A Groundwork company - serving Fort Lauderdale, FL
Full Kitchen Remodeling in Kendall, FL | Groundwork Construction Co. of South Florida

Full Kitchen Remodeling in Kendall - Written Fixed Price, Finish Date in the Contract

Free in-home design consult and a written, line-item quote before demo starts. The price we sign is the price you pay, with a finish date in the contract. Licensed, insured, permits handled.

Call to schedule your free estimate

23+
Years in Business
144+
Cities Served
Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Full Kitchen Remodeling in Kendall, FL - What’s Involved, What It Costs, and How Long It Takes

Full kitchen remodeling in Kendall, FL typically runs $14,000-$45,000 and takes 4-8 weeks from permit approval to final inspection, depending on whether you’re keeping the existing footprint or relocating walls, plumbing, and electrical. Most Kendall homeowners we work with are dealing with 1970s-1990s concrete-block homes where the kitchen hasn’t been touched in two decades or more. Call (844) 665-0162 for a free on-site estimate and we’ll walk you through what your specific layout and condition will require.

Call (844) 665-0162

How We Approach a Full Kitchen Remodel - Start to Finish

We’ve learned that Kendall homeowners want to know exactly what happens when, especially if they’re living in the house during construction. Here’s how we sequence a typical full kitchen remodel:

Week 1: Demolition and discovery. We strip cabinets, countertops, flooring, and appliances down to the concrete-block shell. This is where we find the surprises - outdated aluminum wiring, galvanized supply lines, or the hasty drywall patches from post-Andrew repairs that never addressed the framing behind them. We document everything with photos and meet you on-site within 48 hours to review any scope changes.

Week 2-3: Rough mechanicals and structural work. If you’re moving the sink, range, or island, this is when plumbing and electrical get rerouted. We pull new copper or PEX supply lines, run dedicated 20-amp circuits for appliances, and address any wall removal with a structural engineer’s letter - required by Miami-Dade for any load-bearing modification. HVAC duct adjustments happen here too, since many Kendall kitchens have undersized returns that can’t handle modern range hood exhaust loads.

Week 3-4: Drywall, flooring, and paint. We close walls with moisture-resistant drywall (essential in South Florida’s humidity), install your selected flooring, and apply primer. This stage looks dramatic - the space starts feeling finished - but we caution clients not to rush us into fixtures before inspections clear.

Week 4-6: Cabinetry, countertops, and tile. Cabinets go in first, leveled on the often-uneven concrete slabs common in pre-1993 Kendall homes. Countertop templating happens after cabinet installation - we work with Cambria, Silestone, and Caesarstone for engineered quartz, each with different edge profiles and warranty terms. Backsplash tile follows, with waterproofing behind cooktop walls per Florida Building Code.

Week 6-8: Appliances, fixtures, trim, and final inspection. We install your range, refrigerator, dishwasher, and ventilation hood, then connect plumbing and gas lines. The Miami-Dade inspector returns for final sign-off, checking that all electrical is grounded, gas lines are pressure-tested, and - critically - that every product carries a valid NOA for HVHZ use. We don’t schedule this inspection until we’re certain we’ll pass; a failed re-inspection costs you another 1-2 weeks.

Throughout, you’re deciding at specific gates: cabinet style and hardware by week 2, countertop material and edge by week 3, backsplash tile and grout by week 4, fixture finishes by week 5. We send reminder emails so nothing stalls the schedule.

The Material and Layout Choices That Shape Your Kitchen

Full kitchen remodeling means you’re choosing everything, not just surfaces. Here are the decisions that most affect how your kitchen functions and what you spend:

  • Cabinet construction: Stock boxes from KraftMaid or Wellborn save 30-40% versus custom but limit you to standard sizes - workable in many Kendall kitchens with straightforward layouts, frustrating if your walls are out of square (common in post-Andrew quick repairs). Custom cabinets let you maximize odd corners and ceiling heights but add 2-3 weeks lead time.
  • Countertop material: Silestone and Caesarstone quartz resist staining and don’t require sealing - a genuine advantage in humid Kendall kitchens where mold and mildew are constant threats. But they’re heavier than laminate, and some older slab foundations need reinforcement; we check this during discovery. Natural stone like granite costs comparable to mid-tier quartz but needs annual sealing.
  • Fixture quality tier: Kohler and Moen faucets range from $150 builder-grade to $800+ commercial-style pull-downs. The difference isn’t just finish - it’s cartridge longevity and parts availability. We specify all-brass bodies for Kendall’s hard water, which destroys zinc alloy internals in 3-5 years.
  • Island configuration: A fixed island with storage and seating requires 36 inches minimum clearance on all sides; in the narrower galley kitchens common in 1970s Kendall ranches, a peninsula often works better. Moving an island’s location means relocating electrical and possibly plumbing - a $2,000-$5,000 swing.
  • Appliance integration: Panel-ready dishwashers and built-in refrigerators look seamless but require precise cabinet specs ordered 8-10 weeks ahead. Standard-depth appliances slide in faster and cost less, though they protrude past cabinet faces.

Our kitchen remodeling crew brings samples to your house - we don’t expect you to pick Cambria from a 2-inch chip under fluorescent showroom light.

What Full Kitchen Remodeling Costs in Kendall, FL

Component Typical Range
Full kitchen remodel (total project) $14,000 - $45,000
Cabinet installation $4,000 - $13,000
Countertop installation $2,000 - $6,500
Backsplash installation $800 - $2,500
Kitchen island installation $3,000 - $10,000

Five factors push you toward the high or low end of that $14,000-$45,000 range:

Size and layout complexity. A 10×10 kitchen with no plumbing relocation stays near $14,000-$18,000. A 15×20 kitchen with an island move, wall removal, and window relocation can hit $35,000+ before finishes.

Existing condition surprises. Pre-1993 Kendall homes frequently reveal aluminum wiring, galvanized drains, or termite-damaged sill plates once cabinets come out. We budget 10-15% contingency for these discoveries.

Structural modifications. Removing a wall between kitchen and living room requires an engineer’s analysis, temporary supports, and a beam installation - typically $3,000-$8,000 depending on span and load.

Material grade selections. Entry-level quartz and stock cabinets keep material costs around 25% of total budget. Premium custom cabinetry and stone can push materials to 40-45%.

Permit and inspection scope. Miami-Dade’s HVHZ requirements mean every product must be NOA-listed; sourcing compliant materials costs more than non-HVHZ equivalents, but using unlisted products guarantees inspection failure and rework.

A written estimate from us includes demolition, disposal, all labor, materials we supply, permit fees, and final cleaning. It does not include appliances you purchase separately, temporary kitchen setup, or tree/landscape work outside the kitchen footprint. Call (844) 665-0162 for an exact quote - estimates are free.

Why Kendall Homes Make This Job Different

Kendall sits in Miami-Dade County’s High Velocity Hurricane Zone, and that reality shapes every full kitchen remodel we do here. The 1992 Hurricane Andrew landfall rewrote the building code, and the split between pre-Andrew and post-Andrew construction is something we encounter constantly.

In the 1970s and 1980s subdivisions off Kendall Drive and SW 88th Street, we regularly open walls to find the telltale signs of rushed post-storm repairs: mismatched drywall patches, non-compliant tie-down hardware, and framing that was “good enough” in 1993 but wouldn’t pass today’s inspection. When we’re installing new cabinets or relocating an island, these hidden shortcuts become our problem to solve - and we price that discovery contingency honestly rather than surprise you mid-project.

The permitting process in unincorporated Kendall means every structural component must carry a Miami-Dade Notice of Acceptance number. Inspectors here will reject a window, fastener, or roofing product that lacks an active NOA - no exceptions, no “it’s basically the same thing.” Our crew maintains direct relationships with HVHZ-approved suppliers rather than sourcing from big-box stores, because a failed inspection costs you weeks, not days.

Western Kendall’s shallow Miami Limestone bedrock also affects projects that expand the kitchen footprint or add exterior access. Where a Tampa or Orlando crew might trench utilities in an afternoon, we sometimes need pneumatic breaking equipment - a cost we flag early, not bury in a change order.

Many homeowners doing full kitchen remodeling in Kendall also explore full bathroom remodeling in Kendall or walk-in showers and shower remodeling in Kendall to coordinate finishes and minimize disruption. We’re structured to handle both under one timeline if that fits your plans.

Serving Kendall, FL - Our Local Coverage Area

We’re based in the Kendall area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

Frequently Asked - Full Kitchen Remodeling in Kendall

Ready to Start Your Full Kitchen Remodel in Kendall?

Call (844) 665-0162 to schedule a free on-site estimate. We’ll measure your space, assess existing conditions, and return a detailed written proposal within 48 hours. No deposit required to schedule; work begins only when you’re satisfied with the plan and the price. We serve Kendall and surrounding areas including Pinecrest, Glenvar Heights, South Miami, and Cutler.

Written by Raymond Estevez, Owner at Groundwork Construction Co., serving Kendall since our founding.

Why Kendall Chooses Groundwork Construction Co. of South Florida

We set the standard for full kitchen remodeling in Kendall.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Kendall

Getting your full kitchen remodeling handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your full kitchen remodeling needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Kendall - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local full kitchen remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Kendall Customers Say

Trusted by homeowners across Kendall and surrounding areas.

★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett · Verified customer
★★★★★

"The finished work is exactly what we wanted. It did run about three weeks over, mostly waiting on a cabinet delivery that was out of his hands, though I would have liked more updates during that stretch."

Dev Sharma · Verified customer
★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker · Verified customer

Ready for Full Kitchen Remodeling in Kendall?

Call now for a free estimate - or request one below. Licensed, insured, and here with fast after-hours help in Kendall.

(844) 665-0162

Request a Free Estimate in Kendall

Tell us about your full kitchen remodeling needs - we'll respond within the hour.

When you send us your details, you agree to our Privacy Policy and authorize us to contact you through phone, text, or email concerning your request, including by the partner businesses that may perform the service.

Prefer to text? Send a Text
Areas We Serve
Call Now - 24/7 Dispatch