A Groundwork company - serving Fort Lauderdale, FL
Vanities, Tile & Fixtures in Tamiami, FL | Groundwork Construction Co. of South Florida

Vanities, Tile & Fixtures in Tamiami - Licensed & Insured, Written Fixed-Price Quotes

Free on-site estimate and a written, line-item quote before any work begins. One contract, one crew, one accountable point of contact. Licensed, insured, permits handled.

Call to schedule your free estimate

23+
Years in Business
144+
Cities Served
Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Vanities, Tile & Fixtures in Tamiami, FL - Scope, Timeline & Cost

Vanities, Tile & Fixtures in Sweetwater typically runs $9,000-$28,000 for a full bathroom material overhaul, with most projects finishing in 2-3 weeks once materials arrive. We’re talking about replacing the vanity cabinet and top, wall and floor tile, and all plumbing fixtures - sink faucet, shower valve, trim, and toilet - while keeping the existing layout. Call (844) 665-0162 for a free on-site estimate and material selection walkthrough.

Call (844) 665-0162

How We Handle Vanities, Tile & Fixtures - Start to Finish

Every job follows five stages. Here’s what happens, what you’ll need to decide, and how long each phase takes.

Stage 1: Demo and rough inspection (Day 1)

Through our ADU Site Prep & Utilities service in Tamiami, we strip out the old vanity, remove tile down to the substrate, and pull fixtures. For 1970s-1990s Tamiami homes with original cast-iron tubs, this often means cutting the tub into sections to get it through the door. We inspect the subfloor for water damage - common in older CBS homes where previous caulk failures let moisture seep behind tile for years. If the subfloor’s compromised, we’ll flag it now, not midway through. This stage takes one day.

Stage 2: Plumbing and electrical rough-in (Days 2-3)

Even when you’re keeping the layout, we often replace supply lines and drain assemblies that have corroded in Tamiami’s hard water. If you’re moving from a single to double vanity, or switching from a deck-mounted to wall-mounted faucet, this is when we relocate rough plumbing. Electrical updates - adding GFCI protection, relocating sconces, or wiring LED mirror cabinets - happen here too. You’ll confirm fixture placement and tile layout now; changes after this point cost time and money. Two days, sometimes three if we’re waiting on a Miami-Dade plumbing inspector.

Stage 3: Tile installation (Days 4-8)

Floor tile goes first, then wall tile after a 24-hour cure. In Tamiami’s humidity, thinset cure times stretch longer than inland jobs - we don’t rush this. For shower walls, we use cement board with a liquid membrane or Schluter-Kerdi system; the old tar-paper-and-wire method fails faster here. You’ll have already chosen tile size and pattern - large-format tiles need more prep for flatness, mosaics take longer to set and grout. Five days is typical for a standard bathroom.

Stage 4: Vanity and fixture set (Days 9-11)

Vanity gets leveled on shims, secured to studs, and plumbed. We set the countertop, install the sink and faucet, then hang the mirror or medicine cabinet. Fixture trim - shower valve, tub spout, toilet - goes in last. We pressure-test everything and run water for 30 minutes to check for leaks. Three days, with tile grout curing in parallel.

Stage 5: Final inspection and punch (Day 12-14)

Miami-Dade requires a final plumbing inspection on any fixture relocation or valve replacement. We schedule this, address any corrections, then seal grout, caulk transitions, and walk you through operation and care. Two days, though inspector availability can push this.

The Material Choices You’ll Actually Decide Between

These aren’t abstract “good, better, best” tiers. They’re real trade-offs we discuss with every Tamiami homeowner.

  • Vanity cabinet: KraftMaid or Wellborn box cabinets vs. custom built-ins. Box cabinets run $800-$2,200, deliver in 4-6 weeks, and hold up fine in conditioned bathrooms. Custom built-ins cost $3,500-$8,000, take 8-12 weeks, but solve odd wall dimensions or let you match existing millwork. For 1970s Tamiami homes with out-of-square walls, custom often saves money on install labor.
  • Vanity top: Cultured marble vs. quartz vs. natural stone. Cultured marble at $200-$600 is budget-friendly but scratches and yellows in 5-7 years. Quartz - Cambria, Silestone, Caesarstone - runs $800-$2,500, doesn’t etch, and handles hair products and cleaners better. Natural stone ($1,200-$3,500) looks unmatched but needs annual sealing; in Tamiami’s humidity, that maintenance gets skipped and staining follows.
  • Wall tile: Ceramic vs. porcelain vs. natural stone. Ceramic at $2-$5/sq ft works for dry walls; porcelain ($4-$12/sq ft) is mandatory for shower surrounds - its density resists the moisture absorption that destroys grout joints here. Natural stone tile ($8-$20/sq ft) demands sealed grout and diligent ventilation; we’ve replaced too many limestone showers where exhaust fans couldn’t keep up.
  • Floor tile: Large-format porcelain vs. mosaic sheets. Porcelain plank or 12×24″ formats ($5-$15/sq ft installed) minimize grout lines and clean easier. Mosaic sheets ($8-$18/sq ft) add slip resistance but mean more grout to maintain. For Tamiami homes where grandkids or aging parents visit, that slip-resistance trade-off matters.
  • Fixtures: Builder-grade chrome vs. solid brass with PVD finish. Chrome-plated zinc fixtures ($80-$250) corrode at the coast in 3-5 years. Solid brass with physical vapor deposition finish ($300-$800) resists salt air and carries lifetime warranties from manufacturers like Moen and Delta. The upfront difference pays for itself once.

What Vanities, Tile & Fixtures Costs in Tamiami, FL

Component Typical Range
Bathroom vanity installation (single, replace-in-kind) $800-$3,000
Floor and wall tile (material + labor, standard bath) $3,500-$10,000
Fixtures (faucet, shower valve, trim, toilet) $1,200-$4,500
Demo, disposal, rough plumbing, permits $2,500-$7,500
Total project range $9,000-$28,000

Five variables push you toward the high or low end:

Existing condition. Subfloor rot, corroded cast-iron drains, or outdated electrical adds $2,000-$6,000 before tile touches wall.

Plumbing relocation. Keeping fixture locations saves $1,500-$4,000 in rough plumbing and permit complexity.

Material grade. Moving from ceramic to porcelain tile, or chrome to solid brass fixtures, typically adds 30-50% to material costs.

Vanity size and configuration. A 72″ double vanity with quartz top costs roughly double a 36″ single with cultured marble.

Permit scope. Miami-Dade’s HVHZ jurisdiction requires permits for any plumbing or electrical work; we handle this, but inspection scheduling adds 3-5 calendar days to timelines.

Our written estimates include demo, disposal, materials, labor, permits, and final inspection. They don’t include asbestos or lead testing (required pre-1978 homes), temporary bathroom arrangements, or post-project deep cleaning.

What Tamiami Homes Specifically Do to This Job

Tamiami’s housing stock changes everything about how we approach vanities, tile & fixtures here. The 1970s-1990s CBS homes that dominate Tamiami were built before Miami-Dade’s post-Andrew HVHZ overhaul, which means we routinely open walls to find ungrounded electrical, galvanized supply lines, and original tar-paper shower waterproofing that’s failed years ago. Bringing a bathroom up to current code - grounded GFCI circuits, impact-rated windows if we’re replacing them, proper exhaust ventilation - isn’t optional if we touch the plumbing or electrical.

The shallow water table matters too. We’ve had jobs on SW 137th Avenue and near the Aluminum Fence - Tamiami area where slab moisture migration kept thinset from curing properly until we installed a topical moisture barrier. That limestone shelf 12-18 inches down? It channels groundwater laterally, so even bathrooms that haven’t leaked can show efflorescence on slab floors - white mineral deposits that new tile installations lock in unless we address the source.

Then there’s the salt air. Fixtures that last a decade in Orlando corrode in five years here. We spec brass-bodied valves and PVD finishes as standard, not upgrades, because replacing a shower valve behind new tile is a $2,000+ callback we won’t risk. For homeowners in Bathroom Remodeling in Tamiami as part of a full renovation, we coordinate this scope with window upgrades and exterior sealing to address the whole envelope.

Serving Tamiami, FL - Our Local Coverage Area

We’re based in the Tamiami area and know this community well, offering Tamiami ADU Design & Permitting expertise. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

Frequently Asked - Vanities, Tile & Fixtures in Tamiami

Ready to Start Your Vanities, Tile & Fixtures Project in Tamiami?

Call (844) 665-0162 for a free on-site estimate. We’ll measure your space, assess existing conditions, and walk through material options from our curated brand roster. Most Tamiami homeowners have a written estimate within 48 hours of our visit, with material samples to take home and compare.

Written by Raymond Estevez, Owner at Groundwork Construction Co., serving Tamiami and South Florida.

Why Tamiami Chooses Groundwork Construction Co. of South Florida

We set the standard for vanities, tile & fixtures in Tamiami.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Tamiami

Getting your vanities, tile & fixtures handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your vanities, tile & fixtures needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Tamiami - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local vanities, tile & fixtures pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Tamiami Customers Say

Trusted by homeowners across Tamiami and surrounding areas.

★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett · Verified customer
★★★★★

"The finished work is exactly what we wanted. It did run about three weeks over, mostly waiting on a cabinet delivery that was out of his hands, though I would have liked more updates during that stretch."

Dev Sharma · Verified customer
★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker · Verified customer

Ready for Vanities, Tile & Fixtures in Tamiami?

Call now for a free estimate - or request one below. Licensed, insured, and here with fast after-hours help in Tamiami.

(844) 665-0162

Request a Free Estimate in Tamiami

Tell us about your vanities, tile & fixtures needs - we'll respond within the hour.

When you send us your details, you agree to our Privacy Policy and authorize us to contact you through phone, text, or email concerning your request, including by the partner businesses that may perform the service.

Prefer to text? Send a Text
Areas We Serve
Call Now - 24/7 Dispatch