Vanities, tile & fixtures in Greenacres City typically runs $9,000-$28,000 for a full bathroom overhaul involving all three elements, with most projects completing in 2-3 weeks. If you’re keeping the existing layout and only swapping surfaces, you’re looking at the lower half of that range. Call (844) 665-0162 and we’ll walk your specific space in person - estimates are free.
How We Handle Vanities, Tile & Fixtures - Start to Finish
We’ve done enough of these in Greenacres City to know where the surprises hide. Here’s the actual sequence, with what you’ll need to decide at each point.
Day 1: Demo and discovery. We pull the old vanity, mirror, lighting, and tile down to the studs. This is where we find the stuff you can’t see - corroded cast-iron drain lines, improperly sloped shower pans, or drywall that’s been wet for years behind the tile. In the 1960s-1980s CBS ranch homes that dominate Greenacres City, we regularly find original galvanized supply lines still in service. If they’re intact, we note it. If they’re failing, we flag it now before tile goes up. Demo day takes 4-6 hours for a standard hall bath.
Days 2-3: Rough plumbing and electrical. If you’re moving the vanity location or upgrading to a double-bowl, this is when we relocate drains and supplies. For electrical, we’re often adding GFCI protection that wasn’t required when the home was built, or running dedicated circuits for heated floors or towel warmers. You’ll need your vanity spec locked in by day 2 - width, depth, bowl configuration, and whether it’s furniture-style or built-in - because drain rough-in heights vary by model. Rough work typically takes 1-2 days.
Days 4-6: Wall prep and waterproofing. Greenacres City’s humidity means we don’t skip steps here. We use cement board or equivalent tile backer, taped seams, and liquid-applied waterproofing membrane in wet areas per Florida Building Code. For shower floors, we pour a pre-slope, install the pan liner, then the final mud bed - three days minimum before tile can touch it. Rushing this is how you get callbacks.
Days 7-12: Tile and grout. Layout happens first - we mark every sheet or piece before any adhesive goes down. You’ll see the pattern, the cuts around windows and niches, the transition to drywall. For floors, we check the slab with a long level; older Greenacres City slabs often have minor settlement dips that need patching before large-format tile goes down. Grout gets 24 hours minimum before we seal it. Most tile work finishes in 4-6 days depending on complexity.
Days 13-15: Vanity, fixtures, and final connections. Vanity gets leveled on the finished floor, plumbed, and secured. We install faucets, shower trim, toilet, and any accessories. Final electrical - vanity lights, exhaust fan, switches. Then we pressure-test everything, run the exhaust fan for a full cycle, and do our walkthrough with you. Punch list items get handled before we leave, not in a separate trip.
That’s the full arc for a typical Greenacres City bathroom. Keeping the existing vanity location and plumbing rough-in saves 2-3 days and roughly $1,500-$3,000.
The Material Choices You’ll Actually Decide Between
- Vanity construction: solid wood vs. plywood vs. MDF. Solid wood vanities - think maple, oak, or bamboo - handle Greenacres City’s humidity best but cost $1,200-$2,800 for a 36-48 inch unit. Plywood boxes with solid-wood frames run $800-$1,800 and perform well if the finish is intact. MDF with thermofoil or laminate faces starts around $400 but swells at any seam breach. For a rental or quick flip, MDF works. For your own home, we typically spec plywood minimum.
- Countertop surface: quartz, granite, or solid surface. Quartz (engineered stone) is what we install most - non-porous, no sealing, and the Cambria, Silestone, and Caesarstone lines we carry have patterns that read like natural stone. Granite runs $60-$100 per square foot installed, quartz $75-$140, solid surface (Corian-type) $50-$90. Granite needs annual sealing; in Greenacres City’s hard water, that matters more than you’d think.
- Tile body: porcelain vs. ceramic vs. natural stone. Porcelain absorbs less than 0.5% water - critical for shower floors and any exterior-facing bath. Ceramic works for dry-area walls and costs 30-40% less. Natural stone (marble, travertine, slate) looks rich but demands sealing every 6-12 months in this climate. We flag this honestly; some homeowners love the patina, others don’t want the maintenance.
- Tile format: mosaic, subway, or large-format. Mosaics on mesh sheets handle curved shower floors and complicated layouts but cost more in labor. Subway tile is forgiving and timeless. Large-format (24×48 or bigger) looks sleek, requires a dead-flat wall or floor, and shows any substrate imperfection. In older Greenacres City homes with settled slabs, we often recommend against large-format on floors unless we’re self-leveling first.
- Fixture finish and valve type. Chrome, brushed nickel, matte black, or oil-rubbed bronze - largely aesthetic, though chrome shows water spots least in hard-water areas. For shower valves, we spec pressure-balanced minimum; thermostatic adds $300-$600 but holds temperature when someone flushes elsewhere in the house. Worth it in homes with original 3/4-inch supply lines serving multiple fixtures.
What Vanities, Tile & Fixtures Costs in Greenacres City, FL
| Scope Level | Typical Range | What Drives It |
|---|---|---|
| Surface refresh - vanity, tile, fixtures, no plumbing moves | $9,000-$14,000 | Material grade, tile complexity, single vs. double vanity |
| Mid-range reconfiguration - relocated vanity, new shower tile, upgraded fixtures | $14,000-$22,000 | Plumbing relocation, waterproofing extent, electrical upgrades |
| Full transformation - gut, layout change, premium materials, structural access | $22,000-$28,000 | Moving walls, custom vanity, natural stone, heated floors |
Five variables push you up or down that ladder. Existing condition: homes with water damage behind tile, failing cast drains, or aluminum wiring need remediation before cosmetic work starts. Layout changes: moving a vanity across the room means new supply, drain, and vent lines - $1,500-$4,000. Material grade: the spread between a big-box MDF vanity and a custom maple piece with quartz top can be $2,000+ alone. Permit scope: Greenacres City permitting for plumbing and electrical modifications adds cost but protects resale value and insurance compliance. Access difficulty: tight bathrooms where we can’t get a standard vanity through the door mean custom sizing or on-site assembly.
A written estimate from us includes demo, disposal, all materials, labor, permit fees, and final cleanup. It does not include your towel bars and toilet paper holders unless you ask us to spec them - most homeowners pick those themselves.
What Greenacres City Homes Specifically Do to This Job
The housing stock here shapes nearly every vanities, tile & fixtures project we take on. Greenacres City’s dominant 1960s-1980s CBS ranch homes were built before Florida’s post-2004 hurricane code overhaul, and that matters even for interior work. The original bathrooms in these homes are typically 5×8 feet with the vanity, toilet, and tub-shoe crammed in a straight line - functional for the era, tight by current standards. When homeowners want a double vanity or a larger walk-in shower, we’re often working within block walls that can’t move without structural engineering.
The shallow water table in this former agricultural area means slab-on-grade construction with no basement access. If we need to relocate a drain, we’re cutting concrete - not going underneath. That adds a day and $800-$1,500 to what would be a simpler job in a home with a crawl space or basement.
Permitting through Palm Beach County (Greenacres City contracts county building services) requires electrical and plumbing inspection for anything beyond direct fixture replacement. The 170 mph design wind speed requirement doesn’t directly govern bathroom work, but the county’s broader inspection culture means they flag improper exhaust fan venting, inadequate bathroom ventilation rates, and non-GFCI protection - all things that were code-compliant when these homes were built but aren’t now. We pull permits on every job that needs them; the alternative is a failed home sale inspection later.
Homeowners in Greenacres City often pair interior updates with exterior hardening - roof work, impact windows, or Tile Roofing in Greenacres City - because the My Safe Florida Home program and insurance market make those upgrades financially urgent. We coordinate timing so you’re not living through two separate construction phases. Our Specialty Roofing in Greenacres City crew works from the same schedule, same superintendent.
If your project is part of a full Bathroom Remodeling in Greenacres City, we scope the vanities, tile & fixtures phase to integrate cleanly with any shower or tub work. Our Bathroom Remodeling crew handles the full coordination. We cover Greenacres City and the surrounding Palm Beach County corridor from our Fort Lauderdale base.
Serving Greenacres City, FL - Our Local Coverage Area
We’re based in the Greenacres City area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
Frequently Asked - Vanities, Tile & Fixtures in Greenacres City
Most projects finish in 2-3 weeks from demo to final walkthrough. A straight fixture and surface swap with no plumbing moves can compress to 5-7 days. Call (844) 665-0162 and we’ll time it to your specific scope.
Yes, if you’re moving plumbing or electrical. Palm Beach County requires permits for drain relocations, new supply lines, circuit additions, and exhaust fan changes. Direct fixture replacement on existing rough-in typically does not. We pull permits as part of our standard process when they’re required.
Usually, yes - and that’s the most cost-effective path. Keeping the toilet, vanity, and tub/shower in their original locations avoids rough-in work and keeps you in the $9,000-$14,000 range. The visual transformation is still significant with new surfaces, fixtures, and lighting.
Water damage behind existing tile, especially in the shower surround. The humidity here accelerates grout failure, and by the time tile looks bad, the substrate is often compromised. We find it during demo and flag it immediately with photos and a revised scope before proceeding.
We warranty our installation workmanship. Manufacturer warranties cover the vanity, tile, and fixtures themselves - typically 1 year on faucets, 5-25 years on tile (varies by manufacturer), and lifetime on many quartz countertops. We register manufacturer warranties on your behalf and provide documentation at completion.
Get Your Greenacres City Bathroom Spec’d Out
Call (844) 665-0162 to schedule a free on-site estimate for vanities, tile & fixtures in Greenacres City. We’ll measure your space, check existing conditions, and return a written scope with material options across multiple price tiers. No deposit required to get the estimate. Raymond Estevez and our team handle every phase in-house - one contractor, every phase.