Groundwork of Fort Lauderdale, FLCall (844) 665-0162
A Groundwork company - serving Fort Lauderdale, FL
Full Kitchen Remodeling in West Hollywood, FL | Groundwork Construction Co. of South Florida

Full Kitchen Remodeling in West Hollywood - Same-Day Service, Done Right the First Time

Professional full kitchen remodeling services in West Hollywood, FL. Licensed & insured. Same-day and after-hours emergency service available.

144+
Cities Served
Fast
Emergency Response
Licensed & Insured Fast Response Free Estimates All Brands Satisfaction Guarantee

What Full Kitchen Remodeling in West Hollywood Actually Involves

Full kitchen remodeling in West Hollywood means stripping the space to the studs and rebuilding it with new layout, mechanicals, finishes, and fixtures. Most projects we handle in the 33021 area run 6 to 10 weeks from permit approval to final inspection, with budgets typically landing between $14,000 and $45,000 depending on scope and material choices. Call (844) 665-0162 and we’ll walk through your space, your priorities, and where your project likely falls in that range.

Call (844) 665-0162

How We Approach a Full Kitchen Remodel Step by Step

We’ve learned that homeowners in West Hollywood stay calm when they know what’s coming next. Here’s how we sequence a full kitchen remodel, and what you’ll need to decide at each point.

Week 1: Demolition and discovery. We pull everything out, down to the concrete block walls that are standard in 1950s and 1960s West Hollywood homes. This is where we find the surprises: undersized electrical panels, uninsulated CBS walls, galvanized plumbing, or terrazzo floors with cracks that need addressing before anything new goes in. You’ll decide here whether to expand the footprint into an adjacent room or keep the existing walls.

Weeks 2-3: Structural and mechanical rough-in. If you’re relocating the sink, stove, or island, this is when plumbing and gas lines move. Electrical gets upgraded to handle modern appliance loads, which often means a panel upgrade in these older homes. We coordinate the Broward County rough inspection during this window. You’ll choose final appliance models now, since exact specs determine outlet placement and cabinetry dimensions.

Weeks 4-5: Drywall, blocking, and prep. New walls get closed up. We install backing for grab bars, floating shelves, or heavy wall ovens if you’ve spec’d them. Flooring goes down if you’re not keeping original terrazzo. You’ll confirm backsplash tile selection and grout color by this point, since tile contractors need lead time.

Weeks 6-8: Cabinetry, countertops, and fixture install. This is where the visual transformation happens. Cabinets get leveled and anchored to concrete block, which takes longer than wood-framed walls but holds far better long-term. Countertop templating happens after cabinets are set, with a 1-2 week fabrication lag for quartz or stone. You’ll do a walkthrough to confirm hardware placement and adjust any shelf heights before countertops arrive.

Weeks 9-10: Finish work, appliance hookup, and final inspection. Backsplash tile gets set. Plumbing and electrical fixtures go live. Appliances slide in and get leveled. We schedule the Broward County final inspection, which for unincorporated West Hollywood means coordinating with the County Building Division rather than a city hall, a workflow that can add a day or two to scheduling compared to jobs just east in Hollywood proper. You’ll do a punch list walkthrough with our project lead before we close the permit.

The Material and Configuration Choices That Shape Your Kitchen

Full kitchen remodeling in West Hollywood gives you real options. These are the decisions that move your budget and your daily experience:

  • Cabinet construction: Stock boxes from KraftMaid or Wellborn keep costs controlled and delivery predictable. Semi-custom gives you depth modifications and interior organizers. Full custom buys you odd-angle solutions and furniture-grade finishes, but adds 4-6 weeks to the timeline. For the humid South Florida climate, we spec plywood boxes over particleboard, every time.
  • Countertop material: Silestone and Caesarstone engineered quartz resist staining and don’t need sealing, which matters in a kitchen that sees heavy use. They’re priced in the middle of the range. Natural stone like granite or marble costs more and demands maintenance, but some homeowners want that organic variation. Laminate survives budget projects but shows wear faster in a full remodel where everything else is upgraded.
  • Sink and faucet grade: Kohler and Moen fixtures carry solid parts availability and finish warranties. Pull-down sprayers and touchless activation add cost but reduce splatter on new cabinetry. Undermount sinks with quartz or stone countertops create cleaner sightlines than drop-ins.
  • Appliance tier: Builder-grade packages ($3,000-$5,000) handle basic cooking. Professional-style ranges and built-in refrigeration can push appliance spending past $15,000. We spec electrical and gas for what you choose, not what we guess, so this decision locks in early.
  • Flooring: Original terrazzo can be restored and polished, which preserves character and stays cool underfoot. Luxury vinyl plank handles moisture well and installs faster. Large-format tile lasts decades but feels harder and colder. Your subfloor condition, especially in these older CBS homes, may limit what’s practical without major prep.

What Full Kitchen Remodeling Costs in West Hollywood, FL

Component Typical Range
Full Kitchen Remodel $14,000 - $45,000
Small Kitchen Remodel $9,000 - $20,000
Cabinet Installation $4,000 - $13,000
Countertop Installation $2,000 - $6,500
Backsplash Installation $800 - $2,500
Kitchen Island Installation $3,000 - $10,000

Five factors push your project toward the high or low end of that $14,000-$45,000 span:

Kitchen size and layout complexity. A 120-square-foot galley kitchen with plumbing staying put stays budget-friendly. A 300-square-foot space with wall removals, beam installation, and an island with its own sink and dishwasher pushes toward the top.

Existing condition surprises. That 1960s electrical panel we mentioned? Upgrading from 100-amp to 200-amp service adds $2,000-$4,000. Galvanized plumbing replacement adds similar. We build contingency into our estimates, but discovery drives real numbers.

Material grade selections. Stock cabinets and laminate counters keep you near $14,000. Semi-custom cabinetry, quartz countertops, and professional appliances can push a modest kitchen past $30,000 without changing the footprint at all.

Permit scope and compliance triggers. Because West Hollywood sits in unincorporated Broward County, full kitchen remodeling that touches structural walls, electrical service, or plumbing mains triggers hurricane-hardening compliance reviews under current codes. This is necessary work, not optional, and it adds cost compared to cosmetic-only projects.

Relocation of major systems. Moving the sink across the room means new drain lines through concrete slab, which in West Hollywood’s high water table environment requires careful dewatering coordination. Keeping appliances and plumbing in existing locations saves significantly.

Our written estimates include demolition, disposal, materials, labor, permit fees, and inspections. What they don’t include: appliance costs (you purchase those directly for warranty purposes), temporary kitchen setup, or HOA approval fees if your community requires them.

Why West Hollywood Homes Change How We Build

West Hollywood isn’t Hollywood, and it isn’t Pembroke Pines. The unincorporated status means every full kitchen remodeling permit routes through the Broward County Building Division on Stirling Road, not a municipal building department. Out-of-area contractors often stumble here, missing inspection scheduling protocols or posting requirements that add days to a project. We’ve worked this County workflow enough to know the inspectors by name and the typical turnaround times.

The housing stock shapes our approach too. These 1950s and 1960s CBS homes along streets like Grant Street and Jefferson Street were built before Hurricane Andrew rewrote Florida’s building code. When we open walls, we regularly find uninsulated concrete block, original jalousie windows that need upgrading, and electrical systems that can’t handle modern appliance loads. Any significant renovation triggers mandatory compliance with current High-Velocity Hurricane Zone standards, which means impact-rated windows if we’re touching exterior walls, and proper anchoring for anything structural.

The climate adds its own layer. Year-round humidity and intense summer UV mean we spec moisture-resistant materials and exterior-grade finishes even indoors. Fastener corrosion is real here, so we use stainless or coated hardware in kitchens that will see steam and splatter for decades. And that high water table? It doesn’t affect most kitchen remodels directly, but any slab penetration for plumbing relocation needs planning to avoid seepage issues that delay work.

Homeowners in West Hollywood often pair a full kitchen overhaul with other projects once they see what one accountable team can handle. If you’re considering Full Bathroom Remodeling in West Hollywood or Walk-In Showers & Shower Remodeling in West Hollywood, we can sequence the work to minimize disruption and share mechanical rough-in crews across both spaces.

Serving West Hollywood, FL - Our Local Coverage Area

We’re based in the West Hollywood area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

Frequently Asked - Full Kitchen Remodeling in West Hollywood

Ready to Talk Through Your West Hollywood Kitchen?

Call (844) 665-0162 to schedule a free on-site estimate for full kitchen remodeling in West Hollywood. Raymond Estevez or a senior project lead will walk your space, flag the conditions we’ve discussed here, and deliver a written estimate with real numbers, real timelines, and no pressure. If your project makes sense as part of a broader renovation, we’ll also point you toward Kitchen Remodeling in West Hollywood for the full scope, or our Kitchen Remodeling service hub to explore how our crew handles kitchens across South Florida. We cover West Hollywood and surrounding Broward County communities with the same single-source accountability, from first measurement to final County sign-off.

Written by Raymond Estevez, Owner at Groundwork Construction Co., serving West Hollywood and South Florida homeowners since our founding.

Why West Hollywood Chooses Groundwork Construction Co. of South Florida

We set the standard for full kitchen remodeling in West Hollywood.

30-60 Min Response

Fast dispatch across West Hollywood. Same-day and after-hours emergency service available.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in West Hollywood

Getting your full kitchen remodeling handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your full kitchen remodeling needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in West Hollywood - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local full kitchen remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    A background-checked tech heads outLicensed & insured, typically within 1-hour.
  4. 4
    You approve before work beginsNothing starts until you say go.

What West Hollywood Customers Say

Trusted by homeowners across West Hollywood and surrounding areas.

★★★★★

"Called late on a Friday and they had someone at my door within the hour. Professional, clean work, and the price was exactly what they quoted."

Jason M. · West Hollywood
★★★★★

"Best in West Hollywood. Diagnosed the problem immediately and fixed it in under an hour. Two other companies couldn't even get me an appointment that week."

Amanda K. · West Hollywood Area
★★★★★

"Very impressed with the upfront pricing and professionalism. No hidden fees, no upselling - just honest work done right. My go-to company from now on."

Robert L. · Near West Hollywood
★★★★★

"Had an after-hours emergency and they answered right away and sent someone fast. Exactly what you want in a crisis."

Lisa P. · West Hollywood

Ready for Full Kitchen Remodeling in West Hollywood?

Call now for a free estimate - or request one below. Licensed, insured, and here with fast after-hours help in West Hollywood.

(844) 665-0162

Request a Free Estimate in West Hollywood

Tell us about your full kitchen remodeling needs - we'll respond within the hour.

When you send us your details, you agree to our Privacy Policy and authorize us to contact you through phone, text, or email concerning your request, including by the partner businesses that may perform the service.

Prefer to text? Send a Text
Areas We Serve
SunriseWilton ManorsMelrose ParkNorth Andrews GardensOakland ParkLauderhillDaniaDania BeachLauderdale LakesLauderdale-by-the-SeaBroadview ParkPlantationFort LauderdaleDavieWest Hollywood All Service Areas →
Call Now Free Estimate