Fast, Reliable Kitchen Remodeling Across Kings Point
Kitchen remodeling in Kings Point, FL typically runs $14,000-$45,000 for a full renovation, with most projects requiring 6-12 weeks once HOA approval is secured. We’re Groundwork Construction Co. of South Florida, and we handle the full process: design, permitting, HOA package submission, and build. Call us at (844) 665-0162 for a free estimate.
We know Kings Point well. The 33484 community’s mix of 1970s-era condos and villas presents specific challenges most contractors underestimate. Shared walls, aging infrastructure, and strict HOA oversight mean a kitchen remodel here isn’t like one in Delray Beach or Boca Raton. We’ve worked with the Kings Point association enough to understand their approval timelines, their quiet-hours rules, and the wind-code upgrades that catch homeowners off guard.
Why Groundwork Construction Co. of South Florida Is Kings Point’s Preferred Kitchen Remodeling Company
We’ve completed multiple kitchen remodels within Kings Point’s gates, and we’ve learned that local reputation here spreads fast in the community’s tight-knit resident network. Our Kitchen Remodeling team doesn’t just show up with a truck and tools; we arrive with pre-filed HOA documentation, neighbor notification letters, and a schedule built around the community’s 10 a.m.-4 p.m. construction window.
Response time matters in a 55+ community where residents plan around medical appointments, family visits, and seasonal travel. We typically schedule Kings Point consultations within 48 hours of your call, and we keep a dedicated project manager assigned from first measurement through final walkthrough. No handoffs to subcontractors you’ve never met.
Our familiarity with Kings Point’s specific building stock saves weeks. We know which villa clusters still carry Federal Pacific electrical panels, where galvanized plumbing transitions to CPVC, and which original sliding glass doors will fail a modern wind-load inspection. That knowledge prevents the mid-project surprises that derail timelines and inflate budgets.
Our Kitchen Remodeling Services in Kings Point
Full Kitchen Remodeling
A full kitchen remodel in Kings Point starts with understanding what the 1970s-early 1980s construction will reveal once we open walls. We’ve replaced kitchens in CBS condos where the original built-up roof had leaked silently into wall cavities for years, and in villas where the concrete block construction meant every plumbing relocation required a diamond-core drill and careful dust containment. Our full remodels include structural assessment, code compliance review, and coordination with the Kings Point HOA for any exterior modifications triggered by the work.

Cabinets & Countertops
Kings Point residents upgrading from 40-year-old cabinetry deserve real choice, not whatever a contractor has in stock. We install KraftMaid and Wellborn cabinet lines across multiple price tiers, paired with Cambria, Silestone, or Caesarstone quartz countertops. In a recent villa project near the Kings Point main boulevard, we replaced water-damaged particleboard cabinets with KraftMaid semi-custom units and Cambria quartz-then handled the HOA-mandated impact door upgrade without adding weeks to the schedule.

Kitchen Island Installation
Adding an island to a Kings Point kitchen means checking floor load capacity in CBS construction and verifying electrical routing through shared slab or ceiling plenums. Our island installations run $3,000-$10,000 depending on size, electrical requirements, and countertop material. We handle the HOA notification for any work affecting adjacent units, which is mandatory here and often overlooked by outside contractors.

Backsplash, Tile & Flooring
Florida’s humidity and Kings Point’s aging slab construction make moisture management critical. We specify appropriate backer board, waterproofing membranes, and expansion joints for tile installations. Our flooring selections account for the height transitions common in 1970s condos, where original floors may have settled or previous owners layered multiple materials.

Kitchen Design & Layout
Design for Kings Point kitchens must account for fixed structural elements: concrete block walls that can’t be moved, plumbing stacks shared with upstairs or adjacent units, and electrical service that may need upgrading from 100-amp to 200-amp panels. Our designers create layouts that maximize function within these constraints, not pretty renderings that can’t be built.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Trusted Brands We Service in Kings Point
We don’t push proprietary products. You choose the brand, we handle the build. For Kings Point kitchen remodels, we regularly source Kohler and Moen fixtures, KraftMaid and Wellborn cabinetry, and Cambria, Silestone, or Caesarstone countertops. These aren’t special-order items for us; they’re standard inventory we specify weekly, which means faster lead times and no surprises when a homeowner selects a particular finish or edge profile. Because we also handle windows and doors, we can coordinate impact-rated door upgrades from Andersen, Pella, or Marvin without bringing in a separate contractor.
Common Kitchen Remodeling Problems We See in Kings Point Homes
- HOA approval delays from incomplete permit packages. Kings Point’s association requires detailed plans, contractor insurance certificates, and neighbor notification before any work begins. Contractors unfamiliar with this process submit generic documents and wait weeks for rejection and resubmission.
- Original aluminum sliding doors failing wind-load inspection. When a kitchen remodel triggers a permit review, the inspector or HOA will flag non-impact-rated doors and windows. Upgrading to impact-rated units adds $3,000-$8,000 but is non-negotiable for code compliance.
- Galvanized plumbing behind original cabinets. Many Kings Point units still have galvanized supply lines that corrode from the inside. We test pressure and flow before cabinet installation, because discovering a leak after everything is closed up means tearing out new work.
- Shared-wall electrical work without neighbor notification. Kings Point association rules require written notice to adjacent unit owners before any electrical or plumbing work affecting shared walls. Skipping this step creates disputes and mandatory work stoppages.
Pricing for Kitchen Remodeling in Kings Point, FL
Kings Point kitchen remodeling costs align with broader Palm Beach County pricing, with added considerations for HOA coordination and potential wind-code upgrades. Here’s what typical projects run:
| Service | Price Range in Kings Point |
|---|---|
| Kitchen Remodel (full) | $14,000-$45,000 |
| Small Kitchen Remodel | $9,000-$20,000 |
| Countertop Installation | $2,000-$6,500 |
| Kitchen Island Installation | $3,000-$10,000 |
What moves a project toward the higher end: impact-rated door or window upgrades triggered by permit review, electrical panel replacement, plumbing repiping, or custom cabinetry with specialized finishes. What keeps costs controlled: keeping the existing footprint, refacing rather than replacing cabinets, and selecting mid-tier quartz or solid-surface countertops. We provide itemized estimates before any HOA submission, so you know exactly what you’re approving. Call (844) 665-0162 for your free estimate.
We Also Serve Cities Near Kings Point
Our Kitchen Remodeling in Kings Point work extends throughout southern Palm Beach County. We regularly complete projects in Delray Beach, Boynton Beach, Boca Raton, and Boca Del Mar. Each city has distinct HOA landscapes and building ages, but our single-source approach-one contractor handling design, permitting, and construction-applies across every community we serve.
Serving Kings Point, FL - Our Local Coverage Area
We’re based in the Kings Point area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - Kitchen Remodeling in Kings Point
Yes, virtually every kitchen remodel in Kings Point requires HOA approval before work begins. The association reviews contractor insurance, project scope, and scheduling to ensure compliance with community rules. We prepare and submit the complete package as part of our standard process. Call (844) 665-0162 and we’ll walk you through exactly what’s needed for your specific building type.
It likely will if the remodel triggers a permit review, which most significant kitchen renovations do. Kings Point’s original aluminum sliding doors and single-pane windows don’t meet current Florida wind-load codes. We assess this during our initial consultation and include upgrade options in the estimate, so you’re not surprised mid-project.
Shared walls add 1-3 weeks to most Kings Point kitchen remodels compared to equivalent single-family work in Delray Beach. The association mandates written neighbor notification, defined quiet hours (typically 10 a.m.-4 p.m.), and sometimes pre-approval from adjacent unit owners for plumbing or electrical work. We build these requirements into every schedule we present.
We install KraftMaid and Wellborn cabinetry, and Cambria, Silestone, and Caesarstone countertops as standard options. For fixtures, we regularly specify Kohler and Moen. These are name-brand products with full manufacturer warranties, not contractor-grade alternatives. You select the tier and finish; we source and install.
Absolutely, and we often recommend bundling this work. In Kings Point, we recently completed a villa remodel where the HOA flagged the original aluminum slider during our mid-project inspection. We coordinated the impact-rated replacement with Kohler fixtures and kept the timeline intact by working within quiet hours. Combining door replacement with kitchen remodeling avoids duplicate permit fees and disruption. Call (844) 665-0162 to discuss whether your unit needs this upgrade.
Written by Raymond Estevez, Owner at Groundwork Construction Co., serving Kings Point and South Florida homeowners with full-scope residential construction since our founding.