What Full Kitchen Remodeling in Royal Palm Beach Actually Involves
Our Royal Palm Beach Kitchen Remodeling strips the room to framing and rebuilds it with new layout, cabinetry, countertops, appliances, lighting, and finishes - a complete transformation, not a surface refresh. Most projects we run in the village take 6 to 10 weeks from permit approval to final inspection, depending on whether we’re moving walls or plumbing. In Royal Palm Beach, full kitchen remodeling typically runs $14,000-$45,000, and you can reach us at (844) 665-0162 for a free on-site estimate that nails down your exact scope and price.
How We Approach a Full Kitchen Remodel Start to Finish
We’ve refined our process across dozens of Royal Palm Beach projects, mostly in the 1970s-1990s CBS homes that dominate the village. Here’s how the weeks actually break down.
Stage 1: Demo and discovery (3-5 days)
We pull everything - cabinets, countertops, flooring, drywall back to studs, and often the original soffits that eat up headroom in these older homes. This is where we find the surprises: galvanized plumbing still in place from 1982, aluminum wiring, or termite damage in the bottom plates. You’ll need to have your appliance selections finalized by day 3, since rough-in dimensions for refrigerators and ranges vary by model and affect electrical and gas locations.
Stage 2: Rough mechanicals and structural work (1-2 weeks)
If you’re opening the kitchen to the living area - common in these compartmentalized 1980s floor plans - we handle beam sizing and column placement now. We relocate plumbing, run new 20-amp circuits for appliances, and rough in recessed lighting and under-cabinet wiring. In Royal Palm Beach’s slab-on-grade homes, moving the sink or dishwasher means jackhammering concrete for new drain lines, which adds 2-4 days and a few thousand dollars. You’ll decide on final fixture locations during this stage; changes after drywall are expensive.
Stage 3: Inspections and dry-in (3-5 days)
Palm Beach County requires rough plumbing, electrical, and structural inspections before we close walls. We schedule these back-to-back to avoid delays. Once cleared, we hang drywall, tape, and float. You’ll pick your final paint colors and backsplash tile now if you haven’t already.
Stage 4: Cabinetry, countertops, and finishes (2-3 weeks)
Cabinets go in first, followed by templating for countertops. Quartz and granite need 7-10 business days from template to install; we coordinate this gap so flooring and backsplash work happen in parallel. Appliance delivery gets scheduled for the day after countertops cure. You’ll do a walkthrough with our project manager before backsplash grout goes in - the last easy moment to adjust outlet placements or add task lighting.
Stage 5: Final details and punch list (3-5 days)
We install hardware, tune drawer slides, seal countertops, and run every appliance through a full cycle. Palm Beach County does a final inspection for permitted electrical and plumbing changes. We do our own punch list walk with you, then turn over care and maintenance guides for your specific materials.
The Choices That Shape Your Kitchen
Our Kitchen Remodeling services mean deciding between real alternatives, not just picking what’s in stock. Here are the trade-offs we walk Royal Palm Beach homeowners through:
- Stock vs. semi-custom vs. custom cabinetry: Stock cabinets (KraftMaid, Wellborn entry lines) run $4,000-$7,000 for a typical Royal Palm Beach kitchen and deliver in 2-3 weeks. Semi-custom adds modified heights, deeper drawers, and interior fittings - $7,000-$11,000, 4-6 weeks. Full custom starts around $12,000 and suits kitchens with unusual dimensions or specific storage needs. Most village homes fit semi-custom perfectly.
- Quartz vs. granite vs. solid surface: Engineered quartz (Cambria, Silestone, Caesarstone) resists staining and needs no sealing - ideal for busy families, $2,500-$5,500 installed. Granite offers unique veining but requires annual sealing, $2,000-$4,500. Solid surface (Corian) repairs seamlessly but scratches easier; we rarely spec it for full remodels anymore.
- Keep the layout or open it up: Working within existing plumbing and gas locations saves $2,000-$5,000 and a week of schedule. Opening to the living room requires a structural beam, permits, and often rerouting HVAC ducts hidden in soffits - but transforms how the house lives.
- Standard appliances or built-in panels: Panel-ready dishwashers and refrigerators blend with cabinetry for $800-$2,500 more per appliance. The look is clean; the repair access is slightly more involved. We ask whether you plan to stay 5 years or 20 - the math changes.
- LED recessed vs. layered lighting: Basic 6-inch LED cans with a central flush mount run $800-$1,200. A layered plan - cans, pendants, under-cabinet LED strips, and dimmable switches - hits $2,000-$3,500 but eliminates the shadowed countertops we see in almost every original Royal Palm Beach kitchen.
What Full Kitchen Remodeling Costs in Royal Palm Beach, FL
| Scope Level | Price Range | Typical Inclusions |
|---|---|---|
| Refresh (cabinets, counters, paint, appliances in place) | $14,000-$22,000 | Semi-custom cabinets, quartz counters, new backsplash, LED lighting, paint |
| Mid-range full remodel (layout changes, quality finishes) | $22,000-$34,000 | Layout modification, semi-custom or custom cabinets, stone counters, hardwood or tile flooring, appliance upgrade |
| High-end transformation (structural, premium materials) | $34,000-$45,000+ | Wall removal with beam, custom cabinetry, premium stone, built-in appliances, custom lighting design |
Five variables push you up or down this range. Kitchen size is obvious - a 150-square-foot galley in a 1978 ranch costs less than a 300-square-foot kitchen in a 1995 estate home. Existing condition matters more here than in newer markets; we’ve opened walls to find corroded cast-iron drains and ungrounded circuits that must be brought to current code. Plumbing and electrical relocation adds $1,500-$5,000 depending on slab work and panel capacity. Material grade can swing cabinet and countertop costs by 40% within the same footprint. And permit scope - electrical service upgrades, structural beam calcs, gas line extensions - layers both cost and inspection time.
Our written estimates itemize labor, materials, permits, and a line for “conditions allowance” covering typical discoveries in homes of this era. What we don’t include: appliance costs (you purchase separately for warranty and selection flexibility), temporary kitchen setup, and any HOA architectural review fees.
Why Royal Palm Beach Homes Make This Job Specific
Royal Palm Beach, FL‘s master-planned origins created a housing stock that’s now simultaneously aging and valuable - and that combination defines how we approach full kitchen remodeling here. The village was built out almost entirely between the mid-1970s and late 1990s, meaning the CBS homes we work on daily were constructed under pre-2002 Florida Building Code standards. Original kitchens are small by current standards, with 8-foot ceilings, soffit-hung cabinets, and aluminum single-pane sliders that don’t meet today’s energy or wind-load expectations.
This matters for your project in concrete ways. Many homeowners doing a full kitchen remodel in Royal Palm Beach are also facing Citizens Property Insurance renewal inspections demanding hurricane mitigation upgrades - roof-deck clips, Impact Windows & Doors in Royal Palm Beach, truss wrapping. We coordinate these scopes so you’re not paying for drywall repair twice. The village’s pervasive HOA covenants, stricter than unincorporated Acreage properties nearby, govern exterior finishes and setbacks; while kitchen work is interior, any window replacement or room addition tied to your remodel triggers architectural review. We submit those packages as part of our permitting process.
The slab-on-grade foundations and seasonally high water table mean any plumbing relocation requires careful sequencing - we avoid June-through-October jackhammering when possible, since wet-season saturation can compromise new concrete patches. And the homogeneous 1970s-1990s build era means we’ve seen nearly every original configuration: the galley kitchens off Crestwood Boulevard, the L-shaped plans in Sandalwood Lakes, the eat-in kitchens with the dropped fluorescent boxes that homeowners in Saratoga Lakes want gone. We know where the surprises hide.
Serving Royal Palm Beach, FL - Our Local Coverage Area
We’re based in the Royal Palm Beach area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
Frequently Asked - Full Kitchen Remodeling in Royal Palm Beach
Most full kitchen remodeling projects in Royal Palm Beach take 6 to 10 weeks from permit approval to final walkthrough, with 8 weeks being typical for a mid-range scope that includes layout changes. Demolition through rough inspections moves fast; cabinet lead times and countertop templating are usually the schedule drivers. Call (844) 665-0162 and we’ll timeline your specific layout.
Yes, Palm Beach County requires permits for electrical, plumbing, and structural work - which covers nearly every full kitchen remodel we do. We pull permits, schedule inspections, and handle corrections as part of our standard process. Your HOA may also require architectural review if windows or exterior walls are affected.
Absolutely, and it’s the most common starting point for homeowners who want transformation without structural cost. Keeping the sink, dishwasher, and range in existing locations saves $2,000-$5,000 and avoids slab work and permit delays. We still deliver new cabinetry, countertops, lighting, and finishes that feel like a completely different room.
Piecemeal repairs almost always cost more over a 5-year span and deliver less satisfaction. Replacing cabinets while keeping old counters, then replacing counters later, means paying for demo and install twice - and living with mismatched finishes. A full kitchen remodel bundles everything with one contractor, one timeline, and one accountable warranty. For exact numbers on your home, we offer free estimates at (844) 665-0162.
We warranty our workmanship for one year on all full kitchen remodeling projects, with manufacturer warranties on cabinets, countertops, and appliances passing through to you directly. Our project managers document every product serial number and warranty registration so you’re not hunting paperwork later. We also return for a 30-day check-in to tune hardware and address any settlement issues.
Start With a Free On-Site Estimate
Full kitchen remodeling in Royal Palm Beach is a significant investment, and you deserve specifics before you commit. We’ll walk your space, identify the conditions that affect your timeline and price, and deliver a written estimate with itemized labor, materials, and permit costs. Call (844) 665-0162 or reach out through our site to schedule - most Royal Palm Beach homeowners hear back within one business day, and we typically book estimates within a week.
Written by Raymond Estevez, Owner at Groundwork Construction Co., serving Royal Palm Beach since our South Florida launch.