What Cabinets & Countertops Installation Costs and Involves in North Lauderdale
Cabinets & countertops replacement in North Lauderdale typically runs $6,000-$19,500 for a standard kitchen, with most projects completed in 5-10 business days once materials arrive. This job covers removing existing cabinetry and surfaces, installing new cabinet boxes and doors, templating and fitting countertops, reconnecting plumbing fixtures, and final trim. Call (844) 665-0162 for a free on-site estimate and measured quote.
How We Handle Cabinets & Countertops From First Measurement to Final Caulk
We’ve replaced cabinets and countertops in enough North Lauderdale kitchens to know where the surprises hide. Here’s the actual sequence, with what you’ll need to decide at each point.
Stage 1: Site measure and existing condition check (Day 1, 2-3 hours)
We arrive with laser measures and a checklist built for 1970s-1980s North Lauderdale homes. We verify wall squareness, check for settled slab floors that throw cabinet runs out of level, and locate the original aluminum wiring or galvanized plumbing that still lurks in many of these tract homes. You’ll decide: keep the existing layout or shift the sink, range, or island location. Moving anything with water, gas, or 220V behind it adds days and cost.
Stage 2: Material selection and order (Day 1-3, homeowner-driven timeline)
This is where the schedule stretches or compresses. Stock KraftMaid or Wellborn cabinets ship in 2-4 weeks. Semi-custom with modified heights, depths, or specialty finishes run 6-10 weeks. Countertops template only after base cabinets are set, so your stone or quartz lead time runs parallel. You’ll choose: cabinet construction (particleboard box versus plywood), door style and finish, countertop material and edge profile, and whether to add soft-close hardware, pull-out organizers, or under-cabinet lighting.
Stage 3: Demolition and rough prep (Day 4-5, 1-2 days)
We pull existing cabinets, countertops, sinks, and disposals. In North Lauderdale’s CBS construction, we often find the original cabinets were fastened directly to block walls with tapcon-style anchors into carbonated concrete that crumbles on removal. We repair those wall faces before hanging new boxes. You’ll need the water and power shut off that morning. We haul everything same-day.
Stage 4: Cabinet installation and countertop templating (Day 6-8, 2-3 days)
Base cabinets go in first, leveled on shims over any slab irregularities. Uppers follow, anchored to studs or block with appropriate fasteners. We template countertops only after cabinets are secured and verified square. For quartz or stone, that template goes to the fabricator; for solid surface or laminate, we may cut in place. You’ll do a walk-through to confirm door swings, drawer clearances, and appliance openings before we lock in the template.
Stage 5: Countertop install, plumbing reconnect, and finish (Day 9-12, 1-2 days)
Countertops arrive, we seam (if needed), install sinks and cooktops, reconnect water and drainage, and caulk all transitions. We test every valve, every drawer slide, every hinge. You sign off on a punch list. The whole job, from demolition to final wipe-down, rarely stretches past two weeks unless you’re waiting on back-ordered materials.
The Cabinet and Countertop Options You’ll Actually Choose Between
Most North Lauderdale homeowners freeze at the showroom. These are the real decisions, with the trade-offs nobody puts on the display tags:
- Stock versus semi-custom versus custom cabinets: Stock boxes (KraftMaid, Wellborn) come in 3-inch width increments and standard heights. They fit most 1970s ranch kitchens without modification and cost the least. Semi-custom lets you adjust heights, depths, and add decorative elements. Custom is rarely necessary unless you’re matching existing millwork in a modified floor plan. The price gap between stock and semi-custom often runs 40-60%.
- Particleboard box versus plywood box: Particleboard with thermofoil or laminate facing is standard, stable, and fine for dry kitchens. Plywood boxes resist the humidity spikes that hit North Lauderdale homes when AC cycles off during summer storms or hurricane outages. If your kitchen has had past leaks or sits on the slab without a moisture barrier, plywood is worth the upcharge.
- Quartz versus granite versus solid surface: Engineered quartz (Cambria, Silestone, Caesarstone) is non-porous, consistent in pattern, and needs no sealing. Granite carries natural variation and requires annual resealing but handles heat better. Solid surface (Corian-type) repairs seamlessly but scratches more easily and limits you to matte finishes. In North Lauderdale’s hard-water environment, quartz’s stain resistance usually wins for busy households.
- Undermount versus drop-in sink: Undermount with quartz or granite gives you a clean wipe into the basin. It requires solid surface counters and precise cutouts. Drop-in works with any counter and costs less to install, but the rim collects grime. If you’re keeping existing plumbing locations, either works. Moving the sink location forces a decision: extend the undermount to the new spot or simplify with drop-in.
- Standard overlay versus full-overlay versus inset doors: Standard overlay leaves visible face-frame between doors. Full-overlay covers nearly the entire frame for a sleeker, more European look. Inset sits flush inside the frame, the most refined and the most expensive, requiring precise humidity-stable construction. North Lauderdale’s humidity swings make inset a riskier choice unless you spec plywood boxes and stable hinges.
What Cabinets & Countertops Costs in North Lauderdale, FL
| Component | Typical Range |
|---|---|
| Cabinet Installation (full kitchen) | $4,000-$13,000 |
| Countertop Installation | $2,000-$6,500 |
| Combined Cabinets & Countertops | $6,000-$19,500 |
Five factors push your number within that range:
Kitchen size and cabinet count: A compact 8-foot galley kitchen in a 1970s North Lauderdale ranch might need only 10-12 cabinets. A U-shaped kitchen with pantry run and island pushes past 25 boxes. Linear footage drives material cost more than any other variable.
Existing condition and demo complexity: Original cabinets fastened into crumbling block, water-damaged subfloors from old dishwasher leaks, or aluminum wiring that needs updating before reconnection - each adds labor hours we can’t predict until demolition.
Layout changes versus keep-in-place: Keeping your sink, range, and refrigerator in existing locations avoids plumbing, gas, and electrical relocation. Moving any of these typically adds $800-$2,500 per utility, plus potential slab cutting if drain lines need rerouting in the concrete floor.
Material grade and brand tier: Stock laminate counters and entry-level cabinets land at the low end. Quartz from Cambria or Silestone with semi-custom plywood boxes and soft-close hardware pushes toward the top. The brand matters less than the construction and the stone thickness - 2cm versus 3cm quartz changes both price and edge profile options.
Permit scope and inspection timing: Broward County requires permits for cabinet and countertop replacement only when plumbing or electrical is relocated or when the job is part of a larger renovation. A straight swap with no utility changes often skips permitting. We handle all submissions and inspections when required, built into our estimate.
Our written estimates include demolition, haul-away, cabinet and countertop supply and install, sink and faucet reconnection, and basic trim. They do not include appliance replacement, flooring repair, or plumbing/electrical upgrades beyond standard reconnection. Call (844) 665-0162 for an exact quote - estimates are free.
What North Lauderdale’s Housing Stock Means for Your Cabinet and Countertop Job
North Lauderdale was essentially built out in a single development wave during the 1970s-1980s, meaning virtually the entire city’s housing stock predates the sweeping post-Hurricane Andrew Florida Building Code overhaul. That matters for cabinets and countertops in ways most homeowners don’t expect until we’re standing in their kitchen.
These CBS ranch homes on North Lauderdale‘s flat coastal plain share identical construction DNA: slab-on-grade floors that settle unevenly over decades, block walls with carbonated concrete that crumbles when we drill for new cabinet anchors, and original aluminum-frame windows that concentrate condensation on exterior walls. We’ve pulled cabinets in Tamarac Village and Hampton Hills only to find the rear face frames were rotted from years of trapped humidity against the block. The fix isn’t just new boxes - it’s adding proper standoffs, sealant, and sometimes a vapor barrier behind the sink base.
Because any permitted project here triggers Broward County’s current wind-load and opening-protection requirements, homeowners doing Kitchen Remodeling in North Lauderdale as a broader project often discover their windows must be upgraded to impact-rated units mid-job. That doesn’t directly affect cabinet installation, but it changes the sequencing: windows before cabinets, always, or you’re removing what you just installed. Our Kitchen Remodeling crew coordinates this so you’re not paying for touch-ups.
The high water table and summer storm pattern mean we schedule countertop templating and install with weather buffers. A power outage during fabrication stops CNC machines; a flooded street delays delivery. We’ve learned to pad North Lauderdale timelines by a few days in August and September.
Homeowners in this market often pair kitchen updates with bathroom work. If you’re considering a full wet-area renovation, our Walk-In Showers & Shower Remodeling in North Lauderdale or Tub-to-Shower Conversion in North Lauderdale crews can sequence alongside the kitchen team, one accountable contractor handling both.
Serving North Lauderdale, FL - Our Local Coverage Area
We’re based in the North Lauderdale area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
Frequently Asked - Cabinets & Countertops in North Lauderdale
Most North Lauderdale kitchens take 5-10 business days from demolition to final walk-through, plus 2-10 weeks for material lead time depending on cabinet and stone selection. Call (844) 665-0162 for an exact timeline based on your material choices - estimates are free.
You need a Broward County permit only if you’re relocating plumbing, electrical, or gas lines, or if the work is part of a larger permitted renovation. A straight cabinet and countertop swap with no utility changes typically does not require permitting. We verify your specific scope and handle all submissions when required.
Yes, and it’s the most cost-effective approach for most North Lauderdale homeowners. Keeping existing utility locations avoids plumbing and electrical relocation costs, preserves your slab integrity, and eliminates the permit trigger. We measure to ensure your new cabinets and counters accept your existing or planned appliance dimensions.
Expect $6,000-$19,500 for combined cabinet and countertop replacement, with most jobs landing in the $9,000-$14,000 range for stock to entry-semi-custom materials. The number moves with kitchen size, material grade, and whether you’re keeping or relocating utilities. Call (844) 665-0162 for a measured, written quote - estimates are free.
Our installation workmanship is warranted for one year. Cabinet manufacturers (KraftMaid, Wellborn) carry their own limited lifetime warranties on defects. Quartz and stone warranties vary by brand - Cambria, Silestone, and Caesarstone each offer residential coverage against manufacturing defects, typically 10 years to lifetime depending on product line. We provide all warranty documentation at final walk-through.
Ready to Replace Your Cabinets & Countertops in North Lauderdale?
We’ll walk your kitchen, measure precisely, and deliver a written estimate with material options across multiple price tiers - no deposit required to review. Call (844) 665-0162 or request an appointment online. Raymond Estevez or a senior member of our team will handle your consultation personally.
Written by Raymond Estevez, Owner at Groundwork Construction Co., serving North Lauderdale since our South Florida founding.