A Groundwork company - serving Fort Lauderdale, FL
Small & Partial Kitchen Remodels in Kings Point, FL | Groundwork Construction Co. of South Florida

Small & Partial Kitchen Remodels in Kings Point - Written Fixed Price, Finish Date in the Contract

Free in-home design consult and a written, line-item quote before demo starts. The price we sign is the price you pay, with a finish date in the contract. Licensed, insured, permits handled.

Call to schedule your free estimate

23+
Years in Business
144+
Cities Served
Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Small & Partial Kitchen Remodels in Kings Point, FL: What to Expect

Small and partial kitchen remodels in Kings Point typically run $9,000-$20,000 and take 3-6 weeks from HOA approval to final walkthrough. Most projects keep the existing footprint, replace cabinets and countertops, update lighting, and refresh backsplashes without touching plumbing locations or load-bearing walls. Call (844) 665-0162 for a free on-site estimate - we measure, photograph, and price the job in one visit.

Call (844) 665-0162

How We Handle Small & Partial Kitchen Remodels Step by Step

Every Kings Point kitchen project moves through five stages. Because this is a 55+ condo and villa community with shared walls and strict association rules, the sequence here differs from single-family work in Delray Beach or Boca Raton.

Stage 1: HOA Package & Neighbor Notification (1-2 weeks)

We prepare your association submittal before anything else. Kings Point requires contractor insurance certificates, detailed scope drawings, material samples, and written neighbor notification for any work involving electrical, plumbing, or shared walls. We’ve submitted dozens of these packages. You’ll sign the neighbor forms; we handle the technical documents and schedule the association review meeting.

Stage 2: Demolition & Discovery (2-3 days)

Cabinets, countertops, and old backsplash come out. In Kings Point’s 1970s-early 1980s CBS construction, this is when we find the surprises: galvanized plumbing still in place, Federal Pacific or Zinsco electrical panels that no longer meet code, or concrete block walls with no stud cavity for recessed lighting. We photograph everything and present options before proceeding. You decide here whether to upgrade the panel or reroute plumbing - this choice affects both timeline and final price.

Stage 3: Rough Work & Inspections (1-2 weeks)

Electrical, plumbing, and any structural modifications happen now. Palm Beach County inspectors check rough electrical and plumbing before we close walls. Because Kings Point units share walls, we coordinate quiet-hours scheduling - typically 8 a.m. to 4 p.m. weekdays - and notify adjacent owners of any shutoff requirements. If your project triggers Florida’s post-Andrew wind code compliance review, we handle the structural upgrade documentation then.

Stage 4: Cabinet & Countertop Installation (1-2 weeks)

Cabinets go in first, leveled on Kings Point’s original concrete slab floors, which are rarely perfectly flat. Countertop templating follows. For partial remodels, we often work with existing appliance locations, so the critical decision here is whether your current refrigerator depth and range width match standard new cabinetry or require custom panels. We template, you approve the seam placement and edge profile, and fabrication takes 7-10 business days.

Stage 5: Finish Work & Final Walkthrough (3-5 days)

Backsplash, pendant lighting, hardware, and trim. We run every outlet, test every valve, and check that cabinet doors clear your existing tile or flooring. The Palm Beach County final inspection closes the permit. We leave you with care instructions, manufacturer warranties, and our own workmanship guarantee.

The Material Choices That Shape Your Partial Kitchen Remodel

Small and partial kitchen remodels in Kings Point force honest trade-offs. The footprint is fixed, so every dollar shows. Here are the decisions that matter most:

  • Stock vs. semi-custom cabinetry: Stock cabinets from KraftMaid or Wellborn deliver in 2-3 weeks and cost roughly 40% less than semi-custom. Semi-custom lets you adjust depths and add pull-out organizers - worth it if you’re keeping cabinets for 15+ years in a retirement home. For Kings Point villas with galley kitchens, stock often fits fine because the runs are short and standard.
  • Laminate vs. solid surface countertops: High-pressure laminate runs $2,000-$3,500 installed for a typical Kings Point kitchen. Engineered quartz from Cambria starts around $4,500 and climbs with thickness and edge detail. Laminate holds up fine for seasonal residents; quartz resists the humidity-driven mold issues we see in closed-up Kings Point units during summer months.
  • Tile backsplash vs. full-height stone: A standard 4-inch granite backsplash costs least. Full-height ceramic or porcelain tile to the cabinets adds $800-$2,000 but protects drywall from the grease and moisture that accumulate in Florida kitchens with limited ventilation. We see more backsplash upgrades in Kings Point than in Boca Raton because the original 1970s kitchens rarely had adequate range hoods.
  • Keep or replace flooring: Partial remodels often leave flooring untouched. If your tile is sound but dated, we can install cabinets over it. If you replace, the new floor must meet current Florida Energy Code R-values, which may require insulation board underlayment - a hidden cost in slab-on-grade construction.
  • Lighting scope: Original Kings Point kitchens had single flush-mount fixtures. Adding recessed cans, under-cabinet LED, and pendant wiring over islands requires new home runs from the panel - feasible, but it pushes the job from “partial” toward “gut” pricing.

What Small & Partial Kitchen Remodels Cost in Kings Point, FL

Small and partial kitchen remodels in Kings Point range from $9,000 to $20,000. Most projects we price fall between $12,000 and $16,000.

Component Typical Range
Cabinet installation $4,000-$13,000
Countertop installation $2,000-$6,500
Backsplash installation $800-$2,500
Kitchen island installation $3,000-$10,000

Five variables push your number up or down:

Existing condition. Original 1970s kitchens with galvanized plumbing or Zinsco panels add $1,500-$4,000 for code-mandated upgrades.

Plumbing relocation. Keeping sink and range where they are saves roughly $2,000-$3,500 versus moving drains and vents in concrete slab construction.

Material grade. Stock cabinetry and laminate countertops land at the low end. Semi-custom with quartz and full-height backsplash pushes toward $18,000-$20,000.

Permit scope. Electrical-only permits run $200-$400 in Palm Beach County. Full mechanical, electrical, and plumbing permits with structural review climb past $800 and extend the HOA approval timeline.

Neighbor coordination costs. Shared-wall work in Kings Point sometimes requires after-hours protection, dust containment, or temporary water shutoff coordination - not major, but real.

Our written estimates itemize labor, materials, permits, and a contingency line for discovery. They do not include appliance replacement, flooring beyond the cabinet footprint, or HOA application fees.

Why Kings Point Homes Change How We Approach This Job

Kings Point is not Delray Beach. The entire community is a 55+ association-governed enclave built between the mid-1970s and early 1980s, and that reality shapes every small and partial kitchen remodel we do here.

The housing stock is almost entirely CBS low-rise condos and single-story villas. Original kitchens were compact, with 7-foot ceilings in some condo buildings and galley layouts designed for efficiency, not entertaining. We’ve learned to measure twice for cabinet heights because that 84-inch standard doesn’t always clear soffits that hide original HVAC ductwork.

Because unit walls are shared, any electrical or plumbing work triggers neighbor notification requirements. We’ve had projects delayed two weeks because an adjacent snowbird was unreachable in Michigan. We build that possibility into our Kings Point timelines - and we keep seasonal residents’ contact preferences on file.

The climate matters too. Palm Beach County’s summer humidity and hurricane exposure mean closed-up units develop mold behind cabinets faster than occupied homes. We spec moisture-resistant drywall and recommend quartz over porous natural stone for countertops in seasonal-use kitchens. When a partial remodel triggers current code compliance, we’ve seen inspectors require hurricane strap verification or impact-rated window confirmation - not always, but often enough that we check the building’s original wind code certification before quoting.

And the association process is non-negotiable. Contractors who try to start demo before HOA approval get shut down. We submit complete packages with material samples, noise mitigation plans, and defined quiet hours. It’s slower than ungoverned work. It’s also why we’re still doing Kitchen Remodeling in Kings Point after years in this market.

Homeowners here often pair kitchen updates with Small Bathroom Remodels in Kings Point or exterior work like Roof Repair in Kings Point to consolidate HOA approvals and minimize disruption.

Serving Kings Point, FL - Our Local Coverage Area

We’re based in the Kings Point area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

Frequently Asked - Small & Partial Kitchen Remodels in Kings Point

Get Your Free Estimate for Small & Partial Kitchen Remodels in Kings Point

Call (844) 665-0162 to schedule a free on-site estimate. Raymond Estevez or a member of our Kitchen Remodeling crew will measure your kitchen, photograph existing conditions, and deliver an itemized written quote within 48 hours. We handle the HOA package, permits, and neighbor coordination - you choose the materials, we manage the build.

Written by Raymond Estevez, Owner at Groundwork Construction Co., serving Kings Point and South Florida.

Why Kings Point Chooses Groundwork Construction Co. of South Florida

We set the standard for small & partial kitchen remodels in Kings Point.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Kings Point

Getting your small & partial kitchen remodels handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your small & partial kitchen remodels needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Kings Point - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local small & partial kitchen remodels pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Kings Point Customers Say

Trusted by homeowners across Kings Point and surrounding areas.

★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo · Verified customer
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan · Verified customer
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett · Verified customer

Ready for Small & Partial Kitchen Remodels in Kings Point?

Call now for a free estimate - or request one below. Licensed, insured, and here with fast after-hours help in Kings Point.

(844) 665-0162

Request a Free Estimate in Kings Point

Tell us about your small & partial kitchen remodels needs - we'll respond within the hour.

When you send us your details, you agree to our Privacy Policy and authorize us to contact you through phone, text, or email concerning your request, including by the partner businesses that may perform the service.

Prefer to text? Send a Text
Areas We Serve
Call Now - 24/7 Dispatch