How Much Do Cabinets & Countertops Cost in Margate, FL?
Cabinets & countertops in Margate, FL typically run $6,000-$19,500 for a standard kitchen, with most projects wrapping in 2-3 weeks from demolition to final walkthrough. That range covers new cabinet boxes, door-and-drawer fronts, hardware, countertop fabrication and install, plus basic plumbing reconnect for your sink and faucet. Call (844) 665-0162 and we’ll measure your space, confirm your layout, and give you a written estimate with line-item pricing - no deposit required to start that conversation.
We’re talking about one of the most visible, highest-use parts of any kitchen. The cabinets set your storage logic and sight lines. The countertop is your actual work surface. Get either wrong and you’ll notice it every single day. Here’s how we approach cabinets & countertops as a standalone project, or as part of a full Kitchen Remodeling in Margate if you’re expanding scope.
How We Handle Cabinets & Countertops - Start to Finish
Every cabinets & countertops job in Margate follows a five-stage sequence. Knowing the timeline helps you plan around the disruption, and knowing when decisions lock in keeps the project moving.
Stage 1: Measure and templating (Day 1)
We arrive with laser measures and a checklist. We record every wall plane, note where your walls are out of plumb (common in 1970s CBS construction), locate studs, and mark existing plumbing and electrical. You’ll decide now on cabinet configuration - base cabinet count, wall cabinet height, whether you want a pantry pullout or appliance garage. This visit takes 2-3 hours. We photograph everything and send you a dimensional sketch within 24 hours.
Stage 2: Material selection and order (Days 2-14)
You’ll visit our showroom or we bring samples to you. This is where you choose door style, finish, box construction, and countertop material. For cabinets, you’ll pick between framed and frameless construction, and between plywood-box and furniture-board options. For countertops, you’ll select from quartz, granite, or solid surface, with thickness and edge profile. We place the cabinet order once you sign off; lead times run 2-10 weeks depending on manufacturer and customization level. Countertops get templated after cabinets are installed, so that order goes in later.
Stage 3: Demolition and prep (Days 15-16)
We remove existing cabinets, countertops, and backsplash if it’s being replaced. We protect your floors and adjacent rooms. Then we inspect what the old cabinets hid: wall condition, plumbing rough-in health, electrical box capacity. In Margate’s 1965-1978 housing stock, we regularly find galvanized supply lines, ungrounded outlets, or interior block walls that aren’t perfectly flat. If any of this needs addressing, we flag it now with a change order before cabinets go in.
Stage 4: Cabinet installation (Days 17-19)
Base cabinets go in first, leveled on shims because slab-on-grade floors in this era often have minor settlement. Wall cabinets follow, anchored to block or furring strips as needed. We install drawer glides, door hinges, and hardware. You’ll do a walkthrough to confirm door alignment, drawer action, and interior fittings. Adjustments happen now, before countertops are templated.
Stage 5: Countertop templating, fabrication, and install (Days 20-21)
Our fabricator visits with a digital template, accounting for your sink and cooktop cutouts. Fabrication takes 5-10 business days. Install day involves seaming (if needed), securing to cabinets, and reconnecting plumbing. We seal natural stone; quartz arrives pre-sealed. Final cleanup and your sign-off complete the job.
The Cabinet and Countertop Choices You’ll Actually Make
Most homeowners in Margate underestimate how many decisions sit inside this single project. Here’s the honest breakdown of what moves the needle:
- Framed vs. frameless cabinets: Framed (KraftMaid, Wellborn) have a face frame that adds rigidity and a traditional reveal between doors. Frameless (European-style) give you slightly more interior space and a cleaner, flush look. Framed tolerates wall irregularity better - relevant in older CBS homes where walls aren’t always true.
- Plywood box vs. furniture board: Plywood resists moisture and holds screws better long-term. Furniture board (particleboard with melamine) costs less and performs fine in dry upper cabinets, but we don’t recommend it under sinks or near dishwashers. The price gap is roughly 15-25% of cabinet cost.
- Door style and finish: Shaker remains the most requested profile in South Florida - clean, transitional, resale-safe. Raised panel reads traditional. Slab (flat) is modern but shows every fingerprint. Painted finishes cost more than stained and can chip at edges over time; they’re also harder to touch up.
- Quartz vs. granite vs. solid surface: Quartz (Cambria, Silestone, Caesarstone) is non-porous, consistent in pattern, and needs no sealing. Granite carries natural variation, requires annual sealing, and can stain if neglected. Solid surface (Corian) is repairable and seamless but softer, so it scratches more easily. For active kitchens, we steer most Margate homeowners toward quartz.
- Edge profile and thickness: Eased edge is standard. Bevel, ogee, or waterfall edges add fabrication cost. Thickness is typically 2 cm or 3 cm; 3 cm looks more substantial and needs less substrate support, but adds $8-$15 per square foot.
- Hardware grade: Soft-close hinges and full-extension drawer glides aren’t luxury anymore - they’re baseline. But hardware finish (brushed nickel, matte black, brass) is pure preference. We source from Blum and Salice; cheap hardware fails in 3-5 years in humid South Florida.
What Cabinets & Countertops Costs in Margate, FL
| Component | Typical Range |
|---|---|
| Cabinet Installation | $4,000-$13,000 |
| Countertop Installation | $2,000-$6,500 |
| Combined Cabinets & Countertops | $6,000-$19,500 |
Five factors push you toward the high or low end of that combined range:
Kitchen size and layout complexity. A straight 8-foot galley with 10 cabinets is at the bottom. An L-shape with island, 25+ cabinets, and a pantry wall pushes toward the top. Every corner cabinet, lazy susan, and appliance panel adds cost.
Existing condition and hidden work. If we open your walls and find galvanized plumbing that won’t accept modern fittings, or electrical that needs GFCI updates, that’s additional trade work. In Margate’s 50-year-old stock, we budget 10-15% contingency for this specifically.
Plumbing or electrical relocation. Keeping your sink and cooktop in place saves roughly $800-$2,500. Moving either means new supply lines, drain routing, and possibly panel upgrades - common in homes with original 100-amp service.
Material grade and brand tier. Entry-level framed cabinets with laminate countertops can land near $6,000. Custom inset doors with quartz waterfall edges and integrated appliance panels can exceed $30,000. Our Kitchen Remodeling crew works across that full spectrum.
Permit scope and inspection cycles. In Broward County, any electrical or plumbing modification triggers permit and inspection. We handle this in our project management, but the fees and inspection scheduling add calendar days and roughly $300-$800 to your total.
Our written estimates itemize cabinets, countertops, hardware, demolition, disposal, plumbing reconnect, permit fees, and project management. What typically isn’t included: appliance purchase, flooring replacement, backsplash tile, and any structural or HVAC work discovered during demo.
What Margate’s Older Housing Stock Means for This Job
Margate was built out almost entirely between the late 1960s and mid-1970s as dense, affordable tract housing in inland Broward County. That means our cabinets & countertops work here isn’t about dressing up new construction - it’s about retrofitting 50-year-old CBS homes where the original cabinets were basic builder-grade and the countertops were laminate or early solid surface that’s now delaminating.
Because these planned communities went up in bulk using near-identical floor plans, a contractor who learns the quirks of one 1970s CBS ranch here essentially knows the structural blueprint for hundreds nearby. We know which neighborhoods along Rock Island Road and University Drive have the undersized electrical panels. We know which villa complexes have the hollow-core interior block that won’t hold standard cabinet screws without toggle anchors. We know the tie-beam heights that determine whether you can run stacked cabinets to the ceiling.
Broward County’s post-Hurricane Andrew building code also shapes every project. Nearly any structural alteration on these aging homes triggers a full permit cycle with wind-load compliance inspections. If your cabinets & countertops project involves moving a wall or expanding a window opening above the sink, that permitting adds timeline and cost that wouldn’t apply in jurisdictions with lighter oversight. We’re familiar with the Broward County Permitting process and coordinate inspections so you’re not chasing callbacks.
Many Margate homeowners doing cabinets & countertops also update other spaces. We often see this work paired with a Walk-In Showers & Shower Remodeling in Margate or a Tub-to-Shower Conversion in Margate as part of a broader refresh.
Serving Margate, FL - Our Local Coverage Area
We’re based in the Margate area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
Frequently Asked - Cabinets & Countertops in Margate
From signed contract to final walkthrough, most cabinets & countertops jobs in Margate take 2-3 weeks of active construction, plus 2-10 weeks of cabinet lead time depending on manufacturer. We schedule demolition only after cabinets are in hand, so you’re never without a kitchen longer than necessary. Call (844) 665-0162 and we can check current lead times for your preferred brand.
Yes, if your project involves any electrical outlet relocation, lighting changes, or plumbing modifications - which nearly all do. Broward County requires permits for this work, and we pull them as part of our standard process. Pure cabinet swap with no utility changes technically doesn’t require permitting, but we still recommend it for resale documentation. We handle all paperwork and inspection scheduling.
Absolutely, and that’s the most common cabinets & countertops scope in Margate. Keeping your sink, dishwasher, and cooktop in their existing locations avoids plumbing and electrical costs, keeps permitting simpler, and typically saves $800-$2,500. We measure to ensure new cabinet depths and heights work with your existing rough-ins.
Installed quartz runs roughly $75-$150 per square foot; granite ranges $60-$140 depending on stone rarity. Quartz costs more at the entry level but needs no sealing, so lifetime cost often equals out. Granite’s natural variation appeals to some homeowners; quartz’s consistency and stain resistance wins in busy kitchens. We stock samples from Cambria, Silestone, and Caesarstone for side-by-side comparison.
Cabinet manufacturers typically warranty boxes and hardware for 5 years to lifetime, depending on tier. Countertop fabricators warranty installation and seams for 1 year; material warranties vary by brand (Cambria offers lifetime residential, others range 10-25 years). Our workmanship is covered for 1 year on installation-specific issues. We provide all warranty documents at project closeout.
Get Your Margate Cabinets & Countertops Estimate
We’ll come to your home in Margate, measure your kitchen, review your existing conditions, and build a written estimate with real numbers for your specific cabinets & countertops choices. No pressure, no deposit to get the quote. Call (844) 665-0162 or reach out through our site to schedule. Raymond Estevez and our team will walk you through material options, timeline, and what to expect if your 1970s home has the usual surprises hiding behind those original cabinets.
Written by Raymond Estevez, Owner at Groundwork Construction Co., serving Margate and Broward County homeowners since our founding.