A Groundwork company - serving Fort Lauderdale, FL
Full Kitchen Remodeling in Hollywood, FL | Groundwork Construction Co. of South Florida

Full Kitchen Remodeling in Hollywood - Written Fixed Price, Finish Date in the Contract

Free in-home design consult and a written, line-item quote before demo starts. The price we sign is the price you pay, with a finish date in the contract. Licensed, insured, permits handled.

Call to schedule your free estimate

23+
Years in Business
144+
Cities Served
Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

How Much Does Full Kitchen Remodeling Cost in Hollywood, FL?

Full kitchen remodeling in Hollywood, FL typically runs $14,000-$45,000 and takes 4-8 weeks from permit approval to final inspection. Most homeowners in Hollywood’s 33027, 33029, 33081, and 33084 ZIP codes fall in the $22,000-$32,000 range for a complete gut renovation with mid-grade finishes and no structural changes. Call (844) 665-0162 for a free on-site estimate with itemized pricing.

Call (844) 665-0162

The Real Process: How We Handle a Full Kitchen Remodel in Hollywood

We’ve learned that homeowners worry most about the gap between “demo day” and “functional kitchen again.” Here’s exactly how that timeline breaks down.

Stage 1: Pre-construction and permitting (1-3 weeks)

We measure twice, produce CAD drawings, and submit to Broward County’s Building Division. In Hollywood, this is where the HVHZ factor hits: every window, door, or exterior-facing assembly in your remodel needs a Miami-Dade Notice of Acceptance (NOA) with HVHZ listing. We front-load this paperwork because we’ve seen contractors lose two weeks swapping out non-compliant products at the permit desk. You’ll decide final cabinet layouts, appliance specs, and electrical placement during this window.

Stage 2: Demolition and rough prep (3-5 days)

Cabinets, countertops, flooring, and appliances come out. For the 1950s-1970s CBS homes common in eastern Hollywood, we often uncover outdated electrical panels or aluminum wiring that needs upgrading before we can proceed. We test for asbestos in older drywall mud and flooring adhesives, a step newer contractors sometimes skip. You’ll confirm any last-minute electrical additions (pot lights, under-cabinet strips, island outlets) before walls close up.

Stage 3: Mechanical rough-in (1-2 weeks)

Licensed plumbers and electricians relocate or extend lines, install new circuits for appliances, and rough in gas if you’re switching to a gas cooktop. This is where your project timeline either holds steady or extends: moving a sink from one wall to another adds 3-5 days and $1,500-$4,000. Keeping existing plumbing locations saves both. We coordinate inspections here, and Broward’s inspectors typically book 2-3 days out for rough electrical and plumbing.

Stage 4: Cabinetry, countertops, and finish installation (2-3 weeks)

Cabinets go in first, then templating for countertops (Cambria, Silestone, or Caesarstone quartz typically needs 10-14 days fabrication after template). Backsplash follows once counters are set. For Hollywood’s seasonal residents, we schedule this stage around your calendar, not ours. We’ve completed installs for snowbirds who fly north mid-project and return to a finished kitchen.

Stage 5: Appliance hookup, final inspection, and punch list (2-3 days)

Final electrical and plumbing inspections, appliance installation, and our walkthrough. We don’t consider a project closed until every drawer glide is smooth and every caulk line is clean.

The Choices That Shape Your Full Kitchen Remodeling Project

Every full kitchen remodel in Hollywood forces a series of either/or decisions. These are the ones that matter most:

  • Cabinet construction: Stock boxes from KraftMaid or Wellborn run $4,000-$8,000 installed and deliver in 2-4 weeks. Semi-custom with modified heights, depths, and interior organizers pushes to $8,000-$13,000 and 6-8 weeks. Full custom millwork exceeds this range and extends timeline significantly. For Hollywood’s investment-minded homeowners, semi-custom typically wins.
  • Countertop material: Engineered quartz (Cambria, Silestone, Caesarstone) runs $65-$120 per square foot installed, resists staining, and needs no sealing. Natural granite or marble costs similar to premium quartz but demands annual maintenance. Butcher block warps in South Florida’s humidity without religious oiling. We steer most Hollywood clients toward quartz for durability in air-conditioned homes that still see coastal humidity.
  • Appliance tier: Builder-grade packages (Whirlpool, Frigidaire) start around $3,500. Professional lines (Wolf, Thermador, Viking) start at $12,000 and climb fast. The honest trade-off: if you cook daily, the burner control and oven consistency matter. If you reheat and entertain occasionally, mid-grade performs fine.
  • Plumbing relocation: Keeping your sink, dishwasher, and refrigerator in existing locations saves $1,500-$4,000 and a week of work. Moving any of them requires opening walls or slabs, extending supply and drain lines, and additional inspections. We map this decision to your actual cooking habits, not an abstract “ideal layout.”
  • Flooring continuity: Extending new tile or luxury vinyl into adjacent living spaces creates visual flow but adds material and labor cost. Stopping at the kitchen threshold saves money but can feel like a patch. In Hollywood’s open-concept 1980s-2000s tract homes, continuous flooring usually wins. In older, compartmentalized layouts, a defined kitchen zone works fine.

What Full Kitchen Remodeling Costs in Hollywood, FL

Project Element Typical Range
Full kitchen remodel (complete gut) $14,000-$45,000
Small kitchen remodel (under 100 sq ft) $9,000-$20,000
Cabinet installation only $4,000-$13,000
Countertop installation only $2,000-$6,500
Backsplash installation $800-$2,500
Kitchen island installation $3,000-$10,000

Five factors push your number up or down:

1. Kitchen size and existing condition. A 120-square-foot galley in a 1960s Hollywood duplex with aluminum wiring and a Federal Pacific panel starts higher than a 200-square-foot kitchen in a 1995 home with updated electrical. Remediation is real money.

2. Structural or plumbing relocation. Moving a load-bearing wall to open to the living room adds $3,000-$8,000 for engineering, permits, and beam installation. Moving the sink across the room adds plumbing rough-in and concrete cutting if you’re on slab.

3. Material grade and brand tier. KraftMaid’s standard painted maple versus their cherry with full-overlay doors and soft-close hardware can double the cabinet line item. Same footprint, different investment.

4. Permit scope and HVHZ compliance. Any exterior modification, window replacement, or structural work triggers additional Broward County inspections and Miami-Dade NOA documentation. Pure interior gut-and-replace with no structural changes stays simpler.

5. Seasonal timing and contractor availability. South Florida’s dry season (November-April) books fastest. Starting in May or June can sometimes yield better crew availability, though hurricane-season material deliveries get less predictable.

A written estimate from us includes demolition, disposal, all materials, labor, permits, and inspections. It does not include appliance costs (you purchase separately or we source at cost-plus), temporary kitchen setup, or unforeseen conditions like hidden water damage or asbestos abatement, which we quote separately after discovery.

What Hollywood’s Homes and Rules Do to This Job

Hollywood’s split personality as a city shapes every full kitchen remodel we take on here. East of I-95, in ZIPs like 33020 and 33021, we’re working inside 1950s-1970s concrete block and stucco homes built for the Northeast snowbird market. These kitchens are small, compartmentalized, and often still running original galvanized plumbing and cloth-wrapped wiring. A full remodel here is as much remediation as renovation: upgrading the electrical panel to 200-amp service, replacing corroded cast-iron drain lines, and sometimes sistering rafters that weren’t designed for modern ceiling loads.

West Hollywood, in 33024 through 33029, the housing stock shifts to 1980s-2000s planned communities with more open plans and current framing. Full kitchen remodeling here tends toward cosmetic transformation and layout optimization rather than infrastructure overhaul. The permitting is still Broward County, still HVHZ-compliant if any exterior element changes, but the starting point is cleaner.

The coastal strip along A1A and the barrier island adds another layer. Salt air corrodes hardware faster than inland homeowners expect. We specify 316 stainless or marine-grade fasteners for any exterior-adjacent work, and we account for the Coastal Construction Control Line setback rules that can trigger DEP permits if your kitchen remodel touches any exterior envelope. Contractors unfamiliar with Hollywood’s dual mainland/island geography miss this routinely.

Homeowners in communities like Emerald Hills, Hollywood Lakes, or the Hillcrest area often face HOA architectural review boards with their own material and aesthetic requirements. We submit packages to these boards as part of our process, not as an afterthought.

Serving Hollywood, FL - Our Local Coverage Area

We’re based in the Hollywood area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

Frequently Asked - Full Kitchen Remodeling in Hollywood

What’s the difference between full kitchen remodeling and the broader Kitchen Remodeling in Hollywood?

Full kitchen remodeling means a complete gut renovation: everything comes out, and we rebuild with new cabinets, countertops, flooring, lighting, and finishes. Our Kitchen Remodeling service hub also includes partial updates, cabinet refacing, and single-element replacements for homeowners who don’t need the full scope. We tailor the approach to your actual condition and goals.

Ready to Start Your Full Kitchen Remodel in Hollywood?

We’ll walk your space, measure precisely, and deliver an itemized estimate with no deposit required to get started. Our kitchen remodeling crew serves all of Hollywood and nearby communities including Andover, Miramar, West Park, and West Hollywood. Many homeowners pair a full kitchen overhaul with Full Bathroom Remodeling in Hollywood or Walk-In Showers & Shower Remodeling in Hollywood for a coordinated whole-home update. Call (844) 665-0162 to schedule your free on-site estimate.

Written by Raymond Estevez, Owner at Groundwork Construction Co., serving Hollywood and South Florida homeowners since our founding.

Why Hollywood Chooses Groundwork Construction Co. of South Florida

We set the standard for full kitchen remodeling in Hollywood.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Hollywood

Getting your full kitchen remodeling handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your full kitchen remodeling needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Hollywood - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local full kitchen remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Hollywood Customers Say

Trusted by homeowners across Hollywood and surrounding areas.

★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo · Verified customer
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan · Verified customer
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett · Verified customer

Ready for Full Kitchen Remodeling in Hollywood?

Call now for a free estimate - or request one below. Licensed, insured, and here with fast after-hours help in Hollywood.

(844) 665-0162

Request a Free Estimate in Hollywood

Tell us about your full kitchen remodeling needs - we'll respond within the hour.

When you send us your details, you agree to our Privacy Policy and authorize us to contact you through phone, text, or email concerning your request, including by the partner businesses that may perform the service.

Prefer to text? Send a Text
Areas We Serve
Call Now - 24/7 Dispatch