Groundwork of Fort Lauderdale, FLCall (844) 665-0162
A Groundwork company - serving Fort Lauderdale, FL
Tub-to-Shower Conversion in Tamiami, FL | Groundwork Construction Co. of South Florida

Tub-to-Shower Conversion in Tamiami - Same-Day Service, Done Right the First Time

Professional tub-to-shower conversion services in Tamiami, FL. Licensed & insured. Same-day and after-hours emergency service available.

144+
Cities Served
Fast
Emergency Response
Licensed & Insured Fast Response Free Estimates All Brands Satisfaction Guarantee

Tub-to-Shower Conversion in Tamiami, FL: What It Costs and How Long It Takes

A tub-to-shower conversion in Tamiami replaces your existing bathtub with a dedicated shower enclosure, typically taking 5 to 10 working days depending on whether plumbing stays put or gets relocated. Most homeowners in the 33184 ZIP code pay between $3,500 and $10,000, with the final number hinging on three decisions you’ll make before we swing a hammer: enclosure type, fixture grade, and whether the drain and valve locations move. Call (844) 665-0162 and we’ll walk through those choices on a free on-site estimate.

Call (844) 665-0162

How We Handle a Tub-to-Shower Conversion Start to Finish

We’ve done enough of these in Tamiami’s 1970s-1990s CBS homes to know where the surprises hide. Here’s the actual sequence, with the decisions you’ll need to make at each stage.

Day 1: Demo and Discovery

We strip the tub, surround, and any water-damaged substrate. In Tamiami’s older stock, we often find the original tub sat on a mortar bed poured directly over that thin oolitic limestone slab, sometimes with no proper waterproofing membrane behind decades-old tile. This is the moment of truth: if the wall framing behind the surround is sound and the drain location works for your new layout, we stay on schedule. If the limestone has channelled moisture into adjacent block walls, we stop, document, and call you with photos before proceeding. You’ll decide today whether to relocate the drain or keep it where it is.

Days 2-3: Plumbing and Rough-In

If you’re keeping the existing drain and valve locations, we cap, test, and move to prep. If we’re moving plumbing - say, converting a 60-inch tub to a 48-inch shower to steal space for a linen niche - this is when our licensed plumber reroutes drain lines through that stubborn Miami limestone. The shallow water table in Tamiami means we can’t just core freely; we map the slab, use vacuum extraction to keep the work zone dry, and pressure-test every joint before closing it up. You’ll confirm your fixture heights and any body-spray locations today.

Days 4-5: Pan, Walls, and Waterproofing

We set the shower pan - either a prefab acrylic base or a site-poured mud pan with topical waterproofing - and install cement board or foam wall panels. In Tamiami’s humid climate, we spec vapor-retardant assemblies behind every surface, not just tile. You’ll choose your wall material now if you haven’t already: large-format porcelain, subway ceramic, solid surface panels, or a composite surround. Each has different lead times, so this decision affects whether we finish on day 8 or day 12.

Days 6-8: Tile or Panel Installation and Grout

Tile crews work methodically here; rushed grout work in South Florida’s humidity breeds mold behind the walls within two years. We use epoxy grout on floor pans and polymer-modified grout on walls, with expansion joints every 8 feet. If you selected a Kohler Choreograph wall system or similar solid surface, installation moves faster - often a single day. You’ll do a walkthrough with our lead carpenter to confirm layout, niche placement, and any accent strip positioning before we set the final row.

Days 9-10: Glass, Fixtures, and Final Inspection

We install your glass enclosure - framed, semi-frameless, or frameless - and set the valve, showerhead, and any hand-shower or thermostatic controls. Then we pressure-test, flood-test the pan for 24 hours, and call for Miami-Dade’s plumbing inspection if the permit requires it. You’ll receive a photo packet of the waterproofing layer, a copy of the inspection sign-off, and our workmanship warranty documentation.

The Options You’ll Choose Between for Your Tamiami Conversion

  • Shower base: prefab acrylic vs. site-built mud pan. Acrylic runs $400-$900 installed, locks you into standard sizes, and feels slightly hollow underfoot. A mud pan with waterproofing membrane adds $1,200-$2,800 but lets us build any dimension, pitch the floor precisely, and pair with any tile you want. For Tamiami’s older homes with out-of-level floors, the mud pan is usually worth it.
  • Wall surround: composite panels vs. tile vs. solid surface. Composite surrounds (Swanstone, similar) run $1,500-$3,500 all-in, install fast, and clean easily - fine for a rental or tight timeline. Tile ranges from $2,500 for basic ceramic to $6,000+ for large-format porcelain with epoxy grout. Solid surface like Kohler Choreograph or Swanstone solid panels splits the difference at $2,800-$4,500, with no grout lines to maintain in this humidity.
  • Fixture grade: builder-basic vs. mid-spec vs. premium. Moen Chateau or similar at $150-$300 per valve gets you 5-7 years of reliable service. Step up to Moen’s M-CORE or Kohler’s Purist lines at $400-$800 for better cartridge longevity and finish warranties that hold up to Tamiami’s salt-laden air. Thermostatic valves and multi-function diverters push past $1,200 but eliminate temperature swings when someone flushes elsewhere in the house.
  • Glass enclosure: framed, semi-frameless, or frameless. Framed sliders start around $600; semi-frameless hits $1,200-$1,800; true frameless with 3/8-inch glass and minimal hardware runs $2,000-$3,500. In Tamiami’s tight bathrooms, a frameless door on a fixed panel can make a 32-inch shower feel significantly larger.
  • Plumbing relocation: keep it or move it. Keeping existing drain and valve locations saves $800-$2,000 and 1-2 days. Moving the drain across the slab means cutting through that oolitic limestone, adding dewatering time, and extending the schedule. We only recommend it when the layout gain is substantial - a true walk-in feel, space for a bench, or accessibility requirements.

What Tub-to-Shower Conversion Costs in Tamiami, FL

In Tamiami, a tub-to-shower conversion runs $3,500 to $10,000. Here’s what pushes a job toward the low or high end:

Cost Factor Low-End Impact High-End Impact
Shower base type Prefab acrylic, standard 60″ x 30″ Custom mud pan, 48″ x 36″ or larger
Wall material Composite surround Large-format tile or solid surface
Plumbing changes Existing drain/valve locations Relocated drain, new valve, body sprays
Fixture selection Single-handle builder grade Thermostatic valve, hand shower, niche lighting
Glass enclosure Framed sliding door Frameless with heavy glass and hardware

A written estimate from Groundwork Construction Co. includes demo, disposal, rough plumbing, pan installation, wall finishes, fixture setting, glass enclosure, and permit coordination. It does not include bathroom vanity replacement, floor tile outside the shower footprint, or electrical work beyond a basic exhaust fan swap - though we can quote those as part of a full Bathroom Remodeling in Tamiami if you’re expanding scope. Call (844) 665-0162 for an exact number; estimates are free.

What Tamiami’s Conditions Mean for This Specific Job

Tamiami’s housing stock shapes every tub-to-shower conversion we do here. The CBS homes built during the 1970s-1990s westward push from Miami proper typically have original bathrooms with cast-iron or steel tubs set in mortar beds, often with galvanized drain lines that have corroded internally. When we cut the slab to access that drain, we’re working 12-18 inches above oolitic limestone that’s hard enough to stall standard bits - and porous enough that groundwater seeps in continuously during the dry season, let alone after a June afternoon deluge.

That shallow water table means our crews run dewatering pumps on nearly every slab-cut job in the 33184 ZIP, a line item contractors from outside South Florida routinely miss in their bids. The original stucco behind these tub surrounds also tends to be single-coat over wire lath, with no drainage plane; we’ve opened walls to find rebar corrosion in the block cores from years of slow moisture migration. We address it when we find it, not with upsell pressure, but because a shower conversion that traps water in those walls fails within three years in this climate.

Permitting runs through Miami-Dade County’s Building Department, and any plumbing relocation triggers a rough-in inspection before close-up. For homes in communities along the Tamiami Trail corridor, HOA architectural review may add 2-4 weeks to the front end; we handle the submittal package, but homeowners should check their association’s published guidelines for fixture finish restrictions or contractor insurance requirements.

Homeowners in Tamiami often pair interior work with exterior upgrades, and our Metal Roofing in Tamiami and Tile Roofing in Tamiami crews coordinate timing so you’re not juggling multiple contractors across the property. Our Tamiami service area covers the full 33184 ZIP and adjacent unincorporated pockets west to the Everglades boundary.

Serving Tamiami, FL - Our Local Coverage Area

We’re based in the Tamiami area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

Frequently Asked - Tub-to-Shower Conversion in Tamiami

Ready to Replace Your Tub with a Shower in Tamiami?

Call (844) 665-0162 to schedule a free on-site estimate for your tub-to-shower conversion. Raymond Estevez or a member of our Bathroom Remodeling crew will measure your space, check drain and wall conditions, and deliver a written scope with line-item pricing - no deposit required to book, no pressure to decide on the spot. We’ll also flag any exterior work that makes sense to coordinate, since our full-scope team handles everything from driveway to roofline under one contract.

Written by Raymond Estevez, Owner at Groundwork Construction Co., serving Tamiami and South Florida homeowners since our founding.

Why Tamiami Chooses Groundwork Construction Co. of South Florida

We set the standard for tub-to-shower conversion in Tamiami.

30-60 Min Response

Fast dispatch across Tamiami. Same-day and after-hours emergency service available.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Tamiami

Getting your tub-to-shower conversion handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your tub-to-shower conversion needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Tamiami - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local tub-to-shower conversion pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    A background-checked tech heads outLicensed & insured, typically within 1-hour.
  4. 4
    You approve before work beginsNothing starts until you say go.

What Tamiami Customers Say

Trusted by homeowners across Tamiami and surrounding areas.

★★★★★

"Called late on a Friday and they had someone at my door within the hour. Professional, clean work, and the price was exactly what they quoted."

Jason M. · Tamiami
★★★★★

"Best in Tamiami. Diagnosed the problem immediately and fixed it in under an hour. Two other companies couldn't even get me an appointment that week."

Amanda K. · Tamiami Area
★★★★★

"Very impressed with the upfront pricing and professionalism. No hidden fees, no upselling - just honest work done right. My go-to company from now on."

Robert L. · Near Tamiami
★★★★★

"Had an after-hours emergency and they answered right away and sent someone fast. Exactly what you want in a crisis."

Lisa P. · Tamiami

Ready for Tub-to-Shower Conversion in Tamiami?

Call now for a free estimate - or request one below. Licensed, insured, and here with fast after-hours help in Tamiami.

(844) 665-0162

Request a Free Estimate in Tamiami

Tell us about your tub-to-shower conversion needs - we'll respond within the hour.

When you send us your details, you agree to our Privacy Policy and authorize us to contact you through phone, text, or email concerning your request, including by the partner businesses that may perform the service.

Prefer to text? Send a Text
Areas We Serve
SunriseWilton ManorsMelrose ParkNorth Andrews GardensOakland ParkLauderhillDaniaDania BeachLauderdale LakesLauderdale-by-the-SeaBroadview ParkPlantationFort LauderdaleDavieWest Hollywood All Service Areas →
Call Now Free Estimate