Small bathroom remodels in Hollywood typically run $5,000-$12,000 and take 2-4 weeks from permit approval to final inspection. Most of the homes we work on in Hollywood are 1950s-1980s concrete block construction with original layouts that haven’t been touched in decades. Call (844) 665-0162 for a free on-site estimate and we’ll bring samples from KraftMaid and Wellborn so you can see cabinet grades side by side.
How We Handle Small Bathroom Remodels Start to Finish
We’ve refined our process across hundreds of Broward County bathrooms. Here’s exactly what happens, and when you’ll need to make decisions.
Day 1-2: Protect and Demo
We cover floors and doorways with masonite and plastic, then remove the existing vanity, toilet, tub or shower surround, and any wall tile down to the studs. For Hollywood’s older CBS homes, we’re often cutting through multiple layers of previous renovations - we’ve found everything from 1970s plastic surrounds to 1990s DIY tile jobs laid directly over original plaster. We haul everything out same-day. You’ll confirm your final fixture and tile selections before we start, since lead times on some items run 2-3 weeks.
Day 3-5: Rough Plumbing and Electrical
If you’re keeping the existing layout, this stage moves fast. We cap lines, test pressure, and replace galvanized supply lines with PEX where needed - common in pre-1980 Hollywood homes. Electrical gets brought to code: GFCI protection, dedicated exhaust fan circuit, and adequate vanity lighting. If you’re relocating a toilet or expanding a shower footprint, this is where we open the slab. That decision adds 2-4 days and $1,500-$4,000.
Day 6-10: Close-Up and Waterproofing
We hang cement board or moisture-resistant drywall, then apply liquid or sheet membrane waterproofing in the wet area. In Hollywood’s humid climate, we spec full-coverage waterproofing rather than just the minimum code requirement - the difference in material cost is maybe $200, but it eliminates the mold callbacks we’ve seen from contractors who skipped it. Tile layout gets dry-fitted and your approval before any thinset touches the wall.
Day 11-16: Tile, Fixtures, and Finish Carpentry
Floor tile goes in first, then wall tile, then grout. We install the new vanity, connect plumbing fixtures, and hang the mirror or medicine cabinet. For small bathrooms in Hollywood’s retirement communities, we often spec comfort-height toilets and lever-handle faucets - details that matter when knees and grip strength aren’t what they used to be. Your paint color gets finalized during tile installation so we can match undertones.
Day 17-20: Final Inspection and Punch List
Broward County inspects plumbing and electrical rough-ins if we moved anything, plus a final health and safety check. We schedule around their availability, which in Hollywood typically means a 2-3 day wait. After pass, we caulk, clean, and walk through with you. The whole project, from signed contract to done, averages 4-6 weeks including permit time.
The Material Choices That Actually Matter in a Small Bathroom
Every decision in a tight space has outsized impact. Here’s what we walk homeowners through:
- Vanity cabinet: KraftMaid’s semi-custom line lets you squeeze a 18″-24″ unit into awkward corners with finished sides, while Wellborn’s framed construction holds up better in beach-adjacent humidity. Particleboard boxes swell - we won’t install them within a mile of the Intracoastal.
- Countertop: Cambria quartz resists etching from toothpaste and cosmetics better than marble, and its non-porous surface matters in Hollywood’s mold-prone summers. For budget-focused jobs, solid surface runs 30% less with acceptable durability.
- Shower surround vs. tile: Acrylic or fiberglass surrounds install in a day and cost $800-$1,500 installed. Tile starts around $2,500 but lets you run the same material from shower to floor, which visually expands a 5’×8′ Hollywood guest bath. Grout maintenance is real - we show you the sealer schedule.
- Flooring: Luxury vinyl plank (LVP) handles humidity and installs over existing tile if height allows, saving demo cost. Porcelain tile lasts longer but feels colder underfoot - relevant when you’re stepping out of the shower at 6 AM in January.
- Exhaust fan: Code minimum is 50 CFM. We spec 80-110 CFM for Hollywood’s climate, ducted through the roof or gable, not into the attic. We’ve replaced too many rotted roof decks from vented-into-attic installations.
What Small Bathroom Remodels Cost in Hollywood, FL
| Component | Typical Range |
|---|---|
| Full small bathroom remodel (5’×8′ or smaller) | $5,000-$12,000 |
| Keeping existing layout, mid-grade materials | $5,000-$7,500 |
| Relocating toilet or shower, premium finishes | $8,500-$12,000 |
| Plumbing rough-in (if moving fixtures) | $1,500-$4,000 |
| Permit and inspection fees (Broward County) | $300-$600 |
Five factors push your number up or down:
Size and existing condition. A 5’×5′ powder room with intact drywall and modern plumbing starts lower. A 5’×8′ hall bath with galvanized pipes, a leaking shower pan, and termite-damaged framing - common in 1960s Hollywood duplexes - needs remediation before cosmetics.
Layout changes. Moving a toilet drain in a slab-on-grade CBS home means concrete cutting, which adds $1,500-$4,000 and extends the timeline. Keeping fixtures where they are saves both.
Material grade. A Wellborn vanity with soft-close drawers and Cambria top runs $2,500-$3,500 installed. Big-box stock cabinetry with laminate top: $800-$1,200. Both function; the difference is in feel and longevity.
Permit scope. Broward requires permits for any plumbing or electrical modification. Cosmetic-only work (vanity swap, paint, flooring over existing) avoids the 2-3 week permit queue but limits what we can address structurally.
Accessibility features. Grab bars, curbless showers, and comfort-height fixtures add $500-$2,000 but future-proof the space. In Hollywood’s 55+ communities, we install these on roughly half our small bathroom remodels.
Our written estimates include demolition, disposal, materials, labor, permits, and final cleaning. They don’t include your choice of decorative mirrors, towel bars, or artwork - though we’ll hang whatever you supply.
What Hollywood’s Homes and Rules Mean for Your Project
Hollywood sits entirely within Florida’s High Velocity Hurricane Zone, and that designation reaches into bathroom work in ways most homeowners don’t expect. If your remodel is part of a larger project - say, you’re also replacing windows or re-roofing - every product must carry a Miami-Dade Notice of Acceptance with HVHZ listing. We’ve seen contractors from Palm Beach County get stopped cold at the Broward permit desk because their window spec lacked the right NOA. For a standalone bathroom, this matters most if you’re adding or enlarging a window; the glass itself must be impact-rated or protected with approved shutters.
The housing stock we work on most is 1950s-1970s concrete block and stucco in neighborhoods like Hollywood Hills and the area near Young Circle - original bathrooms with cast-iron tubs, single-pane jalousie windows, and 60-amp electrical panels that can’t handle a modern exhaust fan plus heated floor. In these homes, a “small” remodel often reveals galvanized supply lines, ungrounded outlets, and no exhaust ducting at all. We flag this during our first walkthrough so you’re not surprised by change orders.
West of I-75 in ZIPs like 33029, the 1990s-2000s tract homes have fewer hidden problems but their bathrooms were built to minimum spec. The layouts are tight, the vanities are 24″ builder-grade, and the shower valves are often the cheapest pressure-balance units available. Upgrading to a thermostatic valve and a 30″ vanity makes an immediate difference in daily use.
For barrier island properties near Hollywood Beach, salt air accelerates corrosion on any exposed metal - cheap chrome fixtures pit within two years. We spec brass-bodied valves and PVD finishes for anything within a few blocks of the ocean. And if you’re in a condo building along the beach, your HOA likely has renovation-hour restrictions and contractor insurance requirements we handle during pre-construction.
Homeowners doing exterior work often pair a bathroom refresh with Specialty Roofing in Hollywood or Gutters & Accessories in Hollywood to address the full envelope at once. If you’re considering a more extensive project, Bathroom Remodeling in Hollywood covers the full scope beyond compact spaces.
Serving Hollywood, FL - Our Local Coverage Area
We’re based in the Hollywood area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
Frequently Asked - Small Bathroom Remodels in Hollywood
Active construction runs 2-4 weeks; add 2-3 weeks for Broward County permit approval if we’re moving plumbing or electrical. Total timeline from signed contract to completion averages 4-6 weeks. Call (844) 665-0162 and we can check current permit turnaround times.
Yes, if you’re altering plumbing, electrical, or structural elements. Broward County requires permits for toilet relocations, shower expansions, exhaust fan additions, and any electrical circuit changes. Cosmetic-only work - vanity replacement, flooring, paint - doesn’t require permitting. We pull permits as part of our standard process.
Absolutely, and we recommend it for budget-conscious jobs. Keeping the toilet, vanity, and shower in their existing locations saves $1,500-$4,000 in slab work and avoids extending the timeline. We focus the budget on better materials and finishes instead. Most Hollywood guest baths and powder rooms work beautifully with the original layout.
Refacing the existing vanity, adding LVP over the current floor, replacing the toilet and faucet, and repainting runs $3,000-$5,000. It won’t fix underlying plumbing or moisture issues, but it refreshes the space. We only recommend this route if our inspection shows sound structure and modern supply lines.
We warranty our workmanship for one year on all installations. Manufacturer warranties cover fixtures and materials - typically lifetime on brass valves, 10-25 years on acrylic surrounds, and varying terms on tile and cabinetry. We register all warranties in your name and leave you the documentation.
Ready to Start Your Small Bathroom Remodel in Hollywood?
Call (844) 665-0162 to schedule a free on-site estimate. Raymond Estevez or a member of our bathroom remodeling crew will measure your space, check existing plumbing and electrical, and bring material samples from our curated brand roster. You’ll get a written estimate within 48 hours with no pressure to decide on the spot. We serve Hollywood and surrounding Broward communities including Andover, Miramar, West Park, and West Hollywood.
Written by Raymond Estevez, Owner at Groundwork Construction Co., serving Hollywood since our founding.