Pines strips the room to the studs and rebuilds it with new layout, cabinets, countertops, appliances, flooring, lighting, and finishes. Most projects we run in western Pembroke Pines take 8 to 14 weeks from permit approval to final walkthrough, depending on HOA review timelines and whether plumbing or walls move. In the 33028 market, homeowners typically invest $14,000-$45,000. Call (844) 665-0162 and we’ll walk your space with you and price it out for free.
How We Approach a Full Kitchen Remodel in Pembroke Pines
We’ve learned that full kitchen remodeling in Pembroke Pines moves smoother when everyone knows the sequence upfront. Here’s how we stage it.
Stage 1: Design and selections (2-4 weeks)
We measure twice, photograph everything, and build a 3D model of your existing kitchen. You’ll decide cabinet line and door style, countertop material and edge profile, appliance package, flooring type, backsplash scope, and whether the island stays put, grows, or relocates. This is also when we flag any plumbing or electrical moves. In Pembroke Pines, we submit to your HOA architectural committee simultaneously with our internal drafting, since communities like Chapel Trail and Pembroke Falls require their own review before Broward County ever sees the plans.
Stage 2: Permits and HOA approval (3-8 weeks)
Broward County reviews structural, electrical, and plumbing plans for code compliance with Florida Building Code wind-load and impact standards. Meanwhile, your HOA processes colors, materials, and exterior window changes if your kitchen has them. We’ve seen HOA turnaround in Grand Palms take 10 days, and in Chapel Trail take 4 weeks. We manage both tracks so nothing sits idle.
Stage 3: Demolition and rough-in (1-2 weeks)
Cabinets, countertops, appliances, flooring, and drywall come out. If we’re moving a sink or range, we open slab or walls now. Because most Pembroke Pines homes sit on slab-on-grade over a shallow water table, any below-grade plumbing work stays shallow and contained. We protect adjacent rooms with dust barriers and run HEPA filtration. Electrical and plumbing rough-in follow demo, then we call for county inspection.
Stage 4: Installation and finishes (4-8 weeks)
Cabinets go in first, leveled and secured to block walls. Countertops template next, then fabricate offsite while we tile floors and backsplashes. Appliance delivery gets scheduled for after countertops. Finally, paint, trim, hardware, and fixture installation. We run a punch walk with you before final county inspection.
Stage 5: Final inspection and closeout (3-5 days)
Broward County inspects electrical, plumbing, and general construction. We correct anything on the spot, then hand over manuals, warranty docs, and care instructions for your specific materials.
The Material Decisions That Shape Your Kitchen
Full kitchen remodeling means choosing every surface and system. Here’s where the money and longevity actually live:
- Stock vs. semi-custom vs. custom cabinets: Stock boxes from KraftMaid or Wellborn run $4,000-$8,000 installed and deliver in 2-4 weeks. Semi-custom with modified heights, depths, and interior fittings land at $7,000-$12,000. Full custom, built to your exact dimensions with specialty finishes, pushes $10,000-$13,000 or beyond. For the 1980s-2000s kitchens common in Pembroke Pines, semi-custom usually solves the odd corner and soffit issues without the custom premium.
- Quartz vs. granite vs. solid surface countertops: Engineered quartz from Cambria, Silestone, or Caesarstone runs $3,500-$6,500 for a typical kitchen, resists staining, and needs no sealing. Natural granite starts lower but varies wildly by slab and requires annual maintenance. Solid surface like Corian scratches easier but repairs seamlessly. We bring samples to your house so you see them in your actual light.
- Tile vs. luxury vinyl plank flooring: Porcelain tile lasts decades and handles the humidity of western Pembroke Pines well, but it’s harder underfoot and slower to install. LVP clicks down fast, feels warmer, and costs less, though it won’t outlive the house. Most full remodels we do here land on tile for permanence or LVP for speed and comfort.
- Standard vs. panel-ready appliances: Panel-ready refrigerators and dishwashers disappear behind cabinet faces for a built-in look. They cost 20-40% more and limit your brand choices. Worth it for open-concept kitchens where the appliance wall faces the living space.
- Recessed, pendant, or under-cabinet lighting mix: We spec LED recessed throughout, pendants over islands, and under-cabinet strips for task work. Dimmer circuits add $400-$800 but transform how the kitchen feels after dark.
What Full Kitchen Remodeling Costs in Pembroke Pines, FL
| Component | Typical Range |
|---|---|
| Full kitchen remodel | $14,000-$45,000 |
| Small kitchen remodel | $9,000-$20,000 |
| Cabinet installation | $4,000-$13,000 |
| Countertop installation | $2,000-$6,500 |
| Backsplash installation | $800-$2,500 |
| Kitchen island installation | $3,000-$10,000 |
Five factors push your number up or down:
Kitchen size and layout complexity. A 10×10 galley with everything on one wall costs less than a 15×20 kitchen with an island, walk-in pantry, and multiple work zones.
Plumbing and electrical relocation. Moving a sink across the kitchen means trenching slab, rerouting drain lines, and possibly pumping due to that shallow water table in 33028. Keeping fixtures where they are saves $2,000-$5,000.
Structural changes. Removing a load-bearing wall to open to the living room requires an engineer, beam installation, and Broward County structural inspection. Adds $3,000-$8,000 depending on span and finish work.
Material grade and brand tier. A full KraftMaid kitchen with Silestone counters and GE Profile appliances runs toward the middle. Stepping up to custom cabinets, Caesarstone, and Sub-Zero pushes the top of range.
Permit and HOA scope. Some Pembroke Pines HOAs require bonded contractors, specific insurance certificates, and multiple submission rounds. We build these administrative costs into our estimate so you’re not surprised.
Our written estimates include demolition, disposal, materials, labor, permits, and inspections. What typically sits outside: appliance costs (you buy direct or through our dealer for warranty purposes), temporary kitchen setup, and any HOA application fees.
Why Pembroke Pines Homes Make This Job Different
The kitchen we’re remodeling in Pembroke Pines is almost certainly sitting in a CBS block house built between 1988 and 2006, on a slab poured over former Everglades wetlands with groundwater sometimes 24 inches below your feet. That matters when you’re moving drains or considering an addition. It also means your walls are solid concrete block, not stud framing, so cabinet anchoring and electrical routing take different hardware and more time than up north.
The bigger variable is the approval stack. Western Pembroke Pines communities like Chapel Trail, Pembroke Falls, and Grand Palms each run their own architectural review boards with submission deadlines, color palettes, and material restrictions entirely separate from Broward County’s building department. We’ve seen projects where the county permit was ready in 10 days but the HOA took 4 weeks to approve a window style change. Contractors who don’t know 33028 quote timelines based on county permits alone, then miss move-in dates. We build both approval tracks into our schedule from day one.
Wind code is the other local reality. After Hurricane Andrew, Broward County adopted some of Florida’s strictest impact and uplift standards. Any exterior wall penetration, window replacement, or structural modification in your kitchen triggers those rules. We spec materials and methods that pass inspection the first time, because re-inspection in Pembroke Pines costs days, not hours.
Serving Pembroke Pines, FL - Our Local Coverage Area
We’re based in the Pembroke Pines area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
Frequently Asked - Full Kitchen Remodeling in Pembroke Pines
From permit approval to final walkthrough, expect 8 to 14 weeks. Add 3 to 8 weeks upfront for HOA and Broward County approvals, especially in master-planned communities with architectural review boards. Call (844) 665-0162 and we’ll map the real timeline for your specific community.
Yes. Broward County requires permits for electrical, plumbing, and any structural work, which full kitchen remodeling always involves. Your HOA may also require pre-approval before permits are even submitted. We handle both tracks as part of our standard process.
Yes, and it saves significant money. Keeping your sink, range, and refrigerator in existing locations avoids slab work, drain rerouting, and structural engineering. A “gut and replace” full kitchen remodeling in Pembroke Pines typically lands in the lower half of our $14,000-$45,000 range.
Full kitchen remodeling means everything new: cabinets, countertops, flooring, lighting, appliances, and often layout changes. It’s part of a complete Kitchen Remodeling in Pembroke Pines project scope, but distinct from partial updates like cabinet refacing or countertop replacement alone. Our Kitchen Remodeling crew handles both, but we scope full remodels as the comprehensive rebuild they are.
We warranty our workmanship for one year on all full kitchen remodeling projects. Manufacturer warranties run longer: KraftMaid and Wellborn cabinets carry limited lifetime coverage, while Cambria, Silestone, and Caesarstone offer 10-year to lifetime residential warranties. We register everything in your name so you’re covered even if we part ways.
Absolutely. Many homeowners pair full kitchen remodeling with Full Bathroom Remodeling in Pembroke Pines or Walk-In Showers & Shower Remodeling in Pembroke Pines to consolidate disruption and contractor coordination. Because Groundwork is a single-source contractor covering everything from driveway to roofline, we can sequence multiple projects without the usual handoff chaos.
Start With a Free On-Site Estimate in Pembroke Pines
We’re based in Fort Lauderdale and work across Pembroke Pines regularly, particularly in the 33028 communities where we’ve navigated Chapel Trail, Pembroke Falls, and Grand Palms approvals dozens of times. Call (844) 665-0162 to schedule a free on-site estimate. Raymond Estevez or a senior project lead will walk your kitchen, take measurements, discuss what’s staying and what’s moving, and email you a detailed written estimate within 48 hours. No deposit required to price it out.
Written by Raymond Estevez, Owner at Groundwork Construction Co., serving Pembroke Pines since our South Florida founding.