Full Kitchen Remodeling in Weston, FL - Scope, Timeline, and Cost
A full kitchen remodeling in Weston strips the room to studs and rebuilds it with new layout, cabinetry, countertops, appliances, lighting, and finishes. Most projects we run in Weston take 6 to 10 weeks from permit approval to final walkthrough, depending on whether plumbing or walls move. Budgets typically land between $14,000 and $45,000. Call (844) 665-0162 and we’ll walk your space with you, no charge.
How a Full Kitchen Remodel Actually Unfolds
We’ve refined our process across dozens of Weston homes, mostly the 1990s-2010s builds in villages like The Ridges and Sector 3. Here’s what happens, and when you’ll need to make decisions.
Stage 1: Demolition and rough inspection (Days 1-5)
We pull permits through Broward County and Weston’s municipal review, plus your village ARB if the work touches exterior walls or windows. Everything comes out: cabinets, counters, flooring, drywall, old wiring, and plumbing rough-ins. You’ll need your appliance specs finalized by day 3 so we can rough in gas, electric, and water lines to the right locations. This stage ends with a city rough inspection.
Stage 2: Structural and MEP rough-in (Days 6-14)
If you’re removing a wall or relocating the sink, this is when it happens. We coordinate framing, plumbing, HVAC, and electrical simultaneously - one crew, one schedule. Moving a sink from an exterior wall to an island, common in Weston homes with galley layouts, adds about 3-4 days and requires slab penetration for drain lines. You’ll sign off on outlet and switch placements now; changing them later is expensive.
Stage 3: Drywall, flooring, and paint (Days 15-25)
We hang drywall, set tile or hardwood, and apply primer. If you’ve chosen porcelain plank flooring - popular in Weston for its resistance to humidity and pool-area foot traffic - we allow extra cure time before cabinetry load. Your paint colors and backsplash tile must be on-site by day 18.
Stage 4: Cabinetry, countertops, and appliance set (Days 26-40)
Base cabinets go in first, then uppers, then the island if you have one. We template countertops only after cabinets are level and secured; fabrication takes 7-10 business days for quartz or granite. Appliance delivery gets scheduled for the day after counter installation. This is where projects slip if cabinets arrive damaged or a custom hood vent needs field modification.
Stage 5: Finish electrical, plumbing, hardware, and punch (Days 41-50+)
Under-cabinet lighting, pendant drops, faucet and disposal hookups, hardware installation, and final paint touch-up. We run a final inspection with Weston building officials, then walk the space with you. Our punch list gets resolved within 48 hours.
The Material and Layout Choices You’ll Face
Full kitchen remodeling means decisions at every tier. Here’s where homeowners in Weston typically pause, and what each path costs in practice.
- Stock vs. semi-custom vs. custom cabinetry: Stock cabinets from KraftMaid or Wellborn run $4,000-$8,000 for a typical Weston kitchen and deliver in 2-3 weeks. Semi-custom adds configuration flexibility and runs $8,000-$13,000. Full custom, built locally, starts around $12,000 and stretches timelines by 4-6 weeks. We specify plywood boxes and soft-close hardware regardless of tier; particleboard doesn’t survive South Florida humidity.
- Quartz vs. granite vs. solid surface countertops: Engineered quartz from Cambria, Silestone, or Caesarstone runs $2,500-$5,500 installed and needs no sealing. Granite runs slightly less but demands annual maintenance. Solid surface like Corian scratches easier but allows integrated sinks. Most Weston homeowners choose quartz for the combination of durability and the clean, consistent look that ARB design guidelines favor.
- Layout: keep it, move it, or open it: Keeping your existing footprint saves $3,000-$8,000 in plumbing and electrical relocation. Moving the sink or range to an island, popular in Weston homes built with closed kitchens, requires slab work and extends the timeline. Removing a load-bearing wall to open to the living room adds engineering, permit complexity, and $4,000-$10,000 - but it’s the single change most homeowners say they’d make again.
- Appliance tier: Standard stainless packages run $4,000-$7,000. Built-in or panel-ready units that integrate with cabinetry run $10,000-$18,000. We rough in for your choice; swapping from 30-inch to 36-inch range later means cabinet modification.
- Flooring: Porcelain tile or luxury vinyl plank handles Weston’s humidity and occasional flooding better than hardwood. Large-format porcelain, 24×48 inches, is what we’re installing most often in Weston kitchens now.
Part of a full Kitchen Remodeling in Weston project often includes adjacent space coordination - we handle that as one build, not a handoff between trades.
What Full Kitchen Remodeling Costs in Weston, FL
| Cost Component | Typical Range |
|---|---|
| Full kitchen remodeling (total project) | $14,000 - $45,000 |
| Cabinetry and hardware | $4,000 - $13,000 |
| Countertops (fabricated and installed) | $2,000 - $6,500 |
| Appliances | $4,000 - $18,000 |
| Plumbing and electrical relocation | $1,500 - $6,000 |
| Flooring | $2,000 - $6,000 |
| Permits and inspections (Broward + Weston) | $800 - $2,500 |
Five factors push you toward the high or low end of that $14,000-$45,000 range:
Kitchen size and existing condition: A compact kitchen in a 1990s Weston villa with intact drywall and no water damage starts closer to $14,000. A 300-square-foot kitchen with mold behind cabinets, outdated aluminum wiring, or slab cracks from the area’s shifting muck-over-limestone soil pushes toward $35,000+ before you choose a single finish.
Plumbing and electrical relocation: Keeping the sink, range, and refrigerator in their existing locations saves substantial cost. Moving any one of them across the room adds $1,500-$3,500 per trade.
Structural changes: Removing a wall, adding a beam, or expanding the kitchen footprint into a lanai requires engineering drawings and extended permitting. In Weston, this also triggers ARB review if the exterior envelope changes.
Material grade: The spread between stock cabinetry with laminate counters and custom built-ins with Cambria quartz and panel-ready appliances can easily reach $20,000.
Permit scope: Broward County plus Weston municipal review runs $800-$1,500 for a standard kitchen. If your village ARB gets involved, add their fees and the cost of revised submissions if your first plans don’t match village-specific guidelines.
Our written estimates itemize labor, materials, permits, and allowances. What they don’t include: your appliance purchases (we coordinate delivery), temporary kitchen setup, or post-project deep cleaning.
What Weston Specifically Adds to This Job
Weston isn’t Pembroke Pines, and it isn’t Cooper City. The master-planned structure that makes the city attractive also makes construction more deliberate.
Nearly every full kitchen remodeling project here navigates three approval layers simultaneously: Broward County for code compliance, Weston’s own municipal building department for local amendments, and your village’s Architectural Review Board for aesthetic consistency. Our Weston crew requests the specific ARB design guidelines before we ever submit - Weston’s dozen villages each maintain approved color palettes, roofline standards, and material lists. A window style that passes in Sector 5 can be rejected in The Ridges. Contractors who miss this step, or who don’t know to ask, lose weeks to resubmission.
The housing stock itself shapes what we find when we open walls. Most Weston homes went up between 1990 and 2010 with concrete-block construction, stucco exteriors, and original impact windows that pre-date the strictest post-Andrew HVHZ codes. When a kitchen remodel triggers window replacement - common when you’re opening a wall or upgrading to modern sliding systems - the new units must meet current impact ratings. We factor this into our initial assessment so you’re not surprised by a code-mandated upgrade mid-project.
The soil matters too. Weston sits on reclaimed Everglades fringe with a high water table and organic muck over limestone. Any kitchen expansion that requires foundation work, or even significant slab cutting for plumbing relocation, encounters more moisture and shifting potential than eastern Broward projects. We specify moisture barriers and proper compaction that inland crews sometimes skip.
Homeowners here often pair a full kitchen overhaul with Full Bathroom Remodeling in Weston or Walk-In Showers & Shower Remodeling in Weston - our kitchen remodeling crew coordinates the whole sequence as one build.
Serving Weston, FL - Our Local Coverage Area
We’re based in the Weston area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
Frequently Asked - Full Kitchen Remodeling in Weston
Most projects finish in 6 to 10 weeks after permit approval. The Broward County plus Weston municipal permit process adds 2-4 weeks upfront, and village ARB review can add another 1-3 weeks if your project changes exterior windows or walls. Call (844) 665-0162 and we’ll check your village’s current review timeline.
Yes. Any work involving electrical, plumbing, or structural changes requires Broward County permits and Weston municipal review. If your kitchen remodel touches exterior walls, windows, or the roofline, your village ARB also approves. We handle all three layers as part of our standard process.
Absolutely. Keeping the existing footprint saves $3,000-$8,000 and shortens the timeline by 1-2 weeks. Many Weston kitchens from the 1990s-2000s have functional layouts that respond well to cabinet, counter, and appliance upgrades without relocation. We assess this during your free estimate.
$14,000 covers a straightforward remodel in a smaller kitchen with stock cabinetry, quartz countertops, standard appliances, and no plumbing or electrical relocation. Below that, you’re looking at partial remodeling, not a full gut-and-rebuild. We can walk you through what fits your specific space - estimates are free.
We warranty our workmanship for one year. Manufacturer warranties cover cabinets, countertops, appliances, and fixtures according to each brand’s terms - typically 5 years to lifetime for cabinetry, 10-25 years for quartz surfaces. We register all warranties and provide you the documentation at final walkthrough.
Ready to Start Your Full Kitchen Remodel in Weston?
Call (844) 665-0162 to schedule a free on-site estimate. We’ll walk your kitchen, review your village’s ARB requirements, and deliver an itemized proposal within 48 hours. Our Kitchen Remodeling team builds to spec, not to convenience - you choose the brands and layout, we handle every phase from permit to punch list.
Written by Raymond Estevez, Owner at Groundwork Construction Co., serving Weston and South Florida homeowners since our founding.