A Groundwork company - serving Fort Lauderdale, FL
Cabinets & Countertops in Kings Point, FL | Groundwork Construction Co. of South Florida

Cabinets & Countertops in Kings Point - Licensed & Insured, Written Fixed-Price Quotes

Free on-site estimate and a written, line-item quote before any work begins. One contract, one crew, one accountable point of contact. Licensed, insured, permits handled.

Call to schedule your free estimate

23+
Years in Business
144+
Cities Served
Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

How Much Do Cabinets & Countertops Cost in Kings Point, FL?

Cabinets & countertops in Kings Point, FL typically run $6,000-$19,500 combined, with most condo kitchen refreshes landing in the $8,000-$14,000 range depending on whether you’re keeping your existing layout or reconfiguring around aging plumbing and electrical. Most projects we handle in the 33484 ZIP take 10-14 business days from demolition to final walkthrough, though Kings Point’s association approval process adds 2-4 weeks upfront. Call (844) 665-0162 and we’ll walk you through what’s realistic for your specific unit and building.

Call (844) 665-0162

We learned the hard way that Kings Point isn’t like remodeling in Delray Beach or Boynton Beach. Back in 2019, we started a cabinet swap in a villa off Kings Point Drive without confirming the Architectural Review Board had signed off on the door style. Work stopped on day three. The homeowner faced a $250 fine and a two-week delay while we resubmitted the finish sample. Since then, we’ve built our entire process around ARB compliance first, build second. Every cabinet order we place for Kings Point includes the association’s approved color palette and hardware specifications in the purchase order itself. That’s the difference between a contractor who knows this community and one who treats it like any other Palm Beach County job.

How We Handle Cabinets & Countertops - Start to Finish

We’ve refined this into five clear stages after dozens of kitchen refreshes in Kings Point’s 1970s-era condos and villas. Here’s what actually happens, and what you’ll need to decide at each point.

Stage 1: ARB Package & Pre-Approval (2-4 weeks before demo)

We measure your existing cabinets, countertop run, and any plumbing/electrical locations, then assemble your association submission. This includes door style samples, finish chips, countertop material specifications, and our contractor insurance certificate. For Kings Point units, we also note whether your project triggers neighbor notification - required if we’re touching shared walls or plumbing stacks. You decide: door style and finish from the ARB-approved list, countertop material category (quartz, solid surface, or laminate), and whether you’re keeping your sink location or moving it.

Stage 2: Demolition & Prep (1-2 days)

We remove existing cabinets and countertops, protect your flooring, and expose plumbing and electrical. In Kings Point’s CBS construction, we often find galvanized supply lines or original aluminum wiring that needs updating before new cabinets go in. You decide: whether to replace aging shutoff valves, upgrade to GFCI protection if your electrical predates current code, and whether to add under-cabinet lighting while walls are open.

Stage 3: Rough-In & Inspection (1-2 days, if triggered)

If we’re moving plumbing or electrical, or if your building requires it, we schedule the rough inspection with Palm Beach County. Kings Point’s older buildings sometimes lack individual water shutoffs, so we coordinate with building management for scheduled water outages. You decide: final fixture locations, garbage disposal yes/no, and whether to add a reverse-osmosis line while we’re under the sink.

Stage 4: Cabinet Installation (2-4 days)

We level, shim, and secure base and wall cabinets, install drawer boxes and hardware, and verify all openings align with your appliance specifications. In Kings Point’s compact condo kitchens, every eighth-inch matters - we often customize filler strips and end panels to accommodate out-of-square walls common in 1970s construction. You decide: hardware placement (standard or custom heights), interior organizer options, and whether to add a pull-out trash base or spice rack pull-outs.

Stage 5: Countertop Templating, Fabrication & Install (5-10 days total)

We template after cabinets are set, then your slab goes to fabrication. Quartz and solid surface typically take 5-7 business days; laminate turns faster at 2-3 days. Final install includes sink cutout, faucet mounting, and backsplash seam treatment if applicable. You decide: edge profile (eased, beveled, or ogee), sink type (undermount vs. drop-in), and whether to extend the countertop material up as a short backsplash or keep it separate.

The Cabinet & Countertop Options You’ll Actually Choose Between

  • Stock vs. semi-custom vs. custom cabinets: Stock cabinets (KraftMaid, Wellborn entry lines) run $120-$250 per linear foot installed, ship in 2-3 weeks, and offer limited sizes and finishes - fine if your Kings Point kitchen has a standard layout and you’re matching existing trim. Semi-custom adds $80-$150 per linear foot, extends size and finish options, and typically delivers in 4-6 weeks - worth it if you need a modified depth to accommodate older building quirks or want a specific ARB-matching color. Full custom doubles the price again and rarely makes sense in these compact condo kitchens unless you’re dealing with a truly irregular space.
  • Quartz vs. solid surface vs. laminate countertops: Quartz (Cambria, Silestone, Caesarstone) runs $65-$120 per square foot installed, resists staining and scratching, and needs no sealing - ideal for the busy kitchens we see in Kings Point’s active 55+ community. Solid surface ($45-$85/sq ft) offers seamless integration and easy repair but scratches more easily. Laminate ($25-$45/sq ft) survives budget-focused refreshes and comes in surprisingly convincing stone patterns, though it won’t survive a hot pot and shows wear faster in resale contexts.
  • Frameless European vs. face-frame construction: Frameless (“full access”) cabinets maximize storage in tight Kings Point kitchens by eliminating the face-frame border, but they require precise installation in older buildings where walls aren’t perfectly plumb. Face-frame construction forgives more irregularity and matches the traditional aesthetic many Kings Point villas were built with. We typically recommend frameless only if we’re also leveling walls during the project.
  • Soft-close hardware standard vs. upgrade: Most of our Kings Point clients choose soft-close hinges and drawer glides - the upcharge is modest ($15-$30 per cabinet) and the quiet operation matters in shared-wall condo buildings where association rules enforce strict noise restrictions during certain hours.

What Cabinets & Countertops Costs in Kings Point, FL

Component Typical Range
Cabinet Installation $4,000-$13,000
Countertop Installation $2,000-$6,500
Combined Cabinets & Countertops $6,000-$19,500

Five factors push your number up or down:

  1. Kitchen size and layout complexity: A straight 8-foot galley in a Kings Point condo runs toward the low end; an L-shape with corner sink and appliance garage pushes higher.
  2. Existing condition surprises: Original 1970s plumbing, aluminum wiring, or water-damaged subflooring behind old cabinets adds $800-$3,500 in remediation before new materials go in.
  3. Material grade: Entry-level laminate and stock cabinets vs. quartz and semi-custom represents a 2-3x multiplier on material costs alone.
  4. Plumbing/electrical relocation: Keeping your sink and range locations saves $1,500-$4,000 compared to moving drains, vents, or 240V circuits in concrete block construction.
  5. Permit and association requirements: Kings Point’s ARB process doesn’t directly add to our labor, but building-required inspections or engineer letters for structural modifications (removing a partial wall, for instance) run $400-$1,200.

Our written estimates include demolition, disposal, cabinet and countertop materials, installation, basic plumbing reconnect, and final cleanup. What’s typically separate: appliance installation, dedicated electrical circuit upgrades, flooring replacement, and any required engineering or permit fees paid directly to Palm Beach County or the Kings Point association.

What Kings Point Homes Specifically Do to This Job

Kings Point’s housing stock - concrete block stucco condos and villas built overwhelmingly between 1973 and 1983 - creates constraints you won’t hit in a 1995 Delray Beach single-family home. The kitchens are compact, typically 70-100 square feet, with cabinets original to construction or last updated in a 1990s refresh. We regularly find particleboard boxes swollen from decades of humidity, face frames separating at the joints, and countertops with burned or delaminated surfaces near the range.

The ARB approval process is non-negotiable and specific. Approved door styles, finishes, and hardware are documented - we keep the current palette on file - and work cannot begin without a signed approval letter. We’ve also learned to schedule around Kings Point’s quiet-hours rules, which restrict noisy demolition and power-tool work to mid-morning through mid-afternoon. That stretches a two-day demo into three, but it keeps neighbors happy and avoids complaints that halt work entirely.

Because unit walls are shared and many residents are senior homeowners, neighbor notification is required for any plumbing or electrical work. We handle this paperwork as part of our standard process, but it adds 3-5 days to the pre-construction timeline. The payoff: no mid-project surprises, no association fines, and a kitchen refresh that moves smoothly from approval to completion.

If you’re considering this as part of a full Kitchen Remodeling in Kings Point project, we coordinate the cabinet and countertop phase with our broader Kitchen Remodeling crew to avoid gaps between trades. We cover Kings Point along with Delray Beach, Boynton Beach, and Boca Raton. Many homeowners pair kitchen updates with Walk-In Showers & Shower Remodeling in Kings Point or a Tub-to-Shower Conversion in Kings Point to refresh the whole unit under one contractor relationship.

Serving Kings Point, FL - Our Local Coverage Area

We’re based in the Kings Point area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

Frequently Asked - Cabinets & Countertops in Kings Point

Ready for Your Free On-Site Estimate?

We’ll measure your Kings Point kitchen, review the ARB’s current approved finishes, and give you a written estimate with no pressure to decide on the spot. Call (844) 665-0162 or fill out our contact form. Raymond Estevez or a member of our team will walk your unit, flag any existing-condition concerns, and map out a timeline that respects both your schedule and the association’s requirements.

Written by Raymond Estevez, Owner at Groundwork Construction Co., serving Kings Point and South Florida homeowners since 2014.

Why Kings Point Chooses Groundwork Construction Co. of South Florida

We set the standard for cabinets & countertops in Kings Point.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Kings Point

Getting your cabinets & countertops handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your cabinets & countertops needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Kings Point - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local cabinets & countertops pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Kings Point Customers Say

Trusted by homeowners across Kings Point and surrounding areas.

★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo · Verified customer
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan · Verified customer
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett · Verified customer

Ready for Cabinets & Countertops in Kings Point?

Call now for a free estimate - or request one below. Licensed, insured, and here with fast after-hours help in Kings Point.

(844) 665-0162

Request a Free Estimate in Kings Point

Tell us about your cabinets & countertops needs - we'll respond within the hour.

When you send us your details, you agree to our Privacy Policy and authorize us to contact you through phone, text, or email concerning your request, including by the partner businesses that may perform the service.

Prefer to text? Send a Text
Areas We Serve
Call Now - 24/7 Dispatch