Groundwork of Fort Lauderdale, FLCall (844) 665-0162
A Groundwork company - serving Fort Lauderdale, FL
Tub-to-Shower Conversion in Sunset, FL | Groundwork Construction Co. of South Florida

Tub-to-Shower Conversion in Sunset - Same-Day Service, Done Right the First Time

Professional tub-to-shower conversion services in Sunset, FL. Licensed & insured. Same-day and after-hours emergency service available.

144+
Cities Served
Fast
Emergency Response
Licensed & Insured Fast Response Free Estimates All Brands Satisfaction Guarantee

How Much Does a Tub-to-Shower Conversion Cost in Sunset, FL?

A tub-to-shower conversion in Sunset, FL typically runs $3,500-$10,000, takes 3-5 working days, and requires a Miami-Dade County plumbing permit with rough-in and final inspections. Most 1960s-1980s ranch homes in the 33173 area keep their existing drain location, which keeps the job on the lower end of that range. Call (844) 665-0162 and we’ll walk through your bathroom layout over the phone, then schedule a free on-site estimate.

Call (844) 665-0162

We’ve done this job on dozens of homes along SW 72nd Street and SW 88th Street corridors, and the pattern is consistent: original cast-iron or steel tubs in concrete-block ranches that have outlived their usefulness. The question isn’t whether the tub is failing. It’s whether the surrounding structure, plumbing, and substrate are worth building around.

How We Handle a Tub-to-Shower Conversion, Start to Finish

Day one is demolition and discovery. We remove the tub, surround, and any tile backer down to studs. In Sunset’s older CBS homes, this is where we find the surprises: corroded galvanized supply lines, rotted wood blocking behind the tub flange from decades of splash-over, or a slab with no moisture barrier because it was poured in 1972. We photograph everything and review it with you before lunch. You’ll decide right then whether to replace the valve and supply lines while the wall is open, which adds roughly $400-$900 but eliminates a future plumbing failure behind finished tile.

Day two is rough plumbing and framing prep. If we’re keeping the drain in place, we verify the P-trap condition and pitch. If you’re moving to a linear drain or centering the shower for a wider door, we cut the slab, which triggers a structural review under Miami-Dade’s post-Andrew enforcement. This is the step that separates a three-day job from a five-day job. You’ll choose your shower pan system here: a traditional mortar bed with waterproofing membrane, a prefabricated foam pan with integrated slope like Wedi or Schluter, or a solid-surface base. The foam systems cost more upfront but save labor and eliminate the variable of a trowel-applied slope.

Day three is wallboard, waterproofing, and niche framing. We use cement board with a liquid-applied membrane or a bonded sheet membrane, depending on your tile selection. Large-format tile demands a flatter substrate, so we may add a self-leveling skim. You’ll finalize niche placement and any bench seating now, because these decisions affect stud blocking and waterproofing continuity.

Day four is tile setting or wall panel installation. Porcelain and ceramic are the standard in Sunset homes; natural stone requires enhanced waterproofing and a penetrating sealer schedule because of South Florida’s humidity. If you choose a solid-surface wall system like Swanstone or Corian, installation is faster but your color and texture options narrow. Grout cure time means we typically can’t seal and finish until day five.

Day five is trim, glass, final plumbing connections, and cleanup. We install your shower door, test all valves, and verify drainage rate. Miami-Dade requires a final plumbing inspection, which we schedule. You sign off after a walkthrough. The whole sequence assumes no structural surprises; if we hit a slab crack or active leak, we pause, document, and quote the repair before continuing.

The Choices That Shape Your Tub-to-Shower Conversion

  • Shower pan: prefabricated base vs. custom tile. A cultured marble or acrylic base runs $600-$1,400 installed and is done in hours. A mud-set tile pan with proper waterproofing adds $1,200-$2,800 but lets you match floor tile exactly and eliminates the seam between pan and wall. In Sunset’s hard-water environment, the smoother surface of a solid base is easier to keep clean; tile with sanded grout demands more maintenance.
  • Wall surround: tile, solid surface, or hybrid. Full tile gives unlimited design range but costs $8-$25 per square foot for material plus labor. Solid-surface panels like Swanstone or Kohler Choreograph install faster, have no grout lines, and cost $1,500-$3,500 for a typical three-wall surround. Many of our Sunset clients split the difference: tile on the back wall for visual impact, solid surface on side walls for practicality.
  • Shower door: framed, semi-frameless, or frameless. Framed sliders start around $400; frameless glass with heavy hardware runs $1,200-$2,500. The frameless look is what most homeowners picture when they imagine a modern shower, but it requires precise wall plumbness. In older CBS block homes with slightly out-of-square framing, we may recommend semi-frameless to avoid custom glass surcharges.
  • Valve and fixtures: pressure-balance vs. thermostatic. A pressure-balance valve (Moen, Delta, Kohler) prevents scalding when someone flushes a toilet and costs $150-$400. A thermostatic valve holds temperature within one degree regardless of pressure fluctuation and runs $400-$900. For households with kids or elderly residents, the thermostatic upgrade is worth considering.
  • Niche, bench, and storage. A tiled niche adds $300-$600. A fold-down teak bench or built-in corner seat adds $400-$1,100. These aren’t afterthoughts; they require blocking in the framing stage, so we lock them in by day two.

What Tub-to-Shower Conversion Costs in Sunset, FL

Component Low Range High Range
Basic conversion (keep drain, acrylic base, surround, standard door) $3,500 $5,500
Mid-range (tile pan, tiled walls, semi-frameless door, new valve) $5,500 $8,000
Full custom (relocate drain, frameless glass, stone or large-format tile, thermostatic valve, niche, bench) $8,000 $10,000

Five variables push you up or down this ladder. First, drain location: keeping it saves $800-$1,500 in slab work. Second, wall condition: drywall and studs damaged by long-term moisture need replacement, adding $500-$2,000. Third, material grade: porcelain under $3 per square foot performs fine; designer tile at $15+ per square foot drives the total quickly. Fourth, plumbing age: galvanized or polybutylene supply lines trigger a whole-house repipe discussion. Fifth, permit scope: Miami-Dade’s plumbing permit for a wet-area remodel is standard, but if your project is part of a full Bathroom Remodeling in Sunset, the permit bundles and inspection sequencing change.

Our written estimates itemize demolition, disposal, plumbing, pan and wall materials, waterproofing, tile or panel labor, door installation, trim, and permit fees. What they don’t include: asbestos or lead testing if your home predates 1978, mold remediation behind the tub, or structural slab repair. We flag these possibilities during the initial walkthrough so you’re not surprised.

What Sunset Homes Specifically Mean for This Job

Sunset’s housing stock is almost entirely 1960s-1980s concrete-block ranch construction, and that era matters for tub-to-shower conversions in ways that don’t apply to newer builds. The original bathrooms were built with cast-iron tubs set in mortar beds on the slab, with galvanized steel supply lines and copper drains. After thirty to fifty years, the tub coating is worn, the drain flange is corroded, and the mortar bed has become a moisture sponge. We’ve opened walls in homes near SW 107th Avenue and found the blocking behind the tub completely rotted, yet the homeowner had no idea because the tile hid it.

The post-Andrew rebuilding wave didn’t reach many of these interiors. While roofs and windows were upgraded to meet Miami-Dade’s stricter code, bathrooms often weren’t touched. That means when we pull a tub today, we’re frequently the first contractor to expose the original construction. We plan for it.

Miami-Dade County’s product-approval system also affects material selection. Every waterproofing membrane, shower pan system, and window we might install must carry a Miami-Dade Notice of Acceptance. Our Bathroom Remodeling crew verifies NOA numbers before ordering; out-of-county contractors who skip this step get red-tagged at inspection. For Sunset homeowners, this means your contractor’s familiarity with Sunset permitting isn’t optional. It’s the difference between passing inspection on the first try and a two-week delay.

The shallow water table and summer storm saturation we see east of the Everglades also matter. Any slab cutting for drain relocation risks hitting standing water, so we schedule that work in drier months when possible and use dewatering if necessary. Homes in this area with original slab construction and no perimeter drainage are more prone to moisture migration through the slab, which influences our pan and waterproofing specifications.

Homeowners in Sunset often coordinate interior work with exterior upgrades. If you’re already planning a Metal Roofing in Sunset or Tile Roofing in Sunset project to address aging roof decking, bundling the permits and inspections under one contractor relationship simplifies scheduling and accountability.

Serving Sunset, FL - Our Local Coverage Area

We’re based in the Sunset area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

Frequently Asked - Tub-to-Shower Conversion in Sunset

Ready to Convert Your Tub to a Shower in Sunset?

Call (844) 665-0162 to schedule a free on-site estimate. We’ll measure your bathroom, inspect the existing plumbing and walls, and deliver a written quote with line-item pricing within 24 hours. No deposit required to book, and we coordinate Miami-Dade permitting so you don’t have to visit the county office.

Written by Raymond Estevez, Owner at Groundwork Construction Co., serving Sunset and South Florida homeowners since establishing our Fort Lauderdale base.

Why Sunset Chooses Groundwork Construction Co. of South Florida

We set the standard for tub-to-shower conversion in Sunset.

30-60 Min Response

Fast dispatch across Sunset. Same-day and after-hours emergency service available.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Sunset

Getting your tub-to-shower conversion handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your tub-to-shower conversion needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Sunset - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local tub-to-shower conversion pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    A background-checked tech heads outLicensed & insured, typically within 1-hour.
  4. 4
    You approve before work beginsNothing starts until you say go.

What Sunset Customers Say

Trusted by homeowners across Sunset and surrounding areas.

★★★★★

"Called late on a Friday and they had someone at my door within the hour. Professional, clean work, and the price was exactly what they quoted."

Jason M. · Sunset
★★★★★

"Best in Sunset. Diagnosed the problem immediately and fixed it in under an hour. Two other companies couldn't even get me an appointment that week."

Amanda K. · Sunset Area
★★★★★

"Very impressed with the upfront pricing and professionalism. No hidden fees, no upselling - just honest work done right. My go-to company from now on."

Robert L. · Near Sunset
★★★★★

"Had an after-hours emergency and they answered right away and sent someone fast. Exactly what you want in a crisis."

Lisa P. · Sunset

Ready for Tub-to-Shower Conversion in Sunset?

Call now for a free estimate - or request one below. Licensed, insured, and here with fast after-hours help in Sunset.

(844) 665-0162

Request a Free Estimate in Sunset

Tell us about your tub-to-shower conversion needs - we'll respond within the hour.

When you send us your details, you agree to our Privacy Policy and authorize us to contact you through phone, text, or email concerning your request, including by the partner businesses that may perform the service.

Prefer to text? Send a Text
Areas We Serve
SunriseWilton ManorsMelrose ParkNorth Andrews GardensOakland ParkLauderhillDaniaDania BeachLauderdale LakesLauderdale-by-the-SeaBroadview ParkPlantationFort LauderdaleDavieWest Hollywood All Service Areas →
Call Now Free Estimate