Groundwork of Fort Lauderdale, FLCall (844) 665-0162
A Groundwork company - serving Fort Lauderdale, FL
Tub-to-Shower Conversion in Miami, FL | Groundwork Construction Co. of South Florida

Tub-to-Shower Conversion in Miami - Same-Day Service, Done Right the First Time

Professional tub-to-shower conversion services in Miami, FL. Licensed & insured. Same-day and after-hours emergency service available.

144+
Cities Served
Fast
Emergency Response
Licensed & Insured Fast Response Free Estimates All Brands Satisfaction Guarantee

Tub-to-Shower Conversion in Miami: Scope, Timeline, and What You’ll Pay

A tub-to-shower conversion removes your existing bathtub and replaces it with a dedicated shower enclosure, typically finishing in 5 to 10 working days depending on material lead times and whether plumbing stays in place. In Miami, this job runs $3,500 to $10,000 for most homes we work on. Call (844) 665-0162 and we’ll walk through your exact layout and give you a written estimate at no charge.

Call (844) 665-0162

How We Handle Tub-to-Shower Conversion from Demo to Final Inspection

We’ve done enough of these in Miami’s older neighborhoods to know where the surprises hide. Here’s how the work actually breaks down, and what you’ll need to decide at each point.

Stage 1: Site measure and plumbing assessment - 1 day

We show up, photograph everything, and determine whether your existing drain location works for a shower pan or needs relocation. In Coral Gables and Coconut Grove homes from the 1960s, we often find galvanized supply lines that are past their service life. You’ll decide here whether to replace just the visible valves or open the wall and update the whole stack. That choice alone can swing your budget $800 to $2,500.

Stage 2: Demolition and substrate inspection - 1 to 2 days

The tub comes out, the surround gets stripped to studs, and we check what we’re working with. Miami’s CBS construction from the 1940s through 1970s means concrete block walls with furring strips - not the open stud bays you’d find up north. We need to verify those strips are solid enough to accept new backer board and tile weight. If the rebar behind the block is corroding from decades of salt-air intrusion, we flag it before closing anything up.

Stage 3: Rough plumbing and pan installation - 1 to 2 days

If we’re keeping the drain where it is, this moves fast. If we’re moving it for a larger footprint or curbless entry, we cut into the slab, which triggers a different inspection path with Miami-Dade. The shower pan goes in - either a prefabricated acrylic base or a traditional hot-mop / membrane system - and you’ll decide here based on your tile selection and whether you want a curbed or curbless entry.

Stage 4: Wall finish and fixture set - 2 to 4 days

Backer board, waterproofing membrane, tile or solid-surface panels, then grout and seal. This is where material choice matters most. Large-format porcelain takes longer to set and level but gives a cleaner look. Acrylic wall systems go up in hours but limit your design options. You’ll have already picked your tile and fixtures during stage 1 so we’re not waiting on deliveries.

Stage 5: Trim, glass, and final inspection - 1 to 2 days

Valves, showerhead, door or enclosure, and cleanup. If your project required a permit - most do if plumbing moved - we coordinate the Miami-Dade inspector’s final sign-off. We don’t consider the job done until that sticker is on the permit card.

The Material and Configuration Choices That Define Your Shower

Every tub-to-shower conversion forces a handful of real decisions. These aren’t upsells - they’re the variables that determine how the space works and holds up.

  • Shower pan: prefab acrylic vs. tiled with membrane. Acrylic bases run $400 to $900 installed and carry manufacturer warranties against leaks. Tiled pans with a traditional hot-mop or Schluter-Kerdi membrane cost more upfront but let you match floor tile exactly and avoid the “insert” look. For Miami’s humidity, either works if the weep holes and slope are right.
  • Wall surround: acrylic panels, solid surface, or tile. Acrylic systems like those from Kohler or Delta go up in a day and resist mold in our climate. Solid surface - think Swanstone or Corian - gives seamless corners and mid-range pricing. Full tile offers the most design flexibility but demands proper waterproofing; we’ve seen too many Allapattah bathrooms with failed grout from the wrong membrane behind it.
  • Glass enclosure: framed, semi-frameless, or frameless. Framed is economical and tolerates out-of-plumb walls common in older Miami homes. Frameless needs precise alignment and heavier hardware but opens the visual space. For a 60-inch opening, you’re looking at roughly $800 framed to $2,200 frameless.
  • Plumbing fixtures: builder grade through designer. Moen, Delta, and Kohler cover most of our jobs. Pressure-balancing valves are code in Miami-Dade; thermostatic valves add $300 to $600 but hold temperature when someone flushes elsewhere in the house. Worth it in multi-generational homes we see in Brownsville and Flagami.
  • Curb vs. curbless entry. Curbless needs the floor recessed or the pan built up to meet drainage slope, which can add $1,200 to $2,500 depending on slab work. It’s the right call for aging-in-place plans, but not every existing bathroom layout accommodates it without structural changes.

What Tub-to-Shower Conversion Costs in Miami, FL

Most tub-to-shower conversions we quote in Miami fall between $3,500 and $10,000. Here’s what pushes a job toward the low or high end of that range:

Cost Driver Low-End Scenario High-End Scenario
Existing layout Drain and valve stay put; no plumbing moves Drain relocated, wall opened, supply lines replaced
Shower size Standard 60″ x 30″ alcove Expanded to 60″ x 36″ or larger with bench
Wall finish Acrylic surround system Floor-to-ceiling porcelain or natural stone tile
Glass and hardware Framed sliding door Frameless enclosure with heavy-glass and custom hardware
Structural surprises Clean demo, solid substrate Corroded furring, rebar repair, or slab cutting

Our written estimates include demolition, disposal, pan and waterproofing, wall finish to 8 feet, basic plumbing trim, and a standard framed glass door. What’s typically separate: permit fees (Miami-Dade charges vary by municipality), any electrical work for lighting or fan upgrades, and premium fixtures you source yourself. We line-item everything so you’re not guessing.

Want an exact number for your bathroom? Call (844) 665-0162 - estimates are free and we bring samples.

What Miami’s Housing Stock and Rules Mean for This Job

Miami-Dade County runs its own Notice of Acceptance (NOA) product approval system, completely independent of Florida’s statewide building code. Every window, door, roofing assembly, and structural fastener has to pass the county’s hurricane-simulation testing before it can legally be installed here. A product approved in Broward County one mile north may be code-illegal in Miami, which means we source and document everything to Miami-Dade standards before we pull a permit. Contractors from outside the county routinely fail inspection on this - we’ve been called in to fix their paperwork.

The central Miami ZIPs we work most - 33155, 33156, and the surrounding areas - are dominated by CBS homes built between the 1940s and 1970s. In Little Havana, Flagami, and Overtown, that means concrete block walls with furring strips, original single-pane aluminum windows, and rebar that’s been breathing salt air for sixty-plus years. When we demo a bathroom in these houses, we’re checking for moisture intrusion behind the block and corroded steel that could compromise new tile backing. It’s not rare to find a tub surround that looked fine from the outside hiding crumbling plaster and rusted lath.

Water pressure and drainage also behave differently here. Miami sits on porous limestone with a shallow water table, and during king tides water rises through the substrate itself. That hydrostatic pressure affects how we detail shower pans and slab penetrations - conventional below-grade waterproofing from other markets doesn’t account for water pushing upward. We spec accordingly.

Many of the homes we work on in Coral Gables and Coconut Grove sit within HOA jurisdictions with design review boards. If your property requires architectural committee approval for exterior window changes or visible plumbing vent modifications, we build that timeline into our schedule so you’re not waiting on a meeting while your bathroom sits torn apart.

Serving Miami, FL - Our Local Coverage Area

We’re based in the Miami area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

Frequently Asked - Tub-to-Shower Conversion in Miami

Ready to Lose the Tub? Start With a Free Estimate

We’ll come to your home in Miami, measure the space, check your plumbing and substrate, and give you a written estimate for your tub-to-shower conversion with options at different price points. No pressure, no deposit to get the number. Call (844) 665-0162 or request a visit through our site. If you’re thinking bigger, this work often sits within a full Bathroom Remodeling in Miami project - and many homeowners tackling exterior upgrades at the same time ask us about Metal Roofing in Miami or Tile Roofing in Miami as part of a whole-home refresh.

Written by Raymond Estevez, Owner at Groundwork Construction Co., serving Miami since our founding.

Why Miami Chooses Groundwork Construction Co. of South Florida

We set the standard for tub-to-shower conversion in Miami.

30-60 Min Response

Fast dispatch across Miami. Same-day and after-hours emergency service available.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Miami

Getting your tub-to-shower conversion handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your tub-to-shower conversion needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Miami - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local tub-to-shower conversion pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    A background-checked tech heads outLicensed & insured, typically within 1-hour.
  4. 4
    You approve before work beginsNothing starts until you say go.

What Miami Customers Say

Trusted by homeowners across Miami and surrounding areas.

★★★★★

"Called late on a Friday and they had someone at my door within the hour. Professional, clean work, and the price was exactly what they quoted."

Jason M. · Miami
★★★★★

"Best in Miami. Diagnosed the problem immediately and fixed it in under an hour. Two other companies couldn't even get me an appointment that week."

Amanda K. · Miami Area
★★★★★

"Very impressed with the upfront pricing and professionalism. No hidden fees, no upselling - just honest work done right. My go-to company from now on."

Robert L. · Near Miami
★★★★★

"Had an after-hours emergency and they answered right away and sent someone fast. Exactly what you want in a crisis."

Lisa P. · Miami

Ready for Tub-to-Shower Conversion in Miami?

Call now for a free estimate - or request one below. Licensed, insured, and here with fast after-hours help in Miami.

(844) 665-0162

Request a Free Estimate in Miami

Tell us about your tub-to-shower conversion needs - we'll respond within the hour.

When you send us your details, you agree to our Privacy Policy and authorize us to contact you through phone, text, or email concerning your request, including by the partner businesses that may perform the service.

Prefer to text? Send a Text
Areas We Serve
SunriseWilton ManorsMelrose ParkNorth Andrews GardensOakland ParkLauderhillDaniaDania BeachLauderdale LakesLauderdale-by-the-SeaBroadview ParkPlantationFort LauderdaleDavieWest Hollywood All Service Areas →
Call Now Free Estimate